  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: Phase Calibrators in the Huygens Field
 Exp. Code:  EA029   


Schedule Version:       1.00                                              
Processed by SCHED version: Release of 18 Sept. 2003                      

PI:       I.M. Avruch                                                     

Address:  JIVE                                                            
          Postbus 2                                                       
          7990AA Dwingeloo                                                
          Netherlands                                                     

Phone:    +31 (0) 521-596-512                                             
EMAIL:    avruch@jive.nl                                                  
Fax:      +31 (0) 521-597-332                                             
Phone during observation: +31 (0) 521-596-512                             

Observing mode: Phase-referencing of sources near Titan at 18cm (512 Mb/s)

Notes:    Wb single dish; Mk5 recorders                                   
                                                                          
                                                                          
                                                                          

Schedule for HART      (Code Hh )                                   Page   2
               Phase Calibrators in the Huygens Field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  19 Feb 2004   Day  50 ---

 Next scan frequencies:  1634.49  1634.49  1634.49  1634.49  1650.49  1650.49
                         1650.49  1650.49  1666.49  1666.49  1666.49  1666.49
                         1682.49  1682.49  1682.49  1682.49
 Next BBC frequencies:    124.49   124.49   124.49   124.49   140.49   140.49
                          140.49   140.49   156.49   156.49   156.49   156.49
                          172.49   172.49   172.49   172.49
 Next scan bandwidths:      8.00     8.00     8.00     8.00     8.00     8.00
                            8.00     8.00     8.00     8.00     8.00     8.00
                            8.00     8.00     8.00     8.00

16 00 00  J0735+2036   03 46 33  17.5  55.8 -3.8       0.0     0   1  1      0  16 00 00
16 01 30  =0732+207    03 48 03  17.7  55.5 -3.8       0.0    90   F  1   1200

16 01 30  J0744+2120   03 48 03  15.6  56.2 -3.9       0.0   -31   1  1   1200  16 01 30
16 04 00  ---          03 50 34  16.1  55.9 -3.9       0.0   119   F  1   3200

16 04 00  J0742+2114   03 50 34  16.6  55.7 -3.9       0.0   -25   1  1   3200  16 04 00
16 07 30  ---          03 54 04  17.2  55.1 -3.8       0.0   185   F  1   6000

16 07 30  J0742+2123   03 54 04  17.1  55.0 -3.8       0.0   -23   1  1   6000  16 07 30
16 11 00  ---          03 57 35  17.7  54.5 -3.8       0.0   187   F  1   8800

16 11 00  J0735+2036   03 57 35  19.5  54.1 -3.6       0.0   -30   1  1   8800  16 11 00
16 13 00  =0732+207    03 59 35  19.9  53.8 -3.6       0.0    90   F  1  10400

16 13 00  J0742+2132   03 59 35  18.2  54.0 -3.7       0.0   -29   1  1  10400  16 13 00
16 16 30  ---          04 03 06  18.8  53.4 -3.7       0.0   181   F  1  13200

16 16 30  J0742+2123   04 03 06  18.7  53.7 -3.7       0.0   -23   1  1  13200  16 16 30
16 20 00  ---          04 06 36  19.4  53.1 -3.6       0.0   187   F  1  16000

16 20 00  J0744+2120   04 06 36  19.1  53.5 -3.6       0.0   -25   1  1  16000  16 20 00
16 22 00  ---          04 08 37  19.4  53.1 -3.6       0.0    95   F  1  17600

16 22 40  J0735+2036   04 09 17  21.6  52.2 -3.4       0.0     8   1  2  17600  16 22 40
16 24 10  =0732+207    04 10 47  21.9  52.0 -3.4       0.0    90   R  1  16400

16 24 10  J0744+2120   04 10 47  19.8  52.8 -3.6       0.0   -31   1  2  16400  16 24 10
16 26 40  ---          04 13 17  20.3  52.4 -3.5       0.0   119   R  1  14400

16 26 40  J0742+2114   04 13 17  20.7  52.2 -3.5       0.0   -25   1  2  14400  16 26 40
16 30 10  ---          04 16 48  21.3  51.6 -3.4       0.0   185   R  1  11600
Schedule for HART      (Code Hh )                                   Page   3
               Phase Calibrators in the Huygens Field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  19 Feb 2004   Day  50 ---

16 30 10  J0742+2123   04 16 48  21.2  51.5 -3.4       0.0   -23   1  2  11600  16 30 10
16 33 40  ---          04 20 19  21.8  50.9 -3.4       0.0   187   R  1   8800

16 33 40  J0735+2036   04 20 19  23.5  50.4 -3.3       0.0   -30   1  2   8800  16 33 40
16 35 40  =0732+207    04 22 19  23.9  50.0 -3.2       0.0    90   R  1   7200

16 35 40  J0742+2132   04 22 19  22.2  50.3 -3.3       0.0   -29   1  2   7200  16 35 40
16 39 10  ---          04 25 50  22.8  49.7 -3.3       0.0   181   R  1   4400

16 39 10  J0742+2123   04 25 50  22.7  50.0 -3.3       0.0   -23   1  2   4400  16 39 10
16 42 40  ---          04 29 20  23.3  49.4 -3.2       0.0   187   R  1   1600

16 42 40  J0744+2120   04 29 20  23.1  49.8 -3.3       0.0   -25   1  2   1600  16 42 40
16 44 40  ---          04 31 20  23.4  49.4 -3.2       0.0    95   R  1      0

16 45 20  J0735+2036   04 32 01  25.5  48.3 -3.1       0.0     8   1  3      0  16 45 20
16 46 50  =0732+207    04 33 31  25.8  48.0 -3.0       0.0    90   F  1   1200

16 46 50  J0744+2120   04 33 31  23.8  49.0 -3.2       0.0   -31   1  3   1200  16 46 50
16 49 20  ---          04 36 01  24.2  48.6 -3.2       0.0   119   F  1   3200

16 49 20  J0742+2114   04 36 01  24.6  48.3 -3.1       0.0   -25   1  3   3200  16 49 20
16 52 50  ---          04 39 32  25.2  47.7 -3.1       0.0   185   F  1   6000

16 52 50  J0742+2123   04 39 32  25.1  47.6 -3.1       0.0   -23   1  3   6000  16 52 50
16 56 20  ---          04 43 02  25.6  46.9 -3.0       0.0   187   F  1   8800

16 56 20  J0735+2036   04 43 02  27.4  46.3 -2.9       0.0   -30   1  3   8800  16 56 20
16 58 20  =0732+207    04 45 03  27.7  45.9 -2.9       0.0    90   F  1  10400

16 58 20  J0742+2132   04 45 03  26.0  46.3 -3.0       0.0   -29   1  3  10400  16 58 20
17 01 50  ---          04 48 33  26.6  45.7 -2.9       0.0   181   F  1  13200

17 01 50  J0742+2123   04 48 33  26.5  45.9 -2.9       0.0   -23   1  3  13200  17 01 50
17 05 20  ---          04 52 04  27.1  45.3 -2.9       0.0   187   F  1  16000

17 05 20  J0744+2120   04 52 04  26.9  45.7 -2.9       0.0   -25   1  3  16000  17 05 20
17 07 20  ---          04 54 04  27.2  45.3 -2.8       0.0    95   F  1  17600

17 08 00  0735+178     04 54 44  31.0  46.7 -2.7       0.0     6   1  4  17600  17 08 00
17 14 00  ---          05 00 45  32.0  45.5 -2.6       0.0   360   R  1  12800

17 14 00  J0735+2036   05 00 45  30.1  42.8 -2.6       0.0   -33   1  4  12800  17 14 00
17 16 30  =0732+207    05 03 16  30.5  42.2 -2.5       0.0   117   R  1  10800
Schedule for HART      (Code Hh )                                   Page   4
               Phase Calibrators in the Huygens Field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  19 Feb 2004   Day  50 ---

17 16 30  J0744+2120   05 03 16  28.6  43.5 -2.7       0.0   -31   1  4  10800  17 16 30
17 21 30  ---          05 08 16  29.4  42.5 -2.6       0.0   269   R  1   6800

17 21 30  J0735+2036   05 08 16  31.3  41.2 -2.5       0.0   -31   1  4   6800  17 21 30
17 24 00  =0732+207    05 10 47  31.6  40.7 -2.4       0.0   119   R  1   4800

17 24 00  J0744+2120   05 10 47  29.8  42.0 -2.6       0.0   -31   1  4   4800  17 24 00
17 30 00  ---          05 16 48  30.7  40.7 -2.5       0.0   329   R  1      0

17 30 40  J0735+2036   05 17 28  32.6  39.2 -2.3       0.0     8   1  5      0  17 30 40
17 32 10  =0732+207    05 18 58  32.8  38.9 -2.3       0.0    90   F  1   1200

17 32 10  J0744+2120   05 18 58  31.0  40.3 -2.4       0.0   -31   1  5   1200  17 32 10
17 34 40  ---          05 21 29  31.3  39.7 -2.4       0.0   119   F  1   3200

17 34 40  J0742+2114   05 21 29  31.7  39.4 -2.4       0.0   -25   1  5   3200  17 34 40
17 38 10  ---          05 24 59  32.2  38.6 -2.3       0.0   185   F  1   6000

17 38 10  J0742+2123   05 24 59  32.1  38.5 -2.3       0.0   -23   1  5   6000  17 38 10
17 41 40  ---          05 28 30  32.5  37.8 -2.2       0.0   187   F  1   8800

17 41 40  J0735+2036   05 28 30  34.1  36.7 -2.1       0.0   -30   1  5   8800  17 41 40
17 43 40  =0732+207    05 30 30  34.4  36.2 -2.1       0.0    90   F  1  10400

17 43 40  J0742+2132   05 30 30  32.8  37.0 -2.2       0.0   -29   1  5  10400  17 43 40
17 47 10  ---          05 34 01  33.3  36.2 -2.1       0.0   181   F  1  13200

17 47 10  J0742+2123   05 34 01  33.3  36.5 -2.2       0.0   -23   1  5  13200  17 47 10
17 50 40  ---          05 37 31  33.8  35.7 -2.1       0.0   187   F  1  16000

17 50 40  J0744+2120   05 37 31  33.6  36.2 -2.1       0.0   -25   1  5  16000  17 50 40
17 52 40  ---          05 39 32  33.8  35.7 -2.1       0.0    95   F  1  17600

17 53 20  J0735+2036   05 40 12  35.7  33.9 -1.9       0.0     8   1  6  17600  17 53 20
17 54 50  =0732+207    05 41 42  35.8  33.6 -1.9       0.0    90   R  1  16400

17 54 50  J0744+2120   05 41 42  34.1  35.2 -2.1       0.0   -31   1  6  16400  17 54 50
17 57 20  ---          05 44 12  34.4  34.6 -2.0       0.0   119   R  1  14400

17 57 20  J0742+2114   05 44 12  34.8  34.2 -2.0       0.0   -25   1  6  14400  17 57 20
18 00 50  ---          05 47 43  35.2  33.4 -1.9       0.0   185   R  1  11600

18 00 50  J0742+2123   05 47 43  35.1  33.3 -1.9       0.0   -23   1  6  11600  18 00 50
18 04 20  ---          05 51 13  35.5  32.5 -1.9       0.0   187   R  1   8800
Schedule for HART      (Code Hh )                                   Page   5
               Phase Calibrators in the Huygens Field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  19 Feb 2004   Day  50 ---

18 04 20  J0735+2036   05 51 13  37.0  31.2 -1.7       0.0   -30   1  6   8800  18 04 20
18 06 20  =0732+207    05 53 14  37.2  30.7 -1.7       0.0    90   R  1   7200

18 06 20  J0742+2132   05 53 14  35.7  31.7 -1.8       0.0   -29   1  6   7200  18 06 20
18 09 50  ---          05 56 44  36.1  30.8 -1.8       0.0   181   R  1   4400

18 09 50  J0742+2123   05 56 44  36.1  31.1 -1.8       0.0   -23   1  6   4400  18 09 50
18 13 20  ---          06 00 15  36.5  30.2 -1.7       0.0   187   R  1   1600

18 13 20  J0744+2120   06 00 15  36.4  30.7 -1.7       0.0   -25   1  6   1600  18 13 20
18 15 20  ---          06 02 15  36.6  30.2 -1.7       0.0    95   R  1      0

-----------  Tape Change ------------

18 30 20  J0735+2036   06 17 18  39.7  24.2 -1.3       0.0   861   1  1      0  18 30 20
18 31 50  =0732+207    06 18 48  39.9  23.8 -1.3       0.0    90   F  1   1200

18 31 50  J0744+2120   06 18 48  38.4  25.9 -1.4       0.0   -31   1  1   1200  18 31 50
18 34 20  ---          06 21 18  38.6  25.2 -1.4       0.0   119   F  1   3200

18 34 20  J0742+2114   06 21 18  38.9  24.7 -1.4       0.0   -25   1  1   3200  18 34 20
18 37 50  ---          06 24 49  39.2  23.7 -1.3       0.0   185   F  1   6000

18 37 50  J0742+2123   06 24 49  39.0  23.7 -1.3       0.0   -23   1  1   6000  18 37 50
18 41 20  ---          06 28 20  39.4  22.7 -1.2       0.0   187   F  1   8800

18 41 20  J0735+2036   06 28 20  40.7  21.1 -1.1       0.0   -30   1  1   8800  18 41 20
18 43 20  =0732+207    06 30 20  40.8  20.5 -1.1       0.0    90   F  1  10400

18 43 20  J0742+2132   06 30 20  39.5  21.9 -1.2       0.0   -29   1  1  10400  18 43 20
18 46 50  ---          06 33 50  39.8  20.9 -1.1       0.0   181   F  1  13200

18 46 50  J0742+2123   06 33 50  39.8  21.2 -1.2       0.0   -23   1  1  13200  18 46 50
18 50 20  ---          06 37 21  40.1  20.2 -1.1       0.0   187   F  1  16000

18 50 20  J0744+2120   06 37 21  40.0  20.7 -1.1       0.0   -25   1  1  16000  18 50 20
18 52 20  ---          06 39 21  40.2  20.2 -1.1       0.0    95   F  1  17600

18 53 00  J0735+2036   06 40 01  41.6  17.6 -0.9       0.0     8   1  2  17600  18 53 00
18 54 30  =0732+207    06 41 32  41.7  17.2 -0.9       0.0    90   R  1  16400

18 54 30  J0744+2120   06 41 32  40.3  19.5 -1.1       0.0   -31   1  2  16400  18 54 30
18 57 00  ---          06 44 02  40.5  18.8 -1.0       0.0   119   R  1  14400
Schedule for HART      (Code Hh )                                   Page   6
               Phase Calibrators in the Huygens Field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  19 Feb 2004   Day  50 ---

18 57 00  J0742+2114   06 44 02  40.8  18.2 -1.0       0.0   -25   1  2  14400  18 57 00
19 00 30  ---          06 47 33  41.0  17.2 -0.9       0.0   185   R  1  11600

19 00 30  J0742+2123   06 47 33  40.8  17.2 -0.9       0.0   -23   1  2  11600  19 00 30
19 04 00  ---          06 51 03  41.1  16.2 -0.9       0.0   187   R  1   8800

19 04 00  J0735+2036   06 51 03  42.2  14.3 -0.8       0.0   -30   1  2   8800  19 04 00
19 06 00  =0732+207    06 53 04  42.3  13.7 -0.7       0.0    90   R  1   7200

19 06 00  J0742+2132   06 53 04  41.1  15.3 -0.8       0.0   -29   1  2   7200  19 06 00
19 09 30  ---          06 56 34  41.3  14.2 -0.8       0.0   181   R  1   4400

19 09 30  J0742+2123   06 56 34  41.4  14.5 -0.8       0.0   -23   1  2   4400  19 09 30
19 13 00  ---          07 00 05  41.6  13.5 -0.7       0.0   187   R  1   1600

19 13 00  J0744+2120   07 00 05  41.5  14.0 -0.7       0.0   -25   1  2   1600  19 13 00
19 15 00  ---          07 02 05  41.7  13.4 -0.7       0.0    95   R  1      0

19 15 40  J0735+2036   07 02 45  42.8  10.7 -0.6       0.0     8   1  3      0  19 15 40
19 17 10  =0732+207    07 04 15  42.9  10.2 -0.5       0.0    90   F  1   1200

19 17 10  J0744+2120   07 04 15  41.8  12.8 -0.7       0.0   -31   1  3   1200  19 17 10
19 19 40  ---          07 06 46  41.9  12.0 -0.6       0.0   119   F  1   3200

19 19 40  J0742+2114   07 06 46  42.1  11.4 -0.6       0.0   -25   1  3   3200  19 19 40
19 23 10  ---          07 10 16  42.2  10.3 -0.5       0.0   185   F  1   6000

19 23 10  J0742+2123   07 10 16  42.1  10.3 -0.5       0.0   -23   1  3   6000  19 23 10
19 26 40  ---          07 13 47  42.2   9.2 -0.5       0.0   187   F  1   8800

19 26 40  J0735+2036   07 13 47  43.2   7.2 -0.4       0.0   -30   1  3   8800  19 26 40
19 28 40  =0732+207    07 15 47  43.2   6.5 -0.3       0.0    90   F  1  10400

19 28 40  J0742+2132   07 15 47  42.1   8.3 -0.4       0.0   -29   1  3  10400  19 28 40
19 32 10  ---          07 19 18  42.3   7.2 -0.4       0.0   181   F  1  13200

19 32 10  J0742+2123   07 19 18  42.4   7.5 -0.4       0.0   -23   1  3  13200  19 32 10
19 35 40  ---          07 22 49  42.5   6.4 -0.3       0.0   187   F  1  16000

19 35 40  J0744+2120   07 22 49  42.5   7.0 -0.4       0.0   -25   1  3  16000  19 35 40
19 37 40  ---          07 24 49  42.5   6.4 -0.3       0.0    95   F  1  17600

19 38 20  0735+178     07 25 29  46.3   4.4 -0.2       0.0     6   1  4  17600  19 38 20
19 44 20  ---          07 31 30  46.4   2.4 -0.1       0.0   360   R  1  12800
Schedule for HART      (Code Hh )                                   Page   7
               Phase Calibrators in the Huygens Field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  19 Feb 2004   Day  50 ---

19 44 20  J0735+2036   07 31 30  43.5   1.5 -0.1       0.0   -33   1  4  12800  19 44 20
19 46 20  =0732+207    07 33 30  43.5   0.8  0.0       0.0    87   R  1  11200

19 46 20  J0744+2120   07 33 30  42.7   3.7 -0.2       0.0   -31   1  4  11200  19 46 20
19 48 50  ---          07 36 01  42.7   2.9 -0.2       0.0   119   R  1   9200

19 48 50  J0742+2123   07 36 01  42.7   2.3 -0.1       0.0   -25   1  4   9200  19 48 50
19 52 20  ---          07 39 31  42.7   1.2 -0.1       0.0   185   R  1   6400

19 52 20  J0735+2036   07 39 31  43.5 358.9  0.1       0.0   -30   1  4   6400  19 52 20
19 54 20  =0732+207    07 41 32  43.5 358.3  0.1       0.0    90   R  1   4800

19 54 20  J0742+2123   07 41 32  42.7   0.5  0.0       0.0   -30   1  4   4800  19 54 20
19 58 20  ---          07 45 32  42.7 359.2  0.0       0.0   210   R  1   1600

19 58 20  J0744+2120   07 45 32  42.8 359.8  0.0       0.0   -25   1  4   1600  19 58 20
20 00 00  ---          07 47 13  42.8 359.3  0.0       0.0    75   R  1    267


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: ea029.18cm
   Matches group hh18cm in /aps3/sched/catalogs/freq.dat
    Values confirmed by E-mail Jonathan Quick 291100 (CR)

   Setup group:    8         Station: HART              Total bit rate:  512
   Format: MKIV1:2           Bits per sample: 2         Sample rate: 16.000
   Number of channels: 16    Passes/head pos:   1       Speedup factor:   1.00

   Tape speeds: Low density - 270.000 ips,  High density - 160.00 ips
   Time per pass for  17600 ft, High density tapes is: 00:22:00
   Two heads will be used.  Required by this setup.

   1st LO=   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00
             1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         2         1         2         1         4         3         4         3
                   6         5         6         5         8         7         8         7
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        2N        1N        2N        1N        2N        1N        2N        1N
                  2N        1N        2N        1N        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:   8  Setup file default.  No pcal detection.
   LO sum=    1634.49   1634.49   1634.49   1634.49   1650.49   1650.49   1650.49   1650.49
              1666.49   1666.49   1666.49   1666.49   1682.49   1682.49   1682.49   1682.49
   BBC fr=     124.49    124.49    124.49    124.49    140.49    140.49    140.49    140.49
               156.49    156.49    156.49    156.49    172.49    172.49    172.49    172.49
   Bandwd=      8.000     8.000     8.000     8.000     8.000     8.000     8.000     8.000
                8.000     8.000     8.000     8.000     8.000     8.000     8.000     8.000

   Track assignments are: 
    track1=   2, 10, 18, 26,  3, 11, 19, 27, 66, 74, 82, 90, 67, 75, 83, 91
    barrel=roll_off 
 SOURCE LIST -- Phase Calibrators in the Huygens Field
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).

   Source                         Source position (RA/Dec) 
                        (B1950)           (J2000)           (Date) 

 * J0744+2120        07 41 49.975805   * 07 44 47.277000     07 45 02.463948 
                     21 27 16.93999    * 21 20 00.40500      21 19 28.75580 
                     From catalog imbedded in main SCHED input file.

 * J0742+2114        07 39 45.092922   * 07 42 42.375000     07 42 57.551459 
                     21 21 12.34669    * 21 14 04.02100      21 13 33.07585 
                     From catalog imbedded in main SCHED input file.

 * J0742+2123        07 39 57.230873   * 07 42 54.703000     07 43 09.897079 
                     21 31 05.23117    * 21 23 56.10000      21 23 25.11793 
                     From catalog imbedded in main SCHED input file.

 * J0742+2132        07 39 07.197085   * 07 42 04.878000     07 42 20.086940 
                     21 39 19.88053    * 21 32 14.04000      21 31 43.37700 
                     From catalog imbedded in main SCHED input file.

 * J0735+2036        07 32 55.909169   * 07 35 52.743100     07 36 07.851079 
   0732+207          20 43 19.99800    * 20 36 38.82700      20 36 10.13591 
                     /aps3/sched/catalogs/sources.vlba
                     JVAS - Wilkinson et al. 1998, mnras, 300, 790; S8.4GHz=   154 mJy

   J0738+1742        07 35 14.126459   * 07 38 07.393747     07 38 22.200243 
 * 0735+178          17 49 09.26248    * 17 42 18.99827      17 41 48.89730 
   J0738+17          /aps3/sched/catalogs/sources.vlba
                     ICRF - Ext.1 Source - 1998 IERS Annual Report



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   J0744+2120         143.9
   J0742+2114         143.4
   J0742+2123         143.5
   J0742+2132         143.2
   J0735+2036         142.0
   0735+178           142.8

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

