  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: Network Monitoring Expt
 Exp. Code:  N08M2   


Schedule Version:       2.00                                              
Processed by SCHED version:   6.05  June 2006                             

PI:       Antonis Polatidis                                               

Address:  JIVE                                                            
          Postbus 2                                                       
          7990 AA Dwingeloo                                               
          The Netherlands                                                 

Phone:    +31-521-596517                                                  
EMAIL:    polatidis@jive.nl                                               
Fax:                                                                      
Phone during observation: +31-521-596517                                  

Observing mode:                                                           

Notes:    5cm NME (256 Mbps standard OH and 128Mbps test for GB064) for se
          Please send the disk pack to JIVE                               
          Use two modes 128Mbps 2 16MHz BBCs a la GB046 and 256Mbps       
          standard excited OH. Changeover happens aroun d 1508 UT         


COVER LETTER:


This is the 5cm NME-FTP experiment for Session 2 2008

The experiment is scheduled at 256Mbps, but since this session
has the first use of a non-standard, higher frequency in the GB064
experiments, the first part of the NME follows the setup of GB064.

Hence from the first 2 hours, the setup is two 16MHz BBCs (lower sideband)
one polarization each. The BBCs are centered at 6116.1 MHz.

For the remaining time, an NME "standard" excited OH setup is observed
at 256Mb/s (eight 4 MHz BBCs, each upper and low sideband).

Due to the different frequency, a separate FREQ.DAT file was used
(n08m2freq.dat). PLEASE NOTE that this is NOT the same as gb064freq.dat.

In order to minimize complications with the MarkIV stations' patching,
I have altered the LOs of Jb2, On, Wb and Hh, so that both setups go
to LOW patching.

Please check again if the suggested LO values are OK with your stations.

This is NOT the case in GB064. There the BBCs come at HIGH patching in
Jb2, On, Wb and Hh, while all other experiment (N08M2, EV017, GS029)
use low patching (Ef, Mc and the VLBA stations are unaffected).

Since the GB064 PI is away until May 22, I guess that station friends
will have to do the necessary LO changes themselves.

There are 4 FTP scans each 4 sec long, two for each frequency setup.

Best wishes and good luck with the session

Schedule for HART      (Code Hh )                                   Page   2
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Fri  13 Jun 2008   Day 165 ---

 Next scan frequencies:  6124.10  6124.10
 Next BBC frequencies:    199.10   199.10
 Next scan bandwidths:     16.00    16.00

13 00 00  DA193        08 19 35  16.3 332.0  2.4       0.0     0   1  1      0  13 00 00
13 10 00  ---          08 29 36  15.2 330.4  2.6       0.0   600   F  1     10  13 00 04

13 12 00  DA193        08 31 37  15.0 330.1  2.6       0.0    95   1  1     10  13 12 00
13 22 00  ---          08 41 38  13.8 328.5  2.8       0.0   600   F  1     19  13 12 04

13 28 00  4C39.25      08 47 39  24.4   8.5 -0.7       0.0   230   1  1     19  13 28 00
13 38 00  ---          08 57 41  24.7   6.4 -0.5       0.0   600   F  1     29  13 28 04

13 39 00  4C39.25      08 58 41  24.8   6.2 -0.5       0.0    36   1  1     29  13 39 00
13 44 00  ---          09 03 42  24.9   5.1 -0.4       0.0   300   F  1     34  13 39 04

13 45 00  4C39.25      09 04 42  24.9   4.9 -0.4       0.0    36   1  1     34  13 45 00
13 55 00  ---          09 14 44  25.0   2.8 -0.2       0.0   600   F  1     44  13 45 04

13 59 00  4C39.25      09 18 44  25.1   1.9 -0.1       0.0   212   1  1     44  13 59 00
14 02 00  ---          09 21 45  25.1   1.3 -0.1       0.0   180   F  1     46  13 59 04

14 02 00  J0916+3854   09 21 45  25.2 359.1  0.1       0.0   -32   1  1     46  14 02 00
14 07 00  =0913+391    09 26 46  25.2 358.0  0.2       0.0   268   F  1     51  14 02 04

14 07 00  4C39.25      09 26 46  25.1   0.2  0.0       0.0   -32   1  1     51  14 07 00
14 10 00  ---          09 29 46  25.1 359.5  0.0       0.0   148   F  1     54  14 07 04

14 10 00  J0916+3854   09 29 46  25.2 357.3  0.2       0.0   -32   1  1     54  14 10 00
14 15 00  =0913+391    09 34 47  25.1 356.3  0.3       0.0   268   F  1     59  14 10 04

14 15 40  4C39.25      09 35 27  25.1 358.3  0.1       0.0     8   1  1     59  14 15 40
14 18 40  ---          09 38 28  25.1 357.7  0.2       0.0   180   F  1     62  14 15 44

14 18 40  J0916+3854   09 38 28  25.0 355.5  0.4       0.0   -32   1  1     62  14 18 40
14 23 40  =0913+391    09 43 29  24.9 354.4  0.4       0.0   268   F  1     67  14 18 44

14 23 40  4C39.25      09 43 29  25.0 356.6  0.3       0.0   -32   1  1     67  14 23 40
14 26 40  ---          09 46 29  25.0 356.0  0.3       0.0   148   F  1     70  14 23 44

14 26 40  J0916+3854   09 46 29  24.9 353.8  0.5       0.0   -32   1  1     70  14 26 40
14 31 40  =0913+391    09 51 30  24.7 352.7  0.6       0.0   268   F  1     75  14 26 44
Schedule for HART      (Code Hh )                                   Page   3
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Fri  13 Jun 2008   Day 165 ---

14 32 20  4C39.25      09 52 10  24.9 354.7  0.4       0.0     8   1  1     75  14 32 20
14 35 20  ---          09 55 10  24.8 354.1  0.5       0.0   180   F  1     77  14 32 24

14 35 20  J0916+3854   09 55 10  24.6 351.9  0.6       0.0   -32   1  1     77  14 35 20
14 40 20  =0913+391    10 00 11  24.5 350.9  0.7       0.0   268   F  1     82  14 35 24

14 40 20  4C39.25      10 00 11  24.7 353.0  0.5       0.0   -32   1  1     82  14 40 20
14 43 20  ---          10 03 12  24.6 352.4  0.6       0.0   148   F  1     85  14 40 24

14 43 20  J0916+3854   10 03 12  24.4 350.2  0.8       0.0   -32   1  1     85  14 43 20
14 48 20  =0913+391    10 08 13  24.2 349.2  0.8       0.0   268   F  1     90  14 43 24

14 49 00  4C39.25      10 08 53  24.4 351.2  0.7       0.0     8   1  1     90  14 49 00
14 52 00  ---          10 11 53  24.3 350.6  0.7       0.0   180   F  1     93  14 49 04

14 52 00  J0916+3854   10 11 53  24.0 348.4  0.9       0.0   -32   1  1     93  14 52 00
14 57 00  =0913+391    10 16 54  23.8 347.4  1.0       0.0   268   F  1     98  14 52 04

14 57 00  4C39.25      10 16 54  24.1 349.5  0.8       0.0   -32   1  1     98  14 57 00
15 00 00  ---          10 19 54  24.0 348.9  0.9       0.0   148   F  1    101  14 57 04

15 00 00  J0916+3854   10 19 54  23.6 346.8  1.0       0.0   -32   1  1    101  15 00 00
15 05 00  =0913+391    10 24 55  23.3 345.7  1.1       0.0   268   F  1    105  15 00 04

15 05 40  4C39.25      10 25 35  23.7 347.7  1.0       0.0     8   1  1    105  15 05 40
15 08 40  ---          10 28 36  23.6 347.1  1.0       0.0   180   F  1    108  15 05 44

 Next scan frequencies:  6028.00  6028.00  6028.00  6028.00  6036.00  6036.00
                         6036.00  6036.00  6044.00  6044.00  6044.00  6044.00
                         6052.00  6052.00  6052.00  6052.00
 Next BBC frequencies:    103.00   103.00   103.00   103.00   111.00   111.00
                          111.00   111.00   119.00   119.00   119.00   119.00
                          127.00   127.00   127.00   127.00
 Next scan bandwidths:      4.00     4.00     4.00     4.00     4.00     4.00
                            4.00     4.00     4.00     4.00     4.00     4.00
                            4.00     4.00     4.00     4.00

15 14 40  3C273B       10 34 37  50.6  49.2 -1.9       0.0   245   1  1    108  15 14 40
15 17 40  ---          10 37 37  51.1  48.4 -1.9       0.0   180   F  1    114  15 15 08

15 18 40  3C273B       10 38 38  51.3  48.1 -1.8       0.0    36   1  1    114  15 18 40
15 23 40  ---          10 43 38  52.1  46.6 -1.8       0.0   300   F  1    124  15 18 44
Schedule for HART      (Code Hh )                                   Page   4
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Fri  13 Jun 2008   Day 165 ---

15 27 40  3C273B       10 47 39  52.8  45.3 -1.7       0.0   212   1  1    124  15 27 40
15 31 40  ---          10 51 40  53.4  44.0 -1.6       0.0   240   F  1    132  15 27 44

15 32 40  3C273B       10 52 40  53.6  43.7 -1.6       0.0    36   1  1    132  15 32 40
15 34 10  ---          10 54 10  53.8  43.2 -1.6       0.0    90   F  1    135  15 32 44

15 34 10  1222+037     10 54 10  53.3  40.3 -1.5       0.0   -29   1  1    135  15 34 10
15 37 40  ---          10 57 41  53.8  39.1 -1.5       0.0   181   F  1    141  15 34 14

15 37 40  3C273B       10 57 41  54.3  42.0 -1.5       0.0   -29   1  1    141  15 37 40
15 39 10  ---          10 59 11  54.6  41.5 -1.5       0.0    61   F  1    144  15 37 44

15 39 10  1222+037     10 59 11  54.0  38.5 -1.4       0.0   -29   1  1    144  15 39 10
15 42 40  ---          11 02 41  54.5  37.3 -1.4       0.0   181   F  1    151  15 39 14

15 43 20  3C273B       11 03 22  55.2  40.0 -1.4       0.0    11   1  1    151  15 43 20
15 44 50  ---          11 04 52  55.4  39.5 -1.4       0.0    90   F  1    154  15 43 24

15 44 50  1222+037     11 04 52  54.8  36.5 -1.3       0.0   -29   1  1    154  15 44 50
15 48 20  ---          11 08 22  55.2  35.2 -1.3       0.0   181   F  1    161  15 44 54

15 48 20  3C273B       11 08 22  55.9  38.2 -1.4       0.0   -29   1  1    161  15 48 20
15 49 50  ---          11 09 53  56.1  37.6 -1.3       0.0    61   F  1    164  15 48 24

15 49 50  1222+037     11 09 53  55.4  34.7 -1.3       0.0   -29   1  1    164  15 49 50
15 53 20  ---          11 13 23  55.9  33.3 -1.2       0.0   181   F  1    170  15 49 54

15 53 20  3C273B       11 13 23  56.6  36.3 -1.3       0.0   -29   1  1    170  15 53 20
15 54 50  ---          11 14 53  56.8  35.7 -1.2       0.0    61   F  1    173  15 53 24

15 55 50  3C273B       11 15 54  56.9  35.3 -1.2       0.0    36   1  1    173  15 55 50
15 57 20  ---          11 17 24  57.1  34.7 -1.2       0.0    90   F  1    176  15 55 54

15 57 20  1222+037     11 17 24  56.4  31.7 -1.1       0.0   -29   1  1    176  15 57 20
16 00 50  ---          11 20 54  56.8  30.3 -1.1       0.0   181   F  1    183  15 57 24

16 00 50  3C273B       11 20 54  57.5  33.3 -1.1       0.0   -29   1  1    183  16 00 50
16 02 20  ---          11 22 25  57.7  32.7 -1.1       0.0    61   F  1    186  16 00 54

16 02 20  1222+037     11 22 25  56.9  29.7 -1.0       0.0   -29   1  1    186  16 02 20
16 05 50  ---          11 25 55  57.3  28.3 -1.0       0.0   181   F  1    193  16 02 24

16 06 30  3C273B       11 26 35  58.2  31.0 -1.0       0.0    11   1  1    193  16 06 30
16 08 00  ---          11 28 06  58.4  30.4 -1.0       0.0    90   F  1    195  16 06 34
Schedule for HART      (Code Hh )                                   Page   5
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Fri  13 Jun 2008   Day 165 ---

16 08 00  1222+037     11 28 06  57.5  27.4 -1.0       0.0   -29   1  1    195  16 08 00
16 11 30  ---          11 31 36  57.9  25.9 -0.9       0.0   181   F  1    202  16 08 04

16 11 30  3C273B       11 31 36  58.8  28.8 -1.0       0.0   -29   1  1    202  16 11 30
16 13 00  ---          11 33 06  58.9  28.2 -0.9       0.0    61   F  1    205  16 11 34

16 13 00  1222+037     11 33 06  58.0  25.2 -0.9       0.0   -29   1  1    205  16 13 00
16 16 30  ---          11 36 37  58.4  23.7 -0.8       0.0   181   F  1    212  16 13 04

16 16 30  3C273B       11 36 37  59.3  26.6 -0.9       0.0   -29   1  1    212  16 16 30
16 18 00  ---          11 38 07  59.5  26.0 -0.9       0.0    61   F  1    215  16 16 34

16 19 00  3C273B       11 39 07  59.6  25.5 -0.8       0.0    36   1  1    215  16 19 00
16 20 30  ---          11 40 38  59.7  24.8 -0.8       0.0    90   F  1    218  16 19 04

16 20 30  1222+037     11 40 38  58.7  21.9 -0.7       0.0   -29   1  1    218  16 20 30
16 24 00  ---          11 44 08  59.0  20.3 -0.7       0.0   181   F  1    225  16 20 34

16 24 00  3C273B       11 44 08  60.0  23.2 -0.8       0.0   -29   1  1    225  16 24 00
16 25 30  ---          11 45 39  60.2  22.5 -0.7       0.0    61   F  1    227  16 24 04

16 25 30  1222+037     11 45 39  59.1  19.6 -0.7       0.0   -29   1  1    227  16 25 30
16 29 00  ---          11 49 09  59.4  17.9 -0.6       0.0   181   F  1    234  16 25 34

16 29 40  3C273B       11 49 49  60.5  20.5 -0.7       0.0    11   1  1    234  16 29 40
16 31 10  ---          11 51 19  60.6  19.8 -0.6       0.0    90   F  1    237  16 29 44

16 31 10  1222+037     11 51 19  59.5  16.9 -0.6       0.0   -29   1  1    237  16 31 10
16 34 40  ---          11 54 50  59.7  15.2 -0.5       0.0   181   F  1    244  16 31 14

16 34 40  3C273B       11 54 50  60.9  18.1 -0.6       0.0   -29   1  1    244  16 34 40
16 36 10  ---          11 56 20  61.0  17.3 -0.6       0.0    61   F  1    247  16 34 44

16 36 10  1222+037     11 56 20  59.8  14.5 -0.5       0.0   -29   1  1    247  16 36 10
16 39 40  ---          11 59 51  60.0  12.8 -0.4       0.0   181   F  1    254  16 36 14

16 39 40  3C273B       11 59 51  61.2  15.6 -0.5       0.0   -29   1  1    254  16 39 40
16 41 10  ---          12 01 21  61.3  14.8 -0.5       0.0    61   F  1    256  16 39 44

16 42 10  3C273B       12 02 21  61.3  14.3 -0.5       0.0    36   1  1    256  16 42 10
16 43 40  ---          12 03 52  61.4  13.5 -0.4       0.0    90   F  1    259  16 42 14

16 43 40  1222+037     12 03 52  60.2  10.8 -0.4       0.0   -29   1  1    259  16 43 40
16 47 10  ---          12 07 22  60.3   9.1 -0.3       0.0   181   F  1    266  16 43 44
Schedule for HART      (Code Hh )                                   Page   6
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Fri  13 Jun 2008   Day 165 ---

16 47 10  3C273B       12 07 22  61.6  11.7 -0.4       0.0   -29   1  1    266  16 47 10
16 48 40  ---          12 08 52  61.7  10.9 -0.3       0.0    61   F  1    269  16 47 14

16 48 40  1222+037     12 08 52  60.4   8.3 -0.3       0.0   -29   1  1    269  16 48 40
16 52 10  ---          12 12 23  60.5   6.6 -0.2       0.0   181   F  1    276  16 48 44

16 52 50  3C273B       12 13 03  61.8   8.8 -0.3       0.0    11   1  1    276  16 52 50
16 54 20  ---          12 14 33  61.9   8.0 -0.3       0.0    90   F  1    279  16 52 54

16 54 20  1222+037     12 14 33  60.5   5.5 -0.2       0.0   -29   1  1    279  16 54 20
16 57 50  ---          12 18 04  60.6   3.7 -0.1       0.0   181   F  1    285  16 54 24

16 57 50  3C273B       12 18 04  62.0   6.1 -0.2       0.0   -29   1  1    285  16 57 50
16 59 20  ---          12 19 34  62.0   5.3 -0.2       0.0    61   F  1    288  16 57 54

16 59 20  1222+037     12 19 34  60.6   2.9 -0.1       0.0   -29   1  1    288  16 59 20
17 02 50  ---          12 23 05  60.6   1.1  0.0       0.0   181   F  1    295  16 59 24

17 02 50  3C273B       12 23 05  62.1   3.5 -0.1       0.0   -29   1  1    295  17 02 50
17 04 20  ---          12 24 35  62.1   2.7 -0.1       0.0    61   F  1    298  17 02 54

17 05 20  3C273B       12 25 35  62.1   2.1 -0.1       0.0    36   1  1    298  17 05 20
17 10 20  ---          12 30 36  62.1 359.4  0.0       0.0   300   F  1    308  17 05 24

17 14 20  3C273B       12 34 37  62.1 357.3  0.1       0.0   212   1  1    308  17 14 20
17 19 20  ---          12 39 37  62.0 354.6  0.2       0.0   300   F  1    317  17 14 24

17 20 20  3C273B       12 40 38  62.0 354.1  0.2       0.0    36   1  1    317  17 20 20
17 21 50  ---          12 42 08  61.9 353.3  0.2       0.0    90   F  1    320  17 20 24

17 21 50  1222+037     12 42 08  60.4 351.5  0.3       0.0   -29   1  1    320  17 21 50
17 25 20  ---          12 45 38  60.2 349.7  0.3       0.0   181   F  1    327  17 21 54

17 25 20  3C273B       12 45 38  61.8 351.5  0.3       0.0   -29   1  1    327  17 25 20
17 26 50  ---          12 47 09  61.8 350.7  0.3       0.0    61   F  1    330  17 25 24

17 26 50  1222+037     12 47 09  60.2 349.0  0.4       0.0   -29   1  1    330  17 26 50
17 29 20  ---          12 49 39  60.1 347.8  0.4       0.0   121   F  1    335  17 26 54

17 30 00  3C273B       12 50 19  61.7 349.0  0.3       0.0    11   1  1    335  17 30 00
17 31 30  ---          12 51 49  61.6 348.2  0.4       0.0    90   F  1    338  17 30 04

17 31 30  1222+037     12 51 49  60.0 346.7  0.4       0.0   -29   1  1    338  17 31 30
17 34 00  ---          12 54 20  59.8 345.5  0.5       0.0   121   F  1    343  17 31 34
Schedule for HART      (Code Hh )                                   Page   7
               Network Monitoring Expt
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Fri  13 Jun 2008   Day 165 ---

17 34 00  3C273B       12 54 20  61.5 347.0  0.4       0.0   -29   1  1    343  17 34 00
17 35 30  ---          12 55 50  61.4 346.2  0.4       0.0    61   F  1    345  17 34 04

17 35 30  1222+037     12 55 50  59.7 344.8  0.5       0.0   -29   1  1    345  17 35 30
17 38 00  ---          12 58 20  59.6 343.6  0.6       0.0   121   F  1    350  17 35 34

17 38 00  3C273B       12 58 20  61.3 344.9  0.5       0.0   -29   1  1    350  17 38 00
17 39 30  ---          12 59 51  61.2 344.2  0.5       0.0    61   F  1    353  17 38 04

17 40 30  3C273B       13 00 51  61.1 343.7  0.5       0.0    36   1  1    353  17 40 30
17 42 00  ---          13 02 21  61.0 342.9  0.5       0.0    90   F  1    356  17 40 34

17 42 00  1222+037     13 02 21  59.3 341.7  0.6       0.0   -29   1  1    356  17 42 00
17 45 30  ---          13 05 52  59.0 340.0  0.7       0.0   181   F  1    363  17 42 04

17 45 30  3C273B       13 05 52  60.8 341.2  0.6       0.0   -29   1  1    363  17 45 30
17 47 00  ---          13 07 22  60.6 340.4  0.6       0.0    61   F  1    366  17 45 34

17 47 00  1222+037     13 07 22  58.9 339.3  0.7       0.0   -29   1  1    366  17 47 00
17 49 30  ---          13 09 52  58.7 338.2  0.7       0.0   121   F  1    371  17 47 04

17 50 10  3C273B       13 10 32  60.4 338.9  0.7       0.0    11   1  1    371  17 50 10
17 51 40  ---          13 12 03  60.3 338.2  0.7       0.0    90   F  1    374  17 50 14

17 51 40  1222+037     13 12 03  58.5 337.2  0.8       0.0   -29   1  1    374  17 51 40
17 54 10  ---          13 14 33  58.3 336.1  0.8       0.0   121   F  1    378  17 51 44

17 54 10  3C273B       13 14 33  60.1 337.0  0.7       0.0   -29   1  1    378  17 54 10
17 55 40  ---          13 16 03  59.9 336.3  0.8       0.0    61   F  1    381  17 54 14

17 55 40  1222+037     13 16 03  58.2 335.4  0.8       0.0   -29   1  1    381  17 55 40
17 58 10  ---          13 18 34  57.9 334.3  0.9       0.0   121   F  1    386  17 55 44

17 58 10  3C273B       13 18 34  59.7 335.2  0.8       0.0   -29   1  1    386  17 58 10
17 59 40  ---          13 20 04  59.5 334.5  0.8       0.0    61   F  1    389  17 58 14


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: gb064.5cm
   Matches group hh5cm_S2 in n08m2freq.dat
    Values confirmed by E-mail Jonathan Quick 291100 (CR)

   Setup group:   18         Station: HART              Total bit rate:  128
   Format: MKIV1:4           Bits per sample: 2         Sample rate: 32.000
   Number of channels:  2                               Speedup factor:   1.00

   Disk used to record data.

   1st LO=   5925.00   5925.00
   Net SB=         L         L
   Pol.  =      RCP       LCP 
   BBC   =         2         1
   BBC SB=         L         L
   IF    =        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:   9  Setup file default.  No pcal detection.
   LO sum=    6124.10   6124.10
   BBC fr=     199.10    199.10
   Bandwd=     16.000    16.000

   Track assignments are: 
    track1=   2, 18
    barrel=roll_off 


 Setup file: NME.5CMOH
   Matches group hh5cm_S2 in n08m2freq.dat
    Values confirmed by E-mail Jonathan Quick 291100 (CR)

   Setup group:    9         Station: HART              Total bit rate:  256
   Format: MKIV1:1           Bits per sample: 2         Sample rate:  8.000
   Number of channels: 16                               Speedup factor:   1.00

   Disk used to record data.

   1st LO=   5925.00   5925.00   5925.00   5925.00   5925.00   5925.00   5925.00   5925.00
             5925.00   5925.00   5925.00   5925.00   5925.00   5925.00   5925.00   5925.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         2         1         2         1         4         3         4         3
                   6         5         6         5         8         7         8         7
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        2N        1N        2N        1N        2N        1N        2N        1N
                  2N        1N        2N        1N        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:  18  Setup file default.  No pcal detection.
   LO sum=    6028.00   6028.00   6028.00   6028.00   6036.00   6036.00   6036.00   6036.00
              6044.00   6044.00   6044.00   6044.00   6052.00   6052.00   6052.00   6052.00
   BBC fr=     103.00    103.00    103.00    103.00    111.00    111.00    111.00    111.00
               119.00    119.00    119.00    119.00    127.00    127.00    127.00    127.00
   Bandwd=      4.000     4.000     4.000     4.000     4.000     4.000     4.000     4.000
                4.000     4.000     4.000     4.000     4.000     4.000     4.000     4.000

   Track assignments are: 
    track1=   2,  6, 10, 14, 18, 22, 26, 30,  3,  7, 11, 15, 19, 23, 27, 31
    barrel=roll_off 
 SOURCE LIST -- Network Monitoring Expt
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

   J0555+3948        05 52 01.407172   * 05 55 30.805614     05 56 05.290555       0.26
   0552+398          39 48 21.94585    * 39 48 49.16500      39 48 59.57837        0.40
 * DA193             /aps3/sched/catalogs/sources.vlba
   J0555+39          VLBA Calib Srcs - GSFC sols. - catalog 2004f_astro
                        0.333 scan hours,     12.000 baseline hours above horizon.

 * J0916+3854        09 13 39.517545   * 09 16 48.904569     09 17 20.897834       0.33
   0913+391          39 07 02.11837    * 38 54 28.14652      38 52 30.84066        0.49
   J0916+38          /aps3/sched/catalogs/sources.vlba
                     VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro
                        0.667 scan hours,     18.356 baseline hours above horizon.

   J0927+3902        09 23 55.319213   * 09 27 03.013934     09 27 34.787495       0.26
   0923+392          39 15 23.56648    * 39 02 20.85188      39 00 18.73243        0.40
 * 4C39.25           /aps3/sched/catalogs/sources.vlba
   J0927+39          VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro
                        0.867 scan hours,     28.362 baseline hours above horizon.

   J1224+0330        12 22 19.097169   * 12 24 52.421935     12 25 19.275277       0.31
 * 1222+037          03 47 27.06612    * 03 30 50.29297      03 27 57.39237        0.24
   J1224+03          /aps3/sched/catalogs/sources.vlba
                     VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro
                        1.300 scan hours,     41.158 baseline hours above horizon.

   J1229+0203        12 26 33.245836   * 12 29 06.699732     12 29 33.590208       0.30
   1226+023          02 19 43.30565    * 02 03 08.59815      02 00 15.45025        0.20
   3C273             /aps3/sched/catalogs/sources.vlba
 * 3C273B            VLBA Calib Survey - GSFC sols. - created L.Petrov 2005f_astro
   J1229+02             1.117 scan hours,     35.972 baseline hours above horizon.



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   DA193               17.5
   J0916+3854          50.4
   4C39.25             52.4
   1222+037           101.4
   3C273B             103.0

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 