  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: Network Monitoring Expt
 Exp. Code:  N06M1   


Schedule Version:       1.00                                              
Processed by SCHED version:   6.02  July 2005                             

PI:       Zsolt Paragi                                                    

Address:  JIVE                                                            
          Postbus 2                                                       
          7990 AA Dwingeloo                                               
          The Netherlands                                                 

Phone:    +31-521-596536                                                  
EMAIL:    paragi@jive.nl                                                  
Fax:                                                                      
Phone during observation: +31-521-596536                                  

Observing mode:                                                           

Notes:    5cm NME (128 Mbps, 2-bit sampling, 2 MHz filters) for session 1/
          Please send the disk pack by express to JIVE                    
                                                                          
                                                                          

Schedule for HART      (Code Hh )                                   Page   2
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed  22 Feb 2006   Day  53 ---

 Next scan frequencies:  6665.00  6665.00  6665.00  6665.00  6669.00  6669.00
                         6669.00  6669.00  6673.00  6673.00  6673.00  6673.00
                         6677.00  6677.00  6677.00  6677.00
 Next BBC frequencies:    155.00   155.00   155.00   155.00   159.00   159.00
                          159.00   159.00   163.00   163.00   163.00   163.00
                          167.00   167.00   167.00   167.00
 Next scan bandwidths:      2.00     2.00     2.00     2.00     2.00     2.00
                            2.00     2.00     2.00     2.00     2.00     2.00
                            2.00     2.00     2.00     2.00

14 00 00  3C84         02 00 05  20.1  15.8 -1.3       0.0     0   1  1      0  14 00 00
14 10 00  ---          02 10 07  20.6  13.9 -1.2       0.0   600   F  1      0  14 00 13

14 12 00  3C84         02 12 07  20.8  13.6 -1.1       0.0    95   1  1      0  14 12 00
14 22 00  ---          02 22 09  21.2  11.6 -1.0       0.0   600   F  1      0  14 12 13

14 24 00  0234+285     02 24 09  35.2   3.8 -0.2       0.0    68   1  1      0  14 24 00
14 34 00  ---          02 34 11  35.3   1.1 -0.1       0.0   600   F  1      0  14 24 13

14 36 00  0234+285     02 36 11  35.3   0.5  0.0       0.0    95   1  1      0  14 36 00
14 46 00  ---          02 46 13  35.2 357.9  0.1       0.0   600   F  1      0  14 36 13

14 51 00  DA193        02 51 13  11.5  34.4 -3.1       0.0   177   1  1      0  14 51 00
14 54 00  ---          02 54 14  11.8  34.0 -3.0       0.0   180   F  1      0  14 51 13

14 54 00  J0605+4030   02 54 14  10.0  35.0 -3.2       0.0   -32   1  1      0  14 54 00
14 57 30  =0602+405    02 57 44  10.5  34.5 -3.1       0.0   178   F  1      0  14 54 13

14 57 30  DA193        02 57 44  12.3  33.5 -3.0       0.0   -32   1  1      0  14 57 30
14 59 00  ---          02 59 15  12.5  33.2 -2.9       0.0    58   F  1      0  14 57 43

14 59 00  J0605+4030   02 59 15  10.7  34.3 -3.1       0.0   -32   1  1      0  14 59 00
15 02 30  =0602+405    03 02 45  11.1  33.8 -3.1       0.0   178   F  1      0  14 59 13

15 02 30  DA193        03 02 45  12.9  32.7 -2.9       0.0   -32   1  1      0  15 02 30
15 04 00  ---          03 04 16  13.1  32.5 -2.9       0.0    58   F  1      0  15 02 43

15 06 00  J0605+4030   03 06 16  11.5  33.3 -3.0       0.0    89   1  1      0  15 06 00
15 09 30  =0602+405    03 09 46  12.0  32.8 -2.9       0.0   210   F  1      0  15 06 13

15 09 30  DA193        03 09 46  13.7  31.6 -2.8       0.0   -32   1  1      0  15 09 30
15 11 00  ---          03 11 17  13.9  31.4 -2.7       0.0    58   F  1      0  15 09 43
Schedule for HART      (Code Hh )                                   Page   3
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed  22 Feb 2006   Day  53 ---

15 11 00  J0605+4030   03 11 17  12.2  32.5 -2.9       0.0   -32   1  1      0  15 11 00
15 14 30  =0602+405    03 14 47  12.6  32.0 -2.9       0.0   178   F  1      0  15 11 13

15 14 30  DA193        03 14 47  14.3  30.8 -2.7       0.0   -32   1  1      0  15 14 30
15 16 00  ---          03 16 17  14.5  30.6 -2.7       0.0    58   F  1      0  15 14 43

15 16 00  J0605+4030   03 16 17  12.8  31.8 -2.8       0.0   -32   1  1      0  15 16 00
15 19 30  =0602+405    03 19 48  13.2  31.2 -2.8       0.0   178   F  1      0  15 16 13

15 19 30  DA193        03 19 48  14.9  30.0 -2.6       0.0   -32   1  1      0  15 19 30
15 21 00  ---          03 21 18  15.1  29.8 -2.6       0.0    58   F  1      0  15 19 43

15 21 00  J0605+4030   03 21 18  13.3  31.0 -2.7       0.0   -32   1  1      0  15 21 00
15 24 30  =0602+405    03 24 49  13.7  30.5 -2.7       0.0   178   F  1      0  15 21 13

15 24 30  DA193        03 24 49  15.5  29.2 -2.5       0.0   -32   1  1      0  15 24 30
15 26 00  ---          03 26 19  15.6  29.0 -2.5       0.0    58   F  1      0  15 24 43

15 28 00  J0605+4030   03 28 19  14.1  29.9 -2.6       0.0    89   1  1      0  15 28 00
15 31 30  =0602+405    03 31 50  14.5  29.4 -2.6       0.0   210   F  1      0  15 28 13

15 31 30  DA193        03 31 50  16.2  28.1 -2.4       0.0   -32   1  1      0  15 31 30
15 33 00  ---          03 33 20  16.4  27.8 -2.4       0.0    58   F  1      0  15 31 43

15 33 00  J0605+4030   03 33 20  14.7  29.1 -2.5       0.0   -32   1  1      0  15 33 00
15 36 30  =0602+405    03 36 51  15.1  28.5 -2.5       0.0   178   F  1      0  15 33 13

15 36 30  DA193        03 36 51  16.7  27.2 -2.3       0.0   -32   1  1      0  15 36 30
15 38 00  ---          03 38 21  16.9  27.0 -2.3       0.0    58   F  1      0  15 36 43

15 38 00  J0605+4030   03 38 21  15.2  28.3 -2.5       0.0   -32   1  1      0  15 38 00
15 41 30  =0602+405    03 41 52  15.6  27.7 -2.4       0.0   178   F  1      0  15 38 13

15 41 30  DA193        03 41 52  17.2  26.4 -2.2       0.0   -32   1  1      0  15 41 30
15 43 00  ---          03 43 22  17.4  26.1 -2.2       0.0    58   F  1      0  15 41 43

15 43 00  J0605+4030   03 43 22  15.8  27.5 -2.4       0.0   -32   1  1      0  15 43 00
15 46 30  =0602+405    03 46 52  16.1  26.9 -2.3       0.0   178   F  1      0  15 43 13

15 46 30  DA193        03 46 52  17.7  25.5 -2.2       0.0   -32   1  1      0  15 46 30
15 48 00  ---          03 48 23  17.9  25.2 -2.1       0.0    58   F  1      0  15 46 43

15 50 00  J0605+4030   03 50 23  16.5  26.3 -2.3       0.0    89   1  1      0  15 50 00
15 53 30  =0602+405    03 53 54  16.8  25.7 -2.2       0.0   210   F  1      0  15 50 13
Schedule for HART      (Code Hh )                                   Page   4
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed  22 Feb 2006   Day  53 ---

15 53 30  DA193        03 53 54  18.4  24.3 -2.0       0.0   -32   1  1      0  15 53 30
15 55 00  ---          03 55 24  18.5  24.0 -2.0       0.0    58   F  1      0  15 53 43

15 55 00  J0605+4030   03 55 24  17.0  25.5 -2.2       0.0   -32   1  1      0  15 55 00
15 58 30  =0602+405    03 58 54  17.3  24.8 -2.1       0.0   178   F  1      0  15 55 13

15 58 30  DA193        03 58 54  18.9  23.4 -2.0       0.0   -32   1  1      0  15 58 30
16 00 00  ---          04 00 25  19.0  23.1 -1.9       0.0    58   F  1      0  15 58 43

16 00 00  J0605+4030   04 00 25  17.4  24.6 -2.1       0.0   -32   1  1      0  16 00 00
16 03 30  =0602+405    04 03 55  17.8  24.0 -2.0       0.0   178   F  1      0  16 00 13

16 03 30  DA193        04 03 55  19.3  22.5 -1.9       0.0   -32   1  1      0  16 03 30
16 05 00  ---          04 05 26  19.4  22.2 -1.8       0.0    58   F  1      0  16 03 43

16 05 00  J0605+4030   04 05 26  17.9  23.7 -2.0       0.0   -32   1  1      0  16 05 00
16 08 30  =0602+405    04 08 56  18.2  23.1 -2.0       0.0   178   F  1      0  16 05 13

16 08 30  DA193        04 08 56  19.7  21.5 -1.8       0.0   -32   1  1      0  16 08 30
16 10 00  ---          04 10 26  19.8  21.3 -1.8       0.0    58   F  1      0  16 08 43

16 12 00  J0605+4030   04 12 27  18.5  22.5 -1.9       0.0    89   1  1      0  16 12 00
16 15 30  =0602+405    04 15 57  18.8  21.8 -1.8       0.0   210   F  1      0  16 12 13

16 15 30  DA193        04 15 57  20.3  20.2 -1.7       0.0   -32   1  1      0  16 15 30
16 17 00  ---          04 17 28  20.4  20.0 -1.6       0.0    58   F  1      0  16 15 43

16 17 00  J0605+4030   04 17 28  18.9  21.6 -1.8       0.0   -32   1  1      0  16 17 00
16 20 30  =0602+405    04 20 58  19.2  20.9 -1.8       0.0   178   F  1      0  16 17 13

16 20 30  DA193        04 20 58  20.7  19.3 -1.6       0.0   -32   1  1      0  16 20 30
16 22 00  ---          04 22 28  20.8  19.0 -1.6       0.0    58   F  1      0  16 20 43

16 22 00  J0605+4030   04 22 28  19.4  20.7 -1.7       0.0   -32   1  1      0  16 22 00
16 25 30  =0602+405    04 25 59  19.6  20.0 -1.7       0.0   178   F  1      0  16 22 13

16 25 30  DA193        04 25 59  21.0  18.3 -1.5       0.0   -32   1  1      0  16 25 30
16 27 00  ---          04 27 29  21.1  18.1 -1.5       0.0    58   F  1      0  16 25 43

16 27 00  J0605+4030   04 27 29  19.7  19.7 -1.6       0.0   -32   1  1      0  16 27 00
16 30 30  =0602+405    04 31 00  20.0  19.1 -1.6       0.0   178   F  1      0  16 27 13

16 30 30  DA193        04 31 00  21.4  17.4 -1.4       0.0   -32   1  1      0  16 30 30
16 32 00  ---          04 32 30  21.5  17.1 -1.4       0.0    58   F  1      0  16 30 43
Schedule for HART      (Code Hh )                                   Page   5
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed  22 Feb 2006   Day  53 ---

16 34 00  J0605+4030   04 34 30  20.3  18.4 -1.5       0.0    89   1  1      0  16 34 00
16 37 30  =0602+405    04 38 01  20.5  17.8 -1.5       0.0   210   F  1      0  16 34 13

16 37 30  DA193        04 38 01  21.8  16.0 -1.3       0.0   -32   1  1      0  16 37 30
16 39 00  ---          04 39 31  21.9  15.7 -1.3       0.0    58   F  1      0  16 37 43

16 39 00  J0605+4030   04 39 31  20.6  17.5 -1.4       0.0   -32   1  1      0  16 39 00
16 42 30  =0602+405    04 43 02  20.8  16.8 -1.4       0.0   178   F  1      0  16 39 13

16 42 30  DA193        04 43 02  22.1  15.0 -1.2       0.0   -32   1  1      0  16 42 30
16 44 00  ---          04 44 32  22.2  14.7 -1.2       0.0    58   F  1      0  16 42 43

16 44 00  J0605+4030   04 44 32  20.9  16.5 -1.4       0.0   -32   1  1      0  16 44 00
16 47 30  =0602+405    04 48 03  21.2  15.8 -1.3       0.0   178   F  1      0  16 44 13

16 47 30  DA193        04 48 03  22.4  14.0 -1.1       0.0   -32   1  1      0  16 47 30
16 49 00  ---          04 49 33  22.5  13.7 -1.1       0.0    58   F  1      0  16 47 43

16 49 00  J0605+4030   04 49 33  21.2  15.6 -1.3       0.0   -32   1  1      0  16 49 00
16 52 30  =0602+405    04 53 03  21.5  14.9 -1.2       0.0   178   F  1      0  16 49 13

16 52 30  DA193        04 53 03  22.7  13.0 -1.0       0.0   -32   1  1      0  16 52 30
16 54 00  ---          04 54 34  22.8  12.7 -1.0       0.0    58   F  1      0  16 52 43

16 56 00  J0605+4030   04 56 34  21.7  14.2 -1.2       0.0    89   1  1      0  16 56 00
16 59 30  =0602+405    05 00 04  21.8  13.5 -1.1       0.0   210   F  1      0  16 56 13

16 59 30  DA193        05 00 04  23.0  11.6 -0.9       0.0   -32   1  1      0  16 59 30
17 01 00  ---          05 01 35  23.1  11.3 -0.9       0.0    58   F  1      0  16 59 43

17 01 00  J0605+4030   05 01 35  21.9  13.2 -1.1       0.0   -32   1  1      0  17 01 00
17 04 30  =0602+405    05 05 05  22.1  12.5 -1.0       0.0   178   F  1      0  17 01 13

17 04 30  DA193        05 05 05  23.2  10.6 -0.8       0.0   -32   1  1      0  17 04 30
17 06 00  ---          05 06 36  23.3  10.3 -0.8       0.0    58   F  1      0  17 04 43

17 06 00  J0605+4030   05 06 36  22.2  12.2 -1.0       0.0   -32   1  1      0  17 06 00
17 09 30  =0602+405    05 10 06  22.3  11.5 -0.9       0.0   178   F  1      0  17 06 13

17 09 30  DA193        05 10 06  23.4   9.6 -0.8       0.0   -32   1  1      0  17 09 30
17 11 00  ---          05 11 36  23.5   9.3 -0.7       0.0    58   F  1      0  17 09 43

17 11 00  J0605+4030   05 11 36  22.4  11.2 -0.9       0.0   -32   1  1      0  17 11 00
17 14 30  =0602+405    05 15 07  22.5  10.5 -0.9       0.0   178   F  1      0  17 11 13
Schedule for HART      (Code Hh )                                   Page   6
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed  22 Feb 2006   Day  53 ---

17 14 30  DA193        05 15 07  23.6   8.5 -0.7       0.0   -32   1  1      0  17 14 30
17 16 00  ---          05 16 37  23.7   8.2 -0.7       0.0    58   F  1      0  17 14 43

17 18 00  J0605+4030   05 18 38  22.7   9.8 -0.8       0.0    89   1  1      0  17 18 00
17 21 30  =0602+405    05 22 08  22.8   9.1 -0.7       0.0   210   F  1      0  17 18 13

17 21 30  DA193        05 22 08  23.8   7.1 -0.6       0.0   -32   1  1      0  17 21 30
17 23 00  ---          05 23 38  23.9   6.8 -0.5       0.0    58   F  1      0  17 21 43

17 23 00  J0605+4030   05 23 38  22.9   8.8 -0.7       0.0   -32   1  1      0  17 23 00
17 26 30  =0602+405    05 27 09  23.0   8.1 -0.7       0.0   178   F  1      0  17 23 13

17 26 30  DA193        05 27 09  23.9   6.0 -0.5       0.0   -32   1  1      0  17 26 30
17 28 00  ---          05 28 39  24.0   5.7 -0.5       0.0    58   F  1      0  17 26 43

17 32 00  05358+35     05 32 40  28.3   1.6 -0.1       0.0   203   1  1      0  17 32 00
17 42 00  ---          05 42 41  28.3 359.3  0.1       0.0   600   F  1      0  17 32 13

 Next scan frequencies:  6028.00  6028.00  6028.00  6028.00  6032.00  6032.00
                         6032.00  6032.00  6036.00  6036.00  6036.00  6036.00
                         6040.00  6040.00  6040.00  6040.00
 Next BBC frequencies:    148.00   148.00   148.00   148.00   152.00   152.00
                          152.00   152.00   156.00   156.00   156.00   156.00
                          160.00   160.00   160.00   160.00

17 48 00  DA193        05 48 42  24.3   1.5 -0.1       0.0   325   1  1      0  17 48 00
17 58 00  ---          05 58 44  24.3 359.4  0.0       0.0   600   F  1      0  17 48 13


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: NME.5CM
   Matches group hh4.5cm_S2 in ./freq.dat
    Values confirmed by E-mail Jonathan Quick 291100 (CR)

   Setup group:    9         Station: HART              Total bit rate:  128
   Format: MKIV1:1           Bits per sample: 2         Sample rate:  4.000
   Number of channels: 16                               Speedup factor:   2.00

   Disk used to record data.

   1st LO=   6510.00   6510.00   6510.00   6510.00   6510.00   6510.00   6510.00   6510.00
             6510.00   6510.00   6510.00   6510.00   6510.00   6510.00   6510.00   6510.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         2         1         2         1         4         3         4         3
                   6         5         6         5         8         7         8         7
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        2N        1N        2N        1N        2N        1N        2N        1N
                  2N        1N        2N        1N        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:   9  Setup file default.  No pcal detection.
   LO sum=    6665.00   6665.00   6665.00   6665.00   6669.00   6669.00   6669.00   6669.00
              6673.00   6673.00   6673.00   6673.00   6677.00   6677.00   6677.00   6677.00
   BBC fr=     155.00    155.00    155.00    155.00    159.00    159.00    159.00    159.00
               163.00    163.00    163.00    163.00    167.00    167.00    167.00    167.00
   Bandwd=      2.000     2.000     2.000     2.000     2.000     2.000     2.000     2.000
                2.000     2.000     2.000     2.000     2.000     2.000     2.000     2.000

   Track assignments are: 
    track1=   2,  6, 10, 14, 18, 22, 26, 30,  3,  7, 11, 15, 19, 23, 27, 31
    barrel=roll_off 


 Setup file: NME.5CMOH
   Matches group hh5cm_S2 in ./freq.dat
    Values confirmed by E-mail Jonathan Quick 291100 (CR)

   Setup group:   18         Station: HART              Total bit rate:  128
   Format: MKIV1:1           Bits per sample: 2         Sample rate:  4.000
   Number of channels: 16                               Speedup factor:   2.00

   Disk used to record data.

   1st LO=   5880.00   5880.00   5880.00   5880.00   5880.00   5880.00   5880.00   5880.00
             5880.00   5880.00   5880.00   5880.00   5880.00   5880.00   5880.00   5880.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         2         1         2         1         4         3         4         3
                   6         5         6         5         8         7         8         7
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        2N        1N        2N        1N        2N        1N        2N        1N
                  2N        1N        2N        1N        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:  18  Setup file default.  No pcal detection.
   LO sum=    6028.00   6028.00   6028.00   6028.00   6032.00   6032.00   6032.00   6032.00
              6036.00   6036.00   6036.00   6036.00   6040.00   6040.00   6040.00   6040.00
   BBC fr=     148.00    148.00    148.00    148.00    152.00    152.00    152.00    152.00
               156.00    156.00    156.00    156.00    160.00    160.00    160.00    160.00
   Bandwd=      2.000     2.000     2.000     2.000     2.000     2.000     2.000     2.000
                2.000     2.000     2.000     2.000     2.000     2.000     2.000     2.000

   Track assignments are: 
    track1=   2,  6, 10, 14, 18, 22, 26, 30,  3,  7, 11, 15, 19, 23, 27, 31
    barrel=roll_off 
 SOURCE LIST -- Network Monitoring Expt
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * 05358+35          05 35 51.453693   * 05 39 13.058000     05 39 38.378621       0.00
                     35 44 13.27115    * 35 45 51.30000      35 46 15.96138        0.00
                     From catalog imbedded in main SCHED input file.
                     maser target position
                        0.167 scan hours,      6.000 baseline hours above horizon.

   J0237+2848        02 34 55.589591   * 02 37 52.405678     02 38 13.311410       0.23
 * 0234+285          28 35 11.40780    * 28 48 08.99005      28 49 51.91549        0.40
   J0237+28          /aps3/sched/catalogs/sources.vlba
                     VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.333 scan hours,     11.983 baseline hours above horizon.

   J0319+4130        03 16 29.567289   * 03 19 48.160119     03 20 11.875200       0.28
   0316+413          41 19 51.91675    * 41 30 42.10387      41 32 15.28060        0.41
 * 3C84              /aps3/sched/catalogs/sources.vlba
   J0319+41          VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.333 scan hours,     12.000 baseline hours above horizon.

   J0555+3948        05 52 01.407172   * 05 55 30.805614     05 55 57.250528       0.26
   0552+398          39 48 21.94585    * 39 48 49.16500      39 49 06.05937        0.40
 * DA193             /aps3/sched/catalogs/sources.vlba
   J0555+39          VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.917 scan hours,     25.427 baseline hours above horizon.

 * J0605+4030        06 02 20.058847   * 06 05 50.855367     06 06 17.565762       0.28
   0602+405          40 30 26.00792    * 40 30 08.10359      40 30 19.39405        0.42
                     /aps3/sched/catalogs/sources.vlba
                     VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        1.633 scan hours,     53.147 baseline hours above horizon.



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   05358+35           111.3
   0234+285            72.7
   3C84                85.2
   DA193              114.2
   J0605+4030         116.1

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

