  COVER INFORMATION 

 Station:    SHANGHAI  (Code Sh ) 
 Experiment: Arp 299-A at 1 Gb/s
 Exp. Code:  EP087A  


Schedule Version:       2.00
Processed by SCHED version:  10.20  Release of about July 12, 2012

PI:       Miguel A. Perez-Torres

Address:  IAA - CSIC
          Glorieta de la Astronomia s/n
          18008 Granada, Spain
 

Phone:    +34-958230644
EMAIL:    torres@iaa.es
Fax:      +34-958814530
Phone during observation: +34-665252538

Observing mode: 1024 Mbps

Notes:    Phase-ref of Arp 299 with the full EVN
          Tenth epoch obs-ns at 6cm; sixth with full EVN
 
 

Schedule for SHANGHAI  (Code Sh )                                   Page   2
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon  25 Feb 2013   Day  56 ---

 Next scan frequencies:  4942.49  4942.49  4942.49  4942.49  4974.49  4974.49  4974.49  4974.49
                         5006.49  5006.49  5006.49  5006.49  5038.49  5038.49  5038.49  5038.49
 Next BBC frequencies:    742.49   742.49   742.49   742.49   774.49   774.49   774.49   774.49
                          806.49   806.49   806.49   806.49   838.49   838.49   838.49   838.49
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00

21 30 00  4C39.25      15 58 24  13.7 -52.5  6.5      60.9     0        0   21 30 00
21 33 00  ---          16 01 25  13.2 -52.2  6.6      60.5   180       23   21 30 01

21 33 00  4C39.25      16 01 25  13.2 -52.2  6.6      60.5    -2       23   No stop 
21 35 00  ---          16 03 25  12.8 -52.0  6.6      60.2   118       39   21 33 01

21 43 00  J1128+5925   16 11 26  36.1 -36.5  4.7      88.7   436       39   21 43 00
21 43 30  ---          16 11 56  36.0 -36.5  4.7      88.6    30       43   21 43 01

21 43 30  ARP299       16 11 56  36.1 -37.6  4.7      88.0    -5       43   No stop 
21 47 20  ---          16 15 47  35.6 -37.6  4.8      87.2   225       72   21 43 31

21 47 20  J1128+5925   16 15 47  35.6 -36.5  4.8      87.7    -5       72   No stop 
21 48 20  ---          16 16 47  35.4 -36.5  4.8      87.5    55       80   21 47 21

21 48 20  ARP299       16 16 47  35.4 -37.6  4.8      87.0    -5       80   No stop 
21 52 20  ---          16 20 48  34.9 -37.5  4.9      86.2   235      111   21 48 21

21 53 00  J1128+5925   16 21 28  34.8 -36.5  4.9      86.5    35      111   21 53 00
21 53 30  ---          16 21 58  34.8 -36.5  4.9      86.4    30      115   21 53 01

21 53 30  ARP299       16 21 58  34.8 -37.5  4.9      85.9    -5      115   No stop 
21 57 30  ---          16 25 59  34.2 -37.5  4.9      85.1   235      146   21 53 31

21 57 30  J1128+5925   16 25 59  34.3 -36.4  4.9      85.6    -5      146   No stop 
21 58 30  ---          16 26 59  34.1 -36.4  5.0      85.4    55      154   21 57 31

21 58 30  ARP299       16 26 59  34.1 -37.4  5.0      84.9    -5      154   No stop 
22 02 30  ---          16 30 59  33.6 -37.4  5.0      84.1   235      185   21 58 31

22 02 30  J1128+5925   16 30 59  33.6 -36.4  5.0      84.6    -5      185   No stop 
22 03 30  ---          16 32 00  33.5 -36.3  5.0      84.4    55      192   22 02 31

22 03 30  ARP299       16 32 00  33.4 -37.4  5.0      83.9    -5      192   No stop 
22 07 30  ---          16 36 00  32.9 -37.3  5.1      83.0   235      223   22 03 31

22 08 10  J1128+5925   16 36 40  32.9 -36.3  5.1      83.4    35      223   22 08 10
22 08 40  ---          16 37 10  32.8 -36.3  5.1      83.3    30      227   22 08 11
Schedule for SHANGHAI  (Code Sh )                                   Page   3
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon  25 Feb 2013   Day  56 ---

22 08 40  ARP299       16 37 10  32.8 -37.3  5.1      82.8    -5      227   No stop 
22 12 40  ---          16 41 11  32.3 -37.2  5.2      82.0   235      258   22 08 41

22 12 40  J1128+5925   16 41 11  32.3 -36.2  5.2      82.5    -5      258   No stop 
22 13 40  ---          16 42 11  32.2 -36.2  5.2      82.3    55      266   22 12 41

22 13 40  ARP299       16 42 11  32.1 -37.2  5.2      81.8    -5      266   No stop 
22 17 40  ---          16 46 12  31.6 -37.1  5.3      81.0   235      297   22 13 41

22 17 40  J1128+5925   16 46 12  31.7 -36.1  5.3      81.4    -5      297   No stop 
22 18 40  ---          16 47 12  31.6 -36.1  5.3      81.2    55      304   22 17 41

22 18 40  ARP299       16 47 12  31.5 -37.1  5.3      80.8    -5      304   No stop 
22 22 40  ---          16 51 13  31.0 -37.0  5.4      80.0   235      335   22 18 41

22 23 20  J1128+5925   16 51 53  31.0 -35.9  5.4      80.3    35      335   22 23 20
22 23 50  ---          16 52 23  30.9 -35.9  5.4      80.2    30      339   22 23 21

22 23 50  ARP299       16 52 23  30.8 -36.9  5.4      79.8    -5      339   No stop 
22 27 50  ---          16 56 24  30.3 -36.8  5.5      79.0   235      370   22 23 51

22 27 50  J1128+5925   16 56 24  30.4 -35.8  5.5      79.4    -5      370   No stop 
22 28 50  ---          16 57 24  30.3 -35.8  5.5      79.2    55      378   22 27 51

22 28 50  ARP299       16 57 24  30.2 -36.8  5.5      78.8    -5      378   No stop 
22 32 50  ---          17 01 24  29.7 -36.7  5.5      78.0   235      409   22 28 51

22 32 50  J1128+5925   17 01 24  29.8 -35.7  5.5      78.4    -5      409   No stop 
22 33 50  ---          17 02 25  29.7 -35.6  5.6      78.2    55      417   22 32 51

22 33 50  ARP299       17 02 25  29.5 -36.6  5.6      77.8    -5      417   No stop 
22 37 50  ---          17 06 25  29.0 -36.5  5.6      77.0   235      448   22 33 51

22 38 30  J1128+5925   17 07 05  29.1 -35.5  5.6      77.2    35      448   22 38 30
22 39 00  ---          17 07 35  29.0 -35.5  5.6      77.1    30      452   22 38 31

22 39 00  ARP299       17 07 35  28.9 -36.5  5.6      76.7    -5      452   No stop 
22 43 00  ---          17 11 36  28.4 -36.3  5.7      76.0   235      483   22 39 01

22 43 00  J1128+5925   17 11 36  28.5 -35.4  5.7      76.3    -5      483   No stop 
22 44 00  ---          17 12 36  28.4 -35.3  5.7      76.1    55      490   22 43 01

22 44 00  ARP299       17 12 36  28.2 -36.3  5.7      75.8    -5      490   No stop 
22 48 00  ---          17 16 37  27.7 -36.1  5.8      75.0   235      521   22 44 01
Schedule for SHANGHAI  (Code Sh )                                   Page   4
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon  25 Feb 2013   Day  56 ---

22 48 00  J1128+5925   17 16 37  27.9 -35.2  5.8      75.3    -5      521   No stop 
22 49 00  ---          17 17 37  27.8 -35.1  5.8      75.1    55      529   22 48 01

22 49 00  ARP299       17 17 37  27.6 -36.1  5.8      74.8    -5      529   No stop 
22 53 00  ---          17 21 38  27.1 -35.9  5.9      74.0   235      560   22 49 01

22 53 40  J1128+5925   17 22 18  27.2 -35.0  5.9      74.2    35      560   22 53 40
22 54 10  ---          17 22 48  27.1 -34.9  5.9      74.1    30      564   22 53 41

22 54 10  ARP299       17 22 48  26.9 -35.9  5.9      73.8    -5      564   No stop 
22 58 10  ---          17 26 49  26.4 -35.7  6.0      73.0   235      595   22 54 11

22 58 10  J1128+5925   17 26 49  26.6 -34.8  6.0      73.3    -5      595   No stop 
22 59 10  ---          17 27 49  26.5 -34.7  6.0      73.1    55      603   22 58 11

22 59 10  ARP299       17 27 49  26.3 -35.7  6.0      72.8    -5      603   No stop 
23 03 10  ---          17 31 49  25.8 -35.5  6.0      72.0   235      634   22 59 11

23 03 10  J1128+5925   17 31 49  26.0 -34.6  6.0      72.4    -5      634   No stop 
23 04 10  ---          17 32 50  25.9 -34.5  6.1      72.2    55      641   23 03 11

23 04 10  ARP299       17 32 50  25.7 -35.4  6.1      71.8    -5      641   No stop 
23 08 10  ---          17 36 50  25.2 -35.3  6.1      71.0   235      672   23 04 11

23 08 50  J1128+5925   17 37 30  25.4 -34.3  6.1      71.2    35      672   23 08 50
23 09 20  ---          17 38 00  25.3 -34.3  6.1      71.1    30      676   23 08 51

23 09 20  ARP299       17 38 00  25.1 -35.2  6.1      70.8    -5      676   No stop 
23 13 20  ---          17 42 01  24.6 -35.0  6.2      70.1   235      707   23 09 21

23 13 20  J1128+5925   17 42 01  24.8 -34.1  6.2      70.4    -5      707   No stop 
23 14 20  ---          17 43 01  24.7 -34.1  6.2      70.2    55      715   23 13 21

23 14 20  ARP299       17 43 01  24.4 -35.0  6.2      69.9    -5      715   No stop 
23 18 20  ---          17 47 02  23.9 -34.8  6.3      69.1   235      746   23 14 21

23 18 20  J1128+5925   17 47 02  24.2 -33.9  6.3      69.4    -5      746   No stop 
23 19 20  ---          17 48 02  24.1 -33.8  6.3      69.2    55      754   23 18 21

23 19 20  ARP299       17 48 02  23.8 -34.7  6.3      68.9    -5      754   No stop 
23 23 20  ---          17 52 03  23.3 -34.5  6.4      68.1   235      784   23 19 21

23 24 00  J1128+5925   17 52 43  23.5 -33.6  6.4      68.3    35      784   23 24 00
23 24 30  ---          17 53 13  23.5 -33.6  6.4      68.2    30      788   23 24 01
Schedule for SHANGHAI  (Code Sh )                                   Page   5
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon  25 Feb 2013   Day  56 ---

23 24 30  ARP299       17 53 13  23.2 -34.4  6.4      67.9    -5      788   No stop 
23 28 30  ---          17 57 14  22.7 -34.2  6.5      67.1   235      819   23 24 31

23 28 30  J1128+5925   17 57 14  23.0 -33.3  6.5      67.4    -5      819   No stop 
23 29 30  ---          17 58 14  22.9 -33.3  6.5      67.2    55      827   23 28 31

23 29 30  ARP299       17 58 14  22.6 -34.2  6.5      66.9    -5      827   No stop 
23 33 30  ---          18 02 14  22.1 -33.9  6.5      66.2   235      858   23 29 31

23 33 30  J1128+5925   18 02 14  22.4 -33.1  6.6      66.4    -5      858   No stop 
23 34 30  ---          18 03 15  22.3 -33.0  6.6      66.2    55      866   23 33 31

23 34 30  ARP299       18 03 15  22.0 -33.9  6.6      66.0    -5      866   No stop 
23 38 30  ---          18 07 15  21.5 -33.7  6.6      65.2   235      897   23 34 31

23 39 10  J1128+5925   18 07 55  21.8 -32.8  6.6      65.3    35      897   23 39 10
23 39 40  ---          18 08 25  21.7 -32.7  6.7      65.2    30      901   23 39 11

23 39 40  ARP299       18 08 25  21.4 -33.6  6.7      65.0    -5      901   No stop 
23 43 40  ---          18 12 26  20.9 -33.3  6.7      64.2   235      932   23 39 41

23 43 40  J1128+5925   18 12 26  21.2 -32.5  6.7      64.4    -5      932   No stop 
23 44 40  ---          18 13 26  21.1 -32.4  6.7      64.3    55      939   23 43 41

23 44 40  ARP299       18 13 26  20.8 -33.3  6.7      64.0    -5      939   No stop 
23 48 40  ---          18 17 27  20.3 -33.0  6.8      63.3   235      970   23 44 41

23 48 40  J1128+5925   18 17 27  20.7 -32.2  6.8      63.5    -5      970   No stop 
23 49 40  ---          18 18 27  20.5 -32.1  6.8      63.3    55      978   23 48 41

23 49 40  ARP299       18 18 27  20.2 -33.0  6.8      63.1    -5      978   No stop 
23 53 40  ---          18 22 28  19.7 -32.7  6.9      62.3   235     1009   23 49 41

23 54 20  J1128+5925   18 23 08  20.0 -31.8  6.9      62.4    35     1009   23 54 20
23 54 50  ---          18 23 38  20.0 -31.8  6.9      62.3    30     1013   23 54 21

23 54 50  ARP299       18 23 38  19.6 -32.6  6.9      62.1    -5     1013   No stop 
23 58 50  ---          18 27 39  19.1 -32.4  7.0      61.3   235     1044   23 54 51

23 58 50  J1128+5925   18 27 39  19.5 -31.6  7.0      61.5    -5     1044   No stop 
23 59 50  ---          18 28 39  19.4 -31.5  7.0      61.3    55     1052   23 58 51
Schedule for SHANGHAI  (Code Sh )                                   Page   6
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Start: Mon  25 Feb 2013   Day  56 -- Stop: Tue  26 Feb 2013   Day  57 ---

23 59 50  ARP299       18 28 39  19.0 -32.3  7.0      61.1    -5     1052   No stop 
00 03 50  ---          18 32 39  18.6 -32.0  7.1      60.3   235     1083   23 59 51

00 03 50  J1128+5925   18 32 39  18.9 -31.2  7.1      60.5    -5     1083   No stop 
00 04 50  ---          18 33 40  18.8 -31.2  7.1      60.3    55     1090   00 03 51

00 04 50  ARP299       18 33 40  18.4 -32.0  7.1      60.2    -5     1090   No stop 
00 08 50  ---          18 37 40  18.0 -31.7  7.1      59.4   235     1121   00 04 51

00 09 30  J1128+5925   18 38 20  18.3 -30.8  7.2      59.4    35     1121   00 09 30
00 10 00  ---          18 38 50  18.3 -30.8  7.2      59.3    30     1125   00 09 31

00 10 00  ARP299       18 38 50  17.9 -31.6  7.2      59.2    -5     1125   No stop 
00 14 00  ---          18 42 51  17.4 -31.3  7.2      58.4   235     1156   00 10 01

00 14 00  J1128+5925   18 42 51  17.8 -30.5  7.2      58.6    -5     1156   No stop 
00 15 00  ---          18 43 51  17.7 -30.5  7.2      58.4    55     1164   00 14 01

00 15 00  ARP299       18 43 51  17.3 -31.3  7.2      58.2    -5     1164   No stop 
00 19 00  ---          18 47 52  16.9 -31.0  7.3      57.4   235     1195   00 15 01

00 19 00  J1128+5925   18 47 52  17.3 -30.2  7.3      57.6    -5     1195   No stop 
00 20 00  ---          18 48 52  17.2 -30.1  7.3      57.4    55     1203   00 19 01

00 20 00  ARP299       18 48 52  16.7 -30.9  7.3      57.2    -4     1203   No stop 
00 24 00  ---          18 52 53  16.3 -30.6  7.4      56.5   236     1233   00 20 01

00 24 40  J1128+5925   18 53 33  16.7 -29.8  7.4      56.5    36     1233   00 24 40
00 25 10  ---          18 54 03  16.6 -29.7  7.4      56.4    30     1237   00 24 41

00 25 10  ARP299       18 54 03  16.2 -30.5  7.4      56.2    -5     1237   No stop 
00 29 10  ---          18 58 04  15.7 -30.2  7.5      55.5   235     1268   00 25 11

00 29 10  J1128+5925   18 58 04  16.2 -29.4  7.5      55.6    -5     1268   No stop 
00 30 10  ---          18 59 04  16.1 -29.4  7.5      55.4    55     1276   00 29 11

00 30 10  ARP299       18 59 04  15.6 -30.1  7.5      55.3    -5     1276   No stop 
00 34 10  ---          19 03 04  15.2 -29.8  7.6      54.5   235     1307   00 30 11

00 34 10  J1128+5925   19 03 04  15.7 -29.1  7.6      54.6    -5     1307   No stop 
00 35 10  ---          19 04 05  15.6 -29.0  7.6      54.4    55     1315   00 34 11

00 35 10  ARP299       19 04 05  15.1 -29.7  7.6      54.3    -5     1315   No stop 
00 39 10  ---          19 08 05  14.7 -29.4  7.6      53.5   235     1346   00 35 11
Schedule for SHANGHAI  (Code Sh )                                   Page   7
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  26 Feb 2013   Day  57 ---

00 39 50  J1128+5925   19 08 45  15.1 -28.6  7.7      53.5    35     1346   00 39 50
00 40 20  ---          19 09 15  15.0 -28.6  7.7      53.4    30     1350   00 39 51

00 40 20  ARP299       19 09 15  14.6 -29.3  7.7      53.3    -5     1350   No stop 
00 44 20  ---          19 13 16  14.1 -29.0  7.7      52.5   235     1381   00 40 21

00 44 20  J1128+5925   19 13 16  14.6 -28.3  7.7      52.7    -5     1381   No stop 
00 45 20  ---          19 14 16  14.5 -28.2  7.8      52.5    55     1388   00 44 21

00 45 20  ARP299       19 14 16  14.0 -28.9  7.7      52.3    -5     1388   No stop 
00 49 20  ---          19 18 17  13.6 -28.6  7.8      51.6   235     1419   00 45 21

00 49 20  J1128+5925   19 18 17  14.1 -27.8  7.8      51.7    -5     1419   No stop 
00 50 20  ---          19 19 17  14.0 -27.8  7.8      51.5    55     1427   00 49 21

00 50 20  ARP299       19 19 17  13.5 -28.5  7.8      51.4    -5     1427   No stop 
00 54 20  ---          19 23 18  13.1 -28.1  7.9      50.6   235     1458   00 50 21

00 55 00  J1128+5925   19 23 58  13.6 -27.4  7.9      50.6    35     1458   00 55 00
00 55 30  ---          19 24 28  13.5 -27.3  7.9      50.5    30     1462   00 55 01

00 55 30  ARP299       19 24 28  13.0 -28.0  7.9      50.4    -5     1462   No stop 
00 59 30  ---          19 28 29  12.6 -27.7  8.0      49.6   235     1493   00 55 31

00 59 30  J1128+5925   19 28 29  13.1 -27.0  8.0      49.7    -5     1493   No stop 
01 00 30  ---          19 29 29  13.0 -26.9  8.0      49.5    55     1501   00 59 31

01 00 30  ARP299       19 29 29  12.5 -27.6  8.0      49.4    -5     1501   No stop 
01 04 30  ---          19 33 29  12.1 -27.3  8.1      48.6   235     1532   01 00 31

01 04 30  J1128+5925   19 33 29  12.6 -26.6  8.1      48.7    -5     1532   No stop 
01 05 30  ---          19 34 29  12.5 -26.5  8.1      48.5    55     1539   01 04 31

01 05 30  ARP299       19 34 29  12.0 -27.2  8.1      48.4    -5     1539   No stop 
01 09 30  ---          19 38 30  11.6 -26.8  8.2      47.6   235     1570   01 05 31

01 10 10  J1128+5925   19 39 10  12.1 -26.1  8.2      47.6    35     1570   01 10 10
01 10 40  ---          19 39 40  12.0 -26.0  8.2      47.5    30     1574   01 10 11

01 10 40  ARP299       19 39 40  11.5 -26.7  8.2      47.4    -5     1574   No stop 
01 14 40  ---          19 43 41  11.1 -26.3  8.2      46.6   235     1605   01 10 41

01 14 40  J1128+5925   19 43 41  11.7 -25.7  8.2      46.7    -5     1605   No stop 
01 15 40  ---          19 44 41  11.6 -25.6  8.3      46.5    55     1613   01 14 41
Schedule for SHANGHAI  (Code Sh )                                   Page   8
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  26 Feb 2013   Day  57 ---

01 15 40  ARP299       19 44 41  11.0 -26.3  8.3      46.4    -5     1613   No stop 
01 19 40  ---          19 48 42  10.6 -25.9  8.3      45.7   235     1644   01 15 41

01 19 40  J1128+5925   19 48 42  11.2 -25.2  8.3      45.7    -5     1644   No stop 
01 20 40  ---          19 49 42  11.1 -25.1  8.3      45.5    55     1652   01 19 41

01 20 40  ARP299       19 49 42  10.5 -25.8  8.3      45.5    -5     1652   No stop 
01 24 40  ---          19 53 43  10.2 -25.4  8.4      44.7   235     1682   01 20 41

01 25 20  J1128+5925   19 54 23  10.7 -24.7  8.4      44.6    35     1682   01 25 20
01 25 50  ---          19 54 53  10.7 -24.7  8.4      44.5    30     1686   01 25 21

01 25 50  ARP299       19 54 53  10.1 -25.3  8.4      44.4    -5     1686   No stop 
01 29 50  ---          19 58 53   9.7 -24.9  8.5      43.6   235     1717   01 25 51

01 29 50  J1128+5925   19 58 53  10.3 -24.3  8.5      43.7    -5     1717   No stop 
01 30 50  ---          19 59 54  10.2 -24.2  8.5      43.5    55     1725   01 29 51

01 30 50  ARP299       19 59 54   9.6 -24.8  8.5      43.5    -5     1725   No stop 
01 34 50  ---          20 03 54   9.3 -24.4  8.6      42.7   235     1756   01 30 51

01 34 50  J1128+5925   20 03 54   9.9 -23.8  8.6      42.7    -5     1756   No stop 
01 35 50  ---          20 04 54   9.8 -23.7  8.6      42.5    55     1764   01 34 51

01 35 50  ARP299       20 04 54   9.2 -24.3  8.6      42.5    -5     1764   No stop 
01 39 50  ---          20 08 55   8.8 -23.9  8.7      41.7   235     1795   01 35 51

01 40 30  J1128+5925   20 09 35   9.4 -23.3  8.7      41.6    35     1795   01 40 30
01 41 00  ---          20 10 05   9.3 -23.2  8.7      41.5    30     1799   01 40 31

01 41 00  ARP299       20 10 05   8.7 -23.8  8.7      41.4    -5     1799   No stop 
01 45 00  ---          20 14 06   8.4 -23.4  8.7      40.6   235     1830   01 41 01

01 45 00  J1128+5925   20 14 06   9.0 -22.8  8.8      40.7    -5     1830   No stop 
01 46 00  ---          20 15 06   8.9 -22.7  8.8      40.5    55     1837   01 45 01

01 46 00  ARP299       20 15 06   8.3 -23.3  8.8      40.4    -5     1837   No stop 
01 50 00  ---          20 19 07   7.9 -22.9  8.8      39.6   235     1868   01 46 01

01 50 00  J1128+5925   20 19 07   8.6 -22.3  8.8      39.7    -5     1868   No stop 
01 51 00  ---          20 20 07   8.5 -22.2  8.9      39.5    55     1876   01 50 01

01 51 00  ARP299       20 20 07   7.9 -22.8  8.8      39.4    -5     1876   No stop 
01 55 00  ---          20 24 08   7.5 -22.4  8.9      38.6   235     1907   01 51 01
Schedule for SHANGHAI  (Code Sh )                                   Page   9
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  26 Feb 2013   Day  57 ---

01 55 40  J1128+5925   20 24 48   8.1 -21.8  8.9      38.5    35     1907   01 55 40
01 56 10  ---          20 25 18   8.1 -21.7  8.9      38.4    30     1911   01 55 41

01 56 10  ARP299       20 25 18   7.4 -22.3  8.9      38.4    -5     1911   No stop 
02 00 10  ---          20 29 18   7.1 -21.9  9.0      37.6   235     1942   01 56 11

02 00 10  J1128+5925   20 29 18   7.8 -21.3  9.0      37.6    -5     1942   No stop 
02 01 10  ---          20 30 19   7.7 -21.2  9.0      37.4    55     1950   02 00 11

02 01 10  ARP299       20 30 19   7.0 -21.8  9.0      37.4    -5     1950   No stop 
02 05 10  ---          20 34 19   6.7 -21.3  9.1      36.6   235     1981   02 01 11

02 05 10  J1128+5925   20 34 19   7.4 -20.8  9.1      36.6    -5     1981   No stop 
02 06 10  ---          20 35 19   7.3 -20.7  9.1      36.4    55     1988   02 05 11

02 06 10  ARP299       20 35 19   6.6 -21.2  9.1      36.4    -5     1988   No stop 
02 10 10  ---          20 39 20   6.3 -20.8  9.2      35.6   235     2019   02 06 11

02 10 50  J1128+5925   20 40 00   7.0 -20.2  9.2      35.5    35     2019   02 10 50
02 11 20  ---          20 40 30   6.9 -20.2  9.2      35.4    30     2023   02 10 51

02 11 20  ARP299       20 40 30   6.2 -20.7  9.2      35.4    -5     2023   No stop 
02 15 20  ---          20 44 31   5.9 -20.3  9.3      34.6   235     2054   02 11 21

02 15 20  J1128+5925   20 44 31   6.6 -19.7  9.3      34.5    -5     2054   No stop 
02 16 20  ---          20 45 31   6.6 -19.6  9.3      34.3    55     2062   02 15 21

02 16 20  ARP299       20 45 31   5.9 -20.1  9.3      34.3    -5     2062   No stop 
02 20 20  ---          20 49 32   5.6 -19.7  9.3      33.5   235     2093   02 16 21

02 20 20  J1128+5925   20 49 32   6.3 -19.2  9.3      33.5    -5     2093   No stop 
02 21 20  ---          20 50 32   6.2 -19.1  9.4      33.3    55     2101   02 20 21

02 21 20  ARP299       20 50 32   5.5 -19.6  9.4      33.3    -5     2101   No stop 
02 25 20  ---          20 54 33   5.2 -19.2  9.4      32.5   235     2131   02 21 21

02 26 00  J1128+5925   20 55 13   5.9 -18.6  9.4      32.4    35     2131   02 26 00
02 26 30  ---          20 55 43   5.8 -18.5  9.4      32.3    30     2135   02 26 01

02 26 30  ARP299       20 55 43   5.1 -19.0  9.4      32.3    -5     2135   No stop 
02 30 30  ---          20 59 43   4.9 -18.6  9.5  D   31.5     0     2166   02 26 31

02 30 30  J1128+5925   20 59 43   5.6 -18.1  9.5      31.4    -5     2166   No stop 
02 31 30  ---          21 00 44   5.5 -18.0  9.5      31.2    55     2174   02 30 31
Schedule for SHANGHAI  (Code Sh )                                   Page  10
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  26 Feb 2013   Day  57 ---

02 35 30  J1128+5925   21 04 44   5.2 -17.5  9.6      30.4   238     2174   02 35 30
02 36 30  ---          21 05 44   5.2 -17.4  9.6      30.2    60     2182   02 35 31


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 ======== Setup file: sess113.C1024
   Matching groups in /Users/torres/sched102/catalogs/freq.dat:
     sh6cm           Update freq. range AnTao 22Mar08

   Setup group:   10         Station: SHANGHAI          Total bit rate: 1024
   Format: MARK5B            Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type:                  Speedup factor:   1.00

   Disk used to record data.

   1st LO=   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00
             4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         1         2         1         2         3         4         3         4
                   5         6         5         6         7         8         7         8
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        C         A         C         A         C         A         C         A 
                  C         A         C         A         C         A         C         A 

  The following frequency sets based on these setups were used.

   Frequency Set:  13  Setup file default.  Used pcal sets:   1
   LO sum=   4942.49  4942.49  4942.49  4942.49  4974.49  4974.49  4974.49  4974.49
             5006.49  5006.49  5006.49  5006.49  5038.49  5038.49  5038.49  5038.49
   BBC fr=    742.49   742.49   742.49   742.49   774.49   774.49   774.49   774.49
              806.49   806.49   806.49   806.49   838.49   838.49   838.49   838.49
   Bandwd=     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
               16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
    Matching frequency sets:  13

  The following pulse cal sets were used with this setup:

   Pulse cal detection set:   1  PCAL = 1MHZ
    PCALXB1=   S1    S3    S5    S7    S9    S11   S13   S15
    PCALXB2=   S2    S4    S6    S8    S10   S12   S14   S16
    PCALFR1=   490   510   490   510   490   510   490   510
    PCALFR2=   490   510   490   510   490   510   490   510

   Track assignments are: 
    track1=   2,  4,  6,  8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30, 32
    barrel=roll_off 
 SOURCES USED IN RECORDING SCANS --                         Arp 299-A at 1 Gb/s
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * ARP299            11 25 44.174219   * 11 28 33.622010     11 29 20.699598       0.00
                     58 50 18.17319    * 58 33 46.61000      58 29 10.02614        0.00
                     From catalog imbedded in main SCHED input file.
                        4.561 scan and    295.133 baseline hours in setup: sess113.C1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7  8  9 10 13

 * J1128+5925        11 25 23.181652   * 11 28 13.340676     11 29 00.639422       0.00
                     59 41 46.14397    * 59 25 14.79866      59 20 38.33606        0.00
                     From catalog imbedded in main SCHED input file.
                        0.967 scan and     46.734 baseline hours in setup: sess113.C1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7  8  9 10 13

   J0927+3902        09 23 55.319217   * 09 27 03.013938     09 27 54.727649       0.13
   0923+392          39 15 23.56637    * 39 02 20.85177      38 58 42.43640        0.10
 * 4C39.25           /Users/torres/sched102/catalogs/sources.vlba
   J0927+39          rfc_2012b Petrov, 2012, unpublished 239566 observations
                        0.083 scan and      6.334 baseline hours in setup: sess113.C1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7  8  9 10 13



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   ARP299             129.2
   J1128+5925         128.4
   4C39.25            146.0

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

