  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: Network Monitoring Expt
 Exp. Code:  N06C1   


Schedule Version:       1.00                                              
Processed by SCHED version:   6.02  July 2005                             

PI:       Zsolt Paragi                                                    

Address:  JIVE                                                            
          Postbus 2                                                       
          7990 AA Dwingeloo                                               
          The Netherlands                                                 

Phone:    +31-521-596536                                                  
EMAIL:    paragi@jive.nl                                                  
Fax:                                                                      
Phone during observation: +31-521-596536                                  

Observing mode:                                                           

Notes:    C-band NME (256 Mbps, 2-bit sampling, 8 MHz filters) for session
          Please send the disk pack by express to JIVE                    
                                                                          
                                                                          

Schedule for HART      (Code Hh )                                   Page   2
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Thu  16 Feb 2006   Day  47 ---

 Next scan frequencies:  4974.49  4974.49  4982.49  4982.49  4990.49  4990.49
                         4998.49  4998.49
 Next BBC frequencies:    374.49   374.49   382.49   382.49   390.49   390.49
                          398.49   398.49
 Next scan bandwidths:      8.00     8.00     8.00     8.00     8.00     8.00
                            8.00     8.00

13 00 00  3C84         00 36 16  12.6  30.2 -2.7       0.0     0   1  1      0  13 00 00
13 15 00  ---          00 51 18  14.3  27.9 -2.5       0.0   900   F  1      0  13 00 13

13 17 00  3C84         00 53 19  14.5  27.5 -2.4       0.0    95   1  1      0  13 17 00
13 32 00  ---          01 08 21  16.0  25.1 -2.2       0.0   900   F  1      0  13 17 13

13 34 00  0234+285     01 10 21  31.4  22.6 -1.5       0.0    68   1  1      0  13 34 00
13 49 00  ---          01 25 24  32.6  18.9 -1.2       0.0   900   F  1      0  13 34 13

13 51 00  0234+285     01 27 24  32.7  18.5 -1.2       0.0    95   1  1      0  13 51 00
14 06 00  ---          01 42 27  33.7  14.7 -0.9       0.0   900   F  1      0  13 51 13

14 51 30  DA193        02 28 04   8.4  37.7 -3.5       0.0  2627   1  1      0  14 51 30
14 53 00  ---          02 29 34   8.6  37.5 -3.4       0.0    90   F  1      0  14 51 43

14 56 30  DA193        02 33 05   9.1  37.0 -3.4       0.0   183   1  1      0  14 56 30
14 58 00  ---          02 34 35   9.3  36.8 -3.4       0.0    90   F  1      0  14 56 43

15 01 30  DA193        02 38 06   9.8  36.3 -3.3       0.0   183   1  1      0  15 01 30
15 03 00  ---          02 39 36  10.0  36.1 -3.3       0.0    90   F  1      0  15 01 43

15 03 00  J0605+4030   02 39 36   8.1  37.0 -3.4       0.0   -32   1  1      0  15 03 00
15 06 30  =0602+405    02 43 07   8.6  36.6 -3.4       0.0   178   F  1      0  15 03 13

15 06 30  DA193        02 43 07  10.4  35.6 -3.2       0.0   -32   1  1      0  15 06 30
15 08 00  ---          02 44 37  10.6  35.4 -3.2       0.0    58   F  1      0  15 06 43

15 10 00  J0605+4030   02 46 37   9.0  36.1 -3.3       0.0    89   1  1      0  15 10 00
15 13 30  =0602+405    02 50 08   9.5  35.6 -3.3       0.0   210   F  1      0  15 10 13

15 13 30  DA193        02 50 08  11.3  34.6 -3.1       0.0   -32   1  1      0  15 13 30
15 15 00  ---          02 51 38  11.5  34.4 -3.1       0.0    58   F  1      0  15 13 43

15 15 00  J0605+4030   02 51 38   9.7  35.4 -3.2       0.0   -32   1  1      0  15 15 00
15 18 30  =0602+405    02 55 09  10.1  34.9 -3.2       0.0   178   F  1      0  15 15 13
Schedule for HART      (Code Hh )                                   Page   3
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Thu  16 Feb 2006   Day  47 ---

15 18 30  DA193        02 55 09  12.0  33.9 -3.0       0.0   -32   1  1      0  15 18 30
15 20 00  ---          02 56 39  12.1  33.6 -3.0       0.0    58   F  1      0  15 18 43

15 20 00  J0605+4030   02 56 39  10.3  34.7 -3.2       0.0   -32   1  1      0  15 20 00
15 23 30  =0602+405    03 00 09  10.8  34.2 -3.1       0.0   178   F  1      0  15 20 13

15 23 30  DA193        03 00 09  12.6  33.1 -2.9       0.0   -32   1  1      0  15 23 30
15 25 00  ---          03 01 40  12.8  32.9 -2.9       0.0    58   F  1      0  15 23 43

15 25 00  J0605+4030   03 01 40  11.0  34.0 -3.1       0.0   -32   1  1      0  15 25 00
15 28 30  =0602+405    03 05 10  11.4  33.4 -3.0       0.0   178   F  1      0  15 25 13

15 28 30  DA193        03 05 10  13.2  32.3 -2.8       0.0   -32   1  1      0  15 28 30
15 30 00  ---          03 06 40  13.4  32.1 -2.8       0.0    58   F  1      0  15 28 43

15 32 00  J0605+4030   03 08 41  11.8  32.9 -3.0       0.0    89   1  1      0  15 32 00
15 35 30  =0602+405    03 12 11  12.3  32.4 -2.9       0.0   210   F  1      0  15 32 13

15 35 30  DA193        03 12 11  14.0  31.3 -2.7       0.0   -32   1  1      0  15 35 30
15 37 00  ---          03 13 42  14.2  31.0 -2.7       0.0    58   F  1      0  15 35 43

15 37 00  J0605+4030   03 13 42  12.4  32.2 -2.9       0.0   -32   1  1      0  15 37 00
15 40 30  =0602+405    03 17 12  12.9  31.6 -2.8       0.0   178   F  1      0  15 37 13

15 40 30  DA193        03 17 12  14.6  30.5 -2.6       0.0   -32   1  1      0  15 40 30
15 42 00  ---          03 18 42  14.8  30.2 -2.6       0.0    58   F  1      0  15 40 43

15 42 00  J0605+4030   03 18 42  13.0  31.4 -2.8       0.0   -32   1  1      0  15 42 00
15 45 30  =0602+405    03 22 13  13.4  30.9 -2.7       0.0   178   F  1      0  15 42 13

15 45 30  DA193        03 22 13  15.2  29.6 -2.6       0.0   -32   1  1      0  15 45 30
15 47 00  ---          03 23 43  15.3  29.4 -2.5       0.0    58   F  1      0  15 45 43

15 47 00  J0605+4030   03 23 43  13.6  30.6 -2.7       0.0   -32   1  1      0  15 47 00
15 50 30  =0602+405    03 27 14  14.0  30.1 -2.7       0.0   178   F  1      0  15 47 13

15 50 30  DA193        03 27 14  15.7  28.8 -2.5       0.0   -32   1  1      0  15 50 30
15 52 00  ---          03 28 44  15.9  28.6 -2.5       0.0    58   F  1      0  15 50 43

15 54 00  J0605+4030   03 30 44  14.4  29.5 -2.6       0.0    89   1  1      0  15 54 00
15 57 30  =0602+405    03 34 15  14.8  29.0 -2.5       0.0   210   F  1      0  15 54 13

15 57 30  DA193        03 34 15  16.5  27.7 -2.4       0.0   -32   1  1      0  15 57 30
15 59 00  ---          03 35 45  16.6  27.4 -2.3       0.0    58   F  1      0  15 57 43
Schedule for HART      (Code Hh )                                   Page   4
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Thu  16 Feb 2006   Day  47 ---

15 59 00  J0605+4030   03 35 45  15.0  28.7 -2.5       0.0   -32   1  1      0  15 59 00
16 02 30  =0602+405    03 39 16  15.3  28.2 -2.5       0.0   178   F  1      0  15 59 13

16 02 30  DA193        03 39 16  17.0  26.8 -2.3       0.0   -32   1  1      0  16 02 30
16 04 00  ---          03 40 46  17.1  26.6 -2.3       0.0    58   F  1      0  16 02 43

16 04 00  J0605+4030   03 40 46  15.5  27.9 -2.4       0.0   -32   1  1      0  16 04 00
16 07 30  =0602+405    03 44 17  15.9  27.3 -2.4       0.0   178   F  1      0  16 04 13

16 07 30  DA193        03 44 17  17.5  26.0 -2.2       0.0   -32   1  1      0  16 07 30
16 09 00  ---          03 45 47  17.6  25.7 -2.2       0.0    58   F  1      0  16 07 43

16 09 00  J0605+4030   03 45 47  16.0  27.1 -2.3       0.0   -32   1  1      0  16 09 00
16 12 30  =0602+405    03 49 17  16.4  26.5 -2.3       0.0   178   F  1      0  16 09 13

16 12 30  DA193        03 49 17  18.0  25.1 -2.1       0.0   -32   1  1      0  16 12 30
16 14 00  ---          03 50 48  18.1  24.8 -2.1       0.0    58   F  1      0  16 12 43

16 16 00  J0605+4030   03 52 48  16.7  25.9 -2.2       0.0    89   1  1      0  16 16 00
16 19 30  =0602+405    03 56 19  17.1  25.3 -2.2       0.0   210   F  1      0  16 16 13

16 19 30  DA193        03 56 19  18.6  23.8 -2.0       0.0   -32   1  1      0  16 19 30
16 21 00  ---          03 57 49  18.8  23.6 -2.0       0.0    58   F  1      0  16 19 43

16 21 00  J0605+4030   03 57 49  17.2  25.0 -2.1       0.0   -32   1  1      0  16 21 00
16 24 30  =0602+405    04 01 19  17.5  24.4 -2.1       0.0   178   F  1      0  16 21 13

16 24 30  DA193        04 01 19  19.1  22.9 -1.9       0.0   -32   1  1      0  16 24 30
16 26 00  ---          04 02 50  19.2  22.7 -1.9       0.0    58   F  1      0  16 24 43

16 26 00  J0605+4030   04 02 50  17.7  24.2 -2.1       0.0   -32   1  1      0  16 26 00
16 29 30  =0602+405    04 06 20  18.0  23.6 -2.0       0.0   178   F  1      0  16 26 13

16 29 30  DA193        04 06 20  19.5  22.0 -1.8       0.0   -32   1  1      0  16 29 30
16 31 00  ---          04 07 50  19.6  21.8 -1.8       0.0    58   F  1      0  16 29 43

16 31 00  J0605+4030   04 07 50  18.1  23.3 -2.0       0.0   -32   1  1      0  16 31 00
16 34 30  =0602+405    04 11 21  18.4  22.7 -1.9       0.0   178   F  1      0  16 31 13

16 34 30  DA193        04 11 21  19.9  21.1 -1.7       0.0   -32   1  1      0  16 34 30
16 36 00  ---          04 12 51  20.0  20.8 -1.7       0.0    58   F  1      0  16 34 43

16 38 00  J0605+4030   04 14 52  18.7  22.0 -1.9       0.0    89   1  1      0  16 38 00
16 41 30  =0602+405    04 18 22  19.0  21.4 -1.8       0.0   210   F  1      0  16 38 13
Schedule for HART      (Code Hh )                                   Page   5
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Thu  16 Feb 2006   Day  47 ---

16 41 30  DA193        04 18 22  20.5  19.8 -1.6       0.0   -32   1  1      0  16 41 30
16 43 00  ---          04 19 52  20.6  19.5 -1.6       0.0    58   F  1      0  16 41 43

16 43 00  J0605+4030   04 19 52  19.1  21.1 -1.8       0.0   -32   1  1      0  16 43 00
16 46 30  =0602+405    04 23 23  19.4  20.5 -1.7       0.0   178   F  1      0  16 43 13

16 46 30  DA193        04 23 23  20.8  18.8 -1.5       0.0   -32   1  1      0  16 46 30
16 48 00  ---          04 24 53  20.9  18.6 -1.5       0.0    58   F  1      0  16 46 43

16 50 00  DA193        04 26 54  21.1  18.2 -1.5       0.0    95   1  1      0  16 50 00
17 00 00  ---          04 36 55  21.8  16.2 -1.3       0.0   600   F  1      0  16 50 13


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: NME.6CM
   Matches group hh6cm in /aps3/sched/catalogs/freq.dat
    Values confirmed by E-mail Jonathan Quick 221105 (CR)

   Setup group:   10         Station: HART              Total bit rate:  256
   Format: MKIV1:2           Bits per sample: 2         Sample rate: 16.000
   Number of channels:  8                               Speedup factor:   1.00

   Disk used to record data.

   1st LO=   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00
   Net SB=         U         U         U         U         U         U         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         2         1         4         3         6         5         8         7
   BBC SB=         U         U         U         U         U         U         U         U
   IF    =        2N        1N        2N        1N        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:  10  Setup file default.  No pcal detection.
   LO sum=    4974.49   4974.49   4982.49   4982.49   4990.49   4990.49   4998.49   4998.49
   BBC fr=     374.49    374.49    382.49    382.49    390.49    390.49    398.49    398.49
   Bandwd=      8.000     8.000     8.000     8.000     8.000     8.000     8.000     8.000

   Track assignments are: 
    track1=   2, 10, 18, 26,  3, 11, 19, 27
    barrel=roll_off 
 SOURCE LIST -- Network Monitoring Expt
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

   J0237+2848        02 34 55.589591   * 02 37 52.405678     02 38 13.408973       0.23
 * 0234+285          28 35 11.40780    * 28 48 08.99005      28 49 52.55399        0.40
   J0237+28          /aps3/sched/catalogs/sources.vlba
                     VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.500 scan hours,     22.500 baseline hours above horizon.

   J0319+4130        03 16 29.567289   * 03 19 48.160119     03 20 12.001678       0.28
   0316+413          41 19 51.91675    * 41 30 42.10387      41 32 15.81985        0.41
 * 3C84              /aps3/sched/catalogs/sources.vlba
   J0319+41          VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.500 scan hours,     22.500 baseline hours above horizon.

   J0555+3948        05 52 01.407172   * 05 55 30.805614     05 55 57.358891       0.26
   0552+398          39 48 21.94585    * 39 48 49.16500      39 49 05.89176        0.40
 * DA193             /aps3/sched/catalogs/sources.vlba
   J0555+39          VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.917 scan hours,     31.796 baseline hours above horizon.

 * J0605+4030        06 02 20.058847   * 06 05 50.855367     06 06 17.671819       0.28
   0602+405          40 30 26.00792    * 40 30 08.10359      40 30 19.17149        0.42
                     /aps3/sched/catalogs/sources.vlba
                     VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        1.633 scan hours,     63.098 baseline hours above horizon.



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   0234+285            78.7
   3C84                90.8
   DA193              120.0
   J0605+4030         121.8

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

