COVER INFORMATION Station: TORUN (Code Tr ) Experiment: Arp 299-A at 1 Gb/s Exp. Code: EP068D Schedule Version: 1.10 Processed by SCHED version: 9.30 Release near March 23, 2010 PI: Miguel A. Perez-Torres Address: IAA - CSIC Glorieta de la Astronomia s/n 18008 Granada, Spain Phone: +34-958230644 EMAIL: torres@iaa.es Fax: +34-958814530 Phone during observation: +34-665252538 Observing mode: 1024 Mbps Notes: Phase-ref of Arp 299 with the full EVN Fourth epoch obs-ns at 18cm, but third with full EVN to EFF: please make sure that azs are in the >300 branch Schedule for TORUN (Code Tr ) Page 2 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- Next scan frequencies: 1610.49 1610.49 1610.49 1610.49 1642.49 1642.49 1642.49 1642.49 1674.49 1674.49 1674.49 1674.49 1706.49 1706.49 1706.49 1706.49 Next BBC frequencies: 689.51 689.51 689.51 689.51 657.51 657.51 657.51 657.51 625.51 625.51 625.51 625.51 593.51 593.51 593.51 593.51 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 12 10 00 4C39.25 06 46 09 59.2 100.7 -2.7 -49.4 0 1 1 0 12 10 00 12 18 00 --- 06 54 10 60.3 102.8 -2.6 -48.9 480 F 1 62 12 10 01 12 19 00 J1128+5925 06 55 10 53.2 52.3 -4.6 -68.7 -56 1 1 62 12 19 00 12 22 00 --- 06 58 11 53.5 52.5 -4.5 -69.2 124 F 1 85 12 19 01 12 22 00 ARP299 06 58 11 53.2 53.8 -4.5 -68.1 -15 1 1 85 No stop 12 25 30 --- 07 01 42 53.6 54.1 -4.5 -68.6 195 F 1 112 12 22 01 12 25 30 J1128+5925 07 01 42 54.0 52.8 -4.5 -69.7 -15 1 1 112 No stop 12 27 00 --- 07 03 12 54.1 52.9 -4.4 -69.9 75 F 1 124 12 25 31 12 27 00 ARP299 07 03 12 53.8 54.2 -4.4 -68.8 -15 1 1 124 No stop 12 30 30 --- 07 06 42 54.2 54.5 -4.4 -69.3 195 F 1 151 12 27 01 12 31 30 J1128+5925 07 07 43 54.7 53.2 -4.4 -70.6 45 1 1 151 12 31 30 12 33 00 --- 07 09 13 54.9 53.3 -4.3 -70.9 90 F 1 163 12 31 31 12 33 00 ARP299 07 09 13 54.5 54.7 -4.3 -69.7 -15 1 1 163 No stop 12 36 30 --- 07 12 43 55.0 55.0 -4.3 -70.2 195 F 1 190 12 33 01 12 36 30 J1128+5925 07 12 43 55.3 53.6 -4.3 -71.4 -16 1 1 190 No stop 12 38 00 --- 07 14 14 55.5 53.7 -4.2 -71.7 74 F 1 201 12 36 31 12 38 00 ARP299 07 14 14 55.1 55.1 -4.2 -70.4 -16 1 1 201 No stop 12 41 30 --- 07 17 44 55.6 55.3 -4.2 -71.0 194 F 1 228 12 38 01 12 41 30 J1128+5925 07 17 44 55.9 53.9 -4.2 -72.2 -16 1 1 228 No stop 12 43 00 --- 07 19 14 56.1 54.0 -4.2 -72.5 74 F 1 240 12 41 31 12 43 00 ARP299 07 19 14 55.8 55.5 -4.2 -71.2 -16 1 1 240 No stop 12 46 30 --- 07 22 45 56.2 55.7 -4.1 -71.7 194 F 1 267 12 43 01 Schedule for TORUN (Code Tr ) Page 3 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 12 47 30 J1128+5925 07 23 45 56.6 54.3 -4.1 -73.2 44 1 1 267 12 47 30 12 49 00 --- 07 25 15 56.8 54.4 -4.1 -73.4 90 F 1 279 12 47 31 12 49 00 ARP299 07 25 15 56.5 55.9 -4.1 -72.1 -16 1 1 279 No stop 12 52 30 --- 07 28 46 56.9 56.1 -4.0 -72.7 194 F 1 306 12 49 01 12 52 30 J1128+5925 07 28 46 57.2 54.7 -4.0 -74.0 -16 1 1 306 No stop 12 54 00 --- 07 30 16 57.4 54.8 -4.0 -74.2 74 F 1 317 12 52 31 12 54 00 ARP299 07 30 16 57.1 56.3 -4.0 -72.9 -16 1 1 317 No stop 12 57 30 --- 07 33 47 57.6 56.5 -3.9 -73.4 194 F 1 344 12 54 01 12 58 30 J1128+5925 07 34 47 58.0 55.0 -3.9 -74.9 44 1 1 344 12 58 30 13 00 00 --- 07 36 17 58.2 55.1 -3.9 -75.2 90 F 1 356 12 58 31 13 00 00 ARP299 07 36 17 57.9 56.7 -3.9 -73.8 -16 1 1 356 No stop 13 03 30 --- 07 39 48 58.3 56.9 -3.8 -74.4 194 F 1 383 13 00 01 13 03 30 J1128+5925 07 39 48 58.6 55.3 -3.8 -75.8 -16 1 1 383 No stop 13 05 00 --- 07 41 18 58.8 55.4 -3.8 -76.0 74 F 1 395 13 03 31 13 05 00 ARP299 07 41 18 58.5 57.0 -3.8 -74.6 -16 1 1 395 No stop 13 08 30 --- 07 44 49 59.0 57.2 -3.7 -75.1 194 F 1 422 13 05 01 13 08 30 J1128+5925 07 44 49 59.2 55.6 -3.7 -76.6 -16 1 1 422 No stop 13 10 00 --- 07 46 19 59.4 55.7 -3.7 -76.8 74 F 1 434 13 08 31 13 10 00 ARP299 07 46 19 59.1 57.3 -3.7 -75.4 -16 1 1 434 No stop 13 13 30 --- 07 49 49 59.6 57.6 -3.7 -75.9 194 F 1 461 13 10 01 13 14 30 J1128+5925 07 50 50 60.0 56.0 -3.6 -77.6 44 1 1 461 13 14 30 13 16 00 --- 07 52 20 60.1 56.1 -3.6 -77.8 90 F 1 472 13 14 31 13 16 00 ARP299 07 52 20 59.9 57.7 -3.6 -76.3 -17 1 1 472 No stop 13 19 30 --- 07 55 50 60.4 57.9 -3.6 -76.9 193 F 1 499 13 16 01 13 19 30 J1128+5925 07 55 50 60.6 56.3 -3.6 -78.4 -17 1 1 499 No stop 13 21 00 --- 07 57 21 60.8 56.3 -3.5 -78.7 73 F 1 511 13 19 31 13 21 00 ARP299 07 57 21 60.5 58.0 -3.5 -77.1 -17 1 1 511 No stop 13 24 30 --- 08 00 51 61.0 58.2 -3.5 -77.7 193 F 1 538 13 21 01 13 24 30 J1128+5925 08 00 51 61.2 56.5 -3.5 -79.3 -17 1 1 538 No stop 13 26 00 --- 08 02 21 61.4 56.6 -3.4 -79.6 73 F 1 550 13 24 31 Schedule for TORUN (Code Tr ) Page 4 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 13 26 00 ARP299 08 02 21 61.2 58.3 -3.4 -78.0 -17 1 1 550 No stop 13 29 30 --- 08 05 52 61.6 58.5 -3.4 -78.5 193 F 1 577 13 26 01 13 30 30 J1128+5925 08 06 52 62.0 56.8 -3.4 -80.3 43 1 1 577 13 30 30 13 32 00 --- 08 08 22 62.2 56.9 -3.3 -80.6 90 F 1 588 13 30 31 13 32 00 ARP299 08 08 22 62.0 58.6 -3.3 -78.9 -17 1 1 588 No stop 13 35 30 --- 08 11 53 62.4 58.8 -3.3 -79.5 193 F 1 615 13 32 01 13 35 30 J1128+5925 08 11 53 62.6 57.0 -3.3 -81.2 -17 1 1 615 No stop 13 37 00 --- 08 13 23 62.8 57.1 -3.3 -81.5 73 F 1 627 13 35 31 13 37 00 ARP299 08 13 23 62.6 58.9 -3.3 -79.8 -17 1 1 627 No stop 13 40 30 --- 08 16 54 63.1 59.1 -3.2 -80.4 193 F 1 654 13 37 01 13 40 30 J1128+5925 08 16 54 63.2 57.2 -3.2 -82.1 -17 1 1 654 No stop 13 42 00 --- 08 18 24 63.4 57.3 -3.2 -82.4 73 F 1 666 13 40 31 13 42 00 ARP299 08 18 24 63.2 59.1 -3.2 -80.6 -17 1 1 666 No stop 13 45 30 --- 08 21 55 63.7 59.3 -3.1 -81.2 193 F 1 693 13 42 01 13 46 30 J1128+5925 08 22 55 64.0 57.4 -3.1 -83.2 43 1 1 693 13 46 30 13 48 00 --- 08 24 25 64.2 57.5 -3.1 -83.5 90 F 1 704 13 46 31 13 48 00 ARP299 08 24 25 64.0 59.4 -3.1 -81.7 -17 1 1 704 No stop 13 51 30 --- 08 27 56 64.5 59.6 -3.0 -82.3 193 F 1 732 13 48 01 13 51 30 J1128+5925 08 27 56 64.6 57.6 -3.0 -84.1 -18 1 1 732 No stop 13 53 00 --- 08 29 26 64.8 57.6 -3.0 -84.4 72 F 1 743 13 51 31 13 53 00 ARP299 08 29 26 64.7 59.6 -3.0 -82.6 -18 1 1 743 No stop 13 56 30 --- 08 32 56 65.1 59.8 -2.9 -83.2 192 F 1 770 13 53 01 13 57 30 4C39.25 08 33 57 73.1 141.4 -0.9 -28.8 -118 1 1 770 13 57 30 14 05 00 --- 08 41 28 73.8 146.0 -0.8 -25.6 332 F 1 828 13 57 31 14 06 00 J1128+5925 08 42 28 66.5 57.9 -2.8 -87.0 -131 1 1 828 14 06 00 14 09 00 --- 08 45 29 66.9 58.0 -2.7 -87.6 49 F 1 852 14 06 01 14 09 00 ARP299 08 45 29 66.8 60.2 -2.7 -85.5 -18 1 1 852 No stop 14 12 30 --- 08 48 59 67.2 60.2 -2.7 -86.2 192 F 1 879 14 09 01 14 12 30 J1128+5925 08 48 59 67.3 58.0 -2.7 -88.3 -18 1 1 879 No stop 14 14 00 --- 08 50 29 67.5 58.0 -2.6 -88.6 72 F 1 890 14 12 31 Schedule for TORUN (Code Tr ) Page 5 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 14 14 00 ARP299 08 50 29 67.4 60.3 -2.6 -86.5 -18 1 1 890 No stop 14 17 30 --- 08 54 00 67.9 60.3 -2.6 -87.1 192 F 1 917 14 14 01 14 18 30 J1128+5925 08 55 00 68.1 58.1 -2.6 -89.5 42 1 1 917 14 18 30 14 20 00 --- 08 56 30 68.3 58.1 -2.5 -89.9 90 F 1 929 14 18 31 14 20 00 ARP299 08 56 30 68.2 60.4 -2.5 -87.6 -19 1 1 929 No stop 14 23 30 --- 09 00 01 68.7 60.4 -2.5 -88.3 191 F 1 956 14 20 01 14 23 30 J1128+5925 09 00 01 68.7 58.1 -2.5 -90.6 -19 1 1 956 No stop 14 25 00 --- 09 01 31 68.9 58.1 -2.5 -90.9 71 F 1 968 14 23 31 14 25 00 ARP299 09 01 31 68.8 60.4 -2.5 -88.7 -19 1 1 968 No stop 14 28 30 --- 09 05 02 69.3 60.5 -2.4 -89.4 191 F 1 995 14 25 01 14 28 30 J1128+5925 09 05 02 69.3 58.0 -2.4 -91.7 -19 1 1 995 No stop 14 30 00 --- 09 06 32 69.5 58.0 -2.4 -92.1 71 F 1 1006 14 28 31 14 30 00 ARP299 09 06 32 69.5 60.5 -2.4 -89.7 -19 1 1 1006 No stop 14 33 30 --- 09 10 03 70.0 60.5 -2.3 -90.4 191 F 1 1033 14 30 01 14 34 30 J1128+5925 09 11 03 70.1 57.9 -2.3 -93.1 41 1 1 1033 14 34 30 14 36 00 --- 09 12 33 70.3 57.9 -2.3 -93.5 90 F 1 1045 14 34 31 14 36 00 ARP299 09 12 33 70.3 60.5 -2.3 -91.0 -19 1 1 1045 No stop 14 39 30 --- 09 16 04 70.7 60.4 -2.2 -91.8 191 F 1 1072 14 36 01 14 39 30 J1128+5925 09 16 04 70.7 57.8 -2.2 -94.3 -19 1 1 1072 No stop 14 41 00 --- 09 17 34 70.9 57.8 -2.2 -94.7 71 F 1 1084 14 39 31 14 41 00 ARP299 09 17 34 70.9 60.4 -2.2 -92.1 -20 1 1 1084 No stop 14 44 30 --- 09 21 04 71.4 60.3 -2.1 -92.9 190 F 1 1111 14 41 01 14 45 30 J1128+5925 09 22 05 71.5 57.6 -2.1 -95.8 40 1 1 1111 14 45 30 14 47 00 --- 09 23 35 71.7 57.5 -2.1 -96.2 90 F 1 1123 14 45 31 14 47 00 ARP299 09 23 35 71.7 60.3 -2.1 -93.5 -20 1 1 1123 No stop 14 50 30 --- 09 27 05 72.2 60.2 -2.0 -94.4 190 F 1 1150 14 47 01 14 50 30 J1128+5925 09 27 05 72.1 57.4 -2.0 -97.1 -20 1 1 1150 No stop 14 52 00 --- 09 28 36 72.3 57.3 -2.0 -97.5 70 F 1 1161 14 50 31 14 52 00 ARP299 09 28 36 72.4 60.1 -2.0 -94.7 -20 1 1 1161 No stop 14 55 30 --- 09 32 06 72.8 60.0 -2.0 -95.6 190 F 1 1188 14 52 01 Schedule for TORUN (Code Tr ) Page 6 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 14 55 30 J1128+5925 09 32 06 72.8 57.1 -1.9 -98.4 -20 1 1 1188 No stop 14 57 00 --- 09 33 36 73.0 57.0 -1.9 -98.9 70 F 1 1200 14 55 31 14 57 00 ARP299 09 33 36 73.0 59.9 -1.9 -96.0 -20 1 1 1200 No stop 15 00 30 --- 09 37 07 73.5 59.7 -1.9 -96.9 190 F 1 1227 14 57 01 15 01 30 J1128+5925 09 38 07 73.5 56.7 -1.8 -100.1 39 1 1 1227 15 01 30 15 03 00 --- 09 39 37 73.7 56.5 -1.8 -100.6 90 F 1 1239 15 01 31 15 03 00 ARP299 09 39 37 73.8 59.6 -1.8 -97.6 -21 1 1 1239 No stop 15 06 30 --- 09 43 08 74.3 59.4 -1.8 -98.6 189 F 1 1266 15 03 01 15 06 30 J1128+5925 09 43 08 74.2 56.2 -1.8 -101.6 -21 1 1 1266 No stop 15 08 00 --- 09 44 38 74.3 56.1 -1.7 -102.1 69 F 1 1277 15 06 31 15 08 00 ARP299 09 44 38 74.5 59.2 -1.7 -99.0 -21 1 1 1277 No stop 15 11 30 --- 09 48 09 74.9 59.0 -1.7 -100.0 189 F 1 1304 15 08 01 15 11 30 J1128+5925 09 48 09 74.8 55.7 -1.7 -103.2 -21 1 1 1304 No stop 15 13 00 --- 09 49 39 75.0 55.5 -1.7 -103.7 69 F 1 1316 15 11 31 15 13 00 ARP299 09 49 39 75.1 58.8 -1.7 -100.5 -21 1 1 1316 No stop 15 16 30 --- 09 53 10 75.6 58.5 -1.6 -101.5 189 F 1 1343 15 13 01 15 17 30 J1128+5925 09 54 10 75.5 55.0 -1.6 -105.2 38 1 1 1343 15 17 30 15 19 00 --- 09 55 40 75.7 54.8 -1.6 -105.7 90 F 1 1355 15 17 31 15 19 00 ARP299 09 55 40 75.9 58.2 -1.6 -102.3 -22 1 1 1355 No stop 15 22 30 --- 09 59 11 76.3 57.8 -1.5 -103.5 188 F 1 1382 15 19 01 15 22 30 J1128+5925 09 59 11 76.1 54.3 -1.5 -107.0 -22 1 1 1382 No stop 15 24 00 --- 10 00 41 76.3 54.0 -1.5 -107.6 68 F 1 1393 15 22 31 15 24 00 ARP299 10 00 41 76.5 57.6 -1.5 -104.0 -22 1 1 1393 No stop 15 27 30 --- 10 04 11 77.0 57.1 -1.4 -105.3 188 F 1 1421 15 24 01 15 27 30 J1128+5925 10 04 11 76.7 53.4 -1.4 -108.9 -22 1 1 1421 No stop 15 29 00 --- 10 05 42 76.9 53.1 -1.4 -109.5 68 F 1 1432 15 27 31 15 29 00 ARP299 10 05 42 77.1 56.8 -1.4 -105.8 -22 1 1 1432 No stop 15 32 30 --- 10 09 12 77.6 56.2 -1.3 -107.1 188 F 1 1459 15 29 01 15 33 30 J1128+5925 10 10 12 77.5 52.2 -1.3 -111.3 37 1 1 1459 15 33 30 15 35 00 --- 10 11 43 77.6 51.9 -1.3 -112.0 90 F 1 1471 15 33 31 Schedule for TORUN (Code Tr ) Page 7 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 15 35 00 ARP299 10 11 43 77.9 55.8 -1.3 -108.1 -23 1 1 1471 No stop 15 38 30 --- 10 15 13 78.3 55.1 -1.2 -109.6 187 F 1 1498 15 35 01 15 38 30 J1128+5925 10 15 13 78.1 51.1 -1.2 -113.5 -23 1 1 1498 No stop 15 40 00 --- 10 16 44 78.2 50.7 -1.2 -114.2 67 F 1 1510 15 38 31 15 40 00 ARP299 10 16 44 78.5 54.7 -1.2 -110.2 -23 1 1 1510 No stop 15 43 30 --- 10 20 14 78.9 53.9 -1.1 -111.8 187 F 1 1537 15 40 01 15 43 30 J1128+5925 10 20 14 78.6 49.8 -1.1 -115.9 -23 1 1 1537 No stop 15 45 00 --- 10 21 44 78.8 49.3 -1.1 -116.7 67 F 1 1548 15 43 31 15 45 00 ARP299 10 21 44 79.1 53.5 -1.1 -112.5 -23 1 1 1548 No stop 15 48 30 --- 10 25 15 79.5 52.5 -1.1 -114.2 187 F 1 1575 15 45 01 15 49 30 J1128+5925 10 26 15 79.3 47.9 -1.0 -119.0 36 1 1 1575 15 49 30 15 51 00 --- 10 27 45 79.5 47.4 -1.0 -119.9 90 F 1 1587 15 49 31 15 51 00 ARP299 10 27 45 79.8 51.7 -1.0 -115.5 -24 1 1 1587 No stop 15 54 30 --- 10 31 16 80.3 50.6 -1.0 -117.4 186 F 1 1614 15 51 01 15 54 30 J1128+5925 10 31 16 79.9 46.1 -1.0 -121.9 -24 1 1 1614 No stop 15 56 00 --- 10 32 46 80.0 45.5 -0.9 -122.8 66 F 1 1626 15 54 31 15 56 00 ARP299 10 32 46 80.4 50.0 -0.9 -118.3 -24 1 1 1626 No stop 15 59 30 --- 10 36 17 80.8 48.6 -0.9 -120.4 186 F 1 1653 15 56 01 15 59 30 J1128+5925 10 36 17 80.4 44.1 -0.9 -125.0 -24 1 1 1653 No stop 16 01 00 --- 10 37 47 80.6 43.4 -0.9 -126.0 66 F 1 1664 15 59 31 16 01 00 ARP299 10 37 47 81.0 48.0 -0.9 -121.3 -24 1 1 1664 No stop 16 04 30 --- 10 41 18 81.4 46.4 -0.8 -123.7 186 F 1 1692 16 01 01 16 05 30 J1128+5925 10 42 18 81.0 41.2 -0.8 -129.1 35 1 1 1692 16 05 30 16 07 00 --- 10 43 48 81.2 40.4 -0.8 -130.2 90 F 1 1703 16 05 31 16 07 00 ARP299 10 43 48 81.7 45.1 -0.8 -125.5 -24 1 1 1703 No stop 16 10 30 --- 10 47 19 82.0 43.2 -0.7 -128.1 186 F 1 1730 16 07 01 16 10 30 J1128+5925 10 47 19 81.5 38.4 -0.7 -132.9 -24 1 1 1730 No stop 16 12 00 --- 10 48 49 81.6 37.5 -0.7 -134.1 66 F 1 1742 16 10 31 16 12 00 ARP299 10 48 49 82.2 42.3 -0.7 -129.3 -25 1 1 1742 No stop 16 15 30 --- 10 52 19 82.5 40.0 -0.6 -132.3 185 F 1 1769 16 12 01 Schedule for TORUN (Code Tr ) Page 8 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 16 15 30 J1128+5925 10 52 19 81.9 35.3 -0.6 -137.1 -24 1 1 1769 No stop 16 17 00 --- 10 53 50 82.1 34.3 -0.6 -138.4 66 F 1 1781 16 15 31 16 17 00 ARP299 10 53 50 82.7 39.0 -0.6 -133.7 -24 1 1 1781 No stop 16 20 30 --- 10 57 20 83.0 36.4 -0.5 -137.0 186 F 1 1808 16 17 01 16 21 30 J1128+5925 10 58 20 82.4 31.0 -0.5 -142.6 34 1 1 1808 16 21 30 16 23 00 --- 10 59 51 82.6 29.8 -0.5 -144.1 90 F 1 1819 16 21 31 16 23 00 ARP299 10 59 51 83.2 34.4 -0.5 -139.5 -24 1 1 1819 No stop 16 26 30 --- 11 03 21 83.5 31.3 -0.4 -143.4 186 F 1 1846 16 23 01 16 26 30 J1128+5925 11 03 21 82.8 26.9 -0.4 -147.8 -24 1 1 1846 No stop 16 28 00 --- 11 04 51 82.9 25.6 -0.4 -149.4 66 F 1 1858 16 26 31 16 28 00 ARP299 11 04 51 83.6 29.9 -0.4 -145.1 -23 1 1 1858 No stop 16 31 30 --- 11 08 22 83.9 26.3 -0.3 -149.4 187 F 1 1885 16 28 01 16 31 30 J1128+5925 11 08 22 83.1 22.4 -0.3 -153.4 -23 1 1 1885 No stop 16 33 00 --- 11 09 52 83.2 20.9 -0.3 -155.1 67 F 1 1897 16 31 31 16 33 00 ARP299 11 09 52 84.0 24.7 -0.3 -151.3 -22 1 1 1897 No stop 16 36 30 --- 11 13 23 84.2 20.8 -0.3 -156.0 188 F 1 1924 16 33 01 16 37 30 J1128+5925 11 14 23 83.4 16.3 -0.2 -160.6 36 1 1 1924 16 37 30 16 39 00 --- 11 15 53 83.5 14.7 -0.2 -162.6 90 F 1 1935 16 37 31 16 39 00 ARP299 11 15 53 84.3 17.7 -0.2 -159.5 -20 1 1 1935 No stop 16 42 30 --- 11 19 24 84.4 13.3 -0.2 -164.7 190 F 1 1962 16 39 01 16 42 30 J1128+5925 11 19 24 83.6 10.9 -0.2 -167.1 -19 1 1 1962 No stop 16 44 00 --- 11 20 54 83.6 9.2 -0.1 -169.1 71 F 1 1974 16 42 31 16 44 00 ARP299 11 20 54 84.5 11.3 -0.1 -166.9 -18 1 1 1974 No stop 16 47 30 --- 11 24 25 84.6 6.6 -0.1 -172.4 192 F 1 2001 16 44 01 16 47 30 J1128+5925 11 24 25 83.7 5.2 -0.1 -173.9 -16 1 1 2001 No stop 16 49 00 --- 11 25 55 83.7 3.5 0.0 -175.9 74 F 1 2013 16 47 31 16 49 00 ARP299 11 25 55 84.6 4.6 -0.1 -174.7 -16 1 1 2013 No stop 16 52 30 --- 11 29 25 84.6 -0.3 0.0 179.7 194 F 1 2040 16 49 01 16 53 30 J1128+5925 11 30 26 83.7 -1.8 0.0 177.9 44 1 1 2040 16 53 30 16 55 00 --- 11 31 56 83.7 -3.6 0.1 175.8 90 F 1 2051 16 53 31 Schedule for TORUN (Code Tr ) Page 9 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 16 55 00 ARP299 11 31 56 84.6 -3.8 0.0 175.7 -16 1 1 2051 No stop 16 58 30 --- 11 35 26 84.5 -8.5 0.1 170.2 194 F 1 2079 16 55 01 16 58 30 J1128+5925 11 35 26 83.7 -7.6 0.1 171.0 -16 1 1 2079 No stop 17 00 00 --- 11 36 57 83.6 -9.3 0.1 169.0 74 F 1 2090 16 58 31 17 00 00 ARP299 11 36 57 84.5 -10.6 0.1 167.8 -16 1 1 2090 No stop 17 03 30 --- 11 40 27 84.4 -15.1 0.2 162.6 194 F 1 2117 17 00 01 17 03 30 J1128+5925 11 40 27 83.5 -13.2 0.2 164.4 -17 1 1 2117 No stop 17 05 00 --- 11 41 57 83.5 -14.8 0.2 162.5 73 F 1 2129 17 03 31 17 05 00 ARP299 11 41 57 84.3 -17.0 0.2 160.4 -18 1 1 2129 No stop 17 08 30 --- 11 45 28 84.1 -21.2 0.3 155.4 192 F 1 2156 17 05 01 17 09 30 J1128+5925 11 46 28 83.3 -19.5 0.3 156.8 43 1 1 2156 17 09 30 17 11 00 --- 11 47 58 83.2 -21.0 0.3 155.0 90 F 1 2168 17 09 31 17 11 00 ARP299 11 47 58 84.0 -24.1 0.3 152.1 -21 1 1 2168 No stop 17 14 30 --- 11 51 29 83.8 -27.8 0.4 147.6 189 F 1 2195 17 11 01 17 14 30 J1128+5925 11 51 29 83.0 -24.3 0.4 151.0 -22 1 1 2195 No stop 17 16 00 --- 11 52 59 82.9 -25.7 0.4 149.3 68 F 1 2206 17 14 31 17 16 00 ARP299 11 52 59 83.6 -29.3 0.4 145.8 -22 1 1 2206 No stop 17 19 30 --- 11 56 30 83.4 -32.6 0.5 141.8 188 F 1 2233 17 16 01 17 19 30 J1128+5925 11 56 30 82.7 -28.7 0.5 145.6 -23 1 1 2233 No stop 17 21 00 --- 11 58 00 82.6 -29.9 0.5 144.1 67 F 1 2245 17 19 31 17 21 00 ARP299 11 58 00 83.3 -33.9 0.5 140.2 -23 1 1 2245 No stop 17 24 30 --- 12 01 31 83.0 -36.7 0.5 136.6 187 F 1 2272 17 21 01 17 25 30 J1128+5925 12 02 31 82.2 -33.3 0.6 139.7 38 1 1 2272 17 25 30 17 27 00 --- 12 04 01 82.1 -34.3 0.6 138.3 90 F 1 2284 17 25 31 17 27 00 ARP299 12 04 01 82.7 -38.6 0.6 134.2 -23 1 1 2284 No stop 17 30 30 --- 12 07 32 82.4 -41.0 0.6 131.1 187 F 1 2311 17 27 01 17 30 30 J1128+5925 12 07 32 81.8 -36.7 0.6 135.3 -24 1 1 2311 No stop 17 32 00 --- 12 09 02 81.6 -37.6 0.7 134.0 66 F 1 2322 17 30 31 17 32 00 ARP299 12 09 02 82.2 -41.9 0.7 129.8 -24 1 1 2322 No stop 17 35 30 --- 12 12 32 81.9 -44.0 0.7 127.0 186 F 1 2350 17 32 01 Schedule for TORUN (Code Tr ) Page 10 Arp 299-A at 1 Gb/s UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Sun 12 Jun 2011 Day 163 --- 17 35 30 J1128+5925 12 12 32 81.3 -39.6 0.7 131.3 -24 1 1 2350 No stop 17 37 00 --- 12 14 03 81.2 -40.5 0.8 130.1 66 F 1 2361 17 35 31 17 37 00 ARP299 12 14 03 81.7 -44.8 0.7 125.9 -24 1 1 2361 No stop 17 40 30 --- 12 17 33 81.3 -46.6 0.8 123.4 186 F 1 2388 17 37 01 17 41 30 J1128+5925 12 18 33 80.7 -42.7 0.8 126.9 37 1 1 2388 17 41 30 17 43 00 --- 12 20 04 80.6 -43.4 0.9 125.9 90 F 1 2400 17 41 31 17 43 00 ARP299 12 20 04 81.1 -47.7 0.8 121.7 -24 1 1 2400 No stop 17 46 30 --- 12 23 34 80.7 -49.2 0.9 119.5 186 F 1 2427 17 43 01 17 46 30 J1128+5925 12 23 34 80.2 -44.9 0.9 123.7 -23 1 1 2427 No stop 17 48 00 --- 12 25 05 80.0 -45.6 0.9 122.7 67 F 1 2439 17 46 31 17 48 00 ARP299 12 25 05 80.5 -49.8 0.9 118.6 -23 1 1 2439 No stop 17 51 30 --- 12 28 35 80.1 -51.1 1.0 116.6 187 F 1 2466 17 48 01 17 52 30 J1128+5925 12 29 35 79.5 -47.2 1.0 120.1 38 1 1 2466 17 52 30 17 54 00 --- 12 31 06 79.4 -47.8 1.0 119.3 90 F 1 2477 17 52 31 17 54 00 ARP299 12 31 06 79.8 -51.9 1.0 115.3 -23 1 1 2477 No stop 17 57 30 --- 12 34 36 79.4 -52.9 1.1 113.5 187 F 1 2504 17 54 01 17 57 30 J1128+5925 12 34 36 79.0 -48.9 1.1 117.4 -23 1 1 2504 No stop 17 59 00 --- 12 36 06 78.8 -49.3 1.1 116.6 67 F 1 2516 17 57 31 17 59 00 ARP299 12 36 06 79.2 -53.3 1.1 112.8 -23 1 1 2516 No stop 18 02 30 --- 12 39 37 78.8 -54.2 1.2 111.2 187 F 1 2543 17 59 01 18 03 30 J1128+5925 12 40 37 78.3 -50.6 1.2 114.4 38 1 1 2543 18 03 30 18 05 00 --- 12 42 07 78.1 -51.0 1.2 113.7 90 F 1 2555 18 03 31 18 05 00 ARP299 12 42 07 78.5 -54.8 1.2 110.1 -23 1 1 2555 No stop 18 08 30 --- 12 45 38 78.0 -55.6 1.3 108.6 187 F 1 2582 18 05 01 18 08 30 J1128+5925 12 45 38 77.7 -51.8 1.3 112.2 -22 1 1 2582 No stop 18 10 00 --- 12 47 08 77.5 -52.1 1.3 111.5 68 F 1 2593 18 08 31 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: sess211.L1024 Matching groups in /aps3/sched/catalogs/freq.dat: tr18cm E-mail Borkowski 12Mar98, preferred alternative Setup group: 6 Station: TORUN Total bit rate: 1024 Format: MKIV1:2 Bits per sample: 2 Sample rate: 32.000 Number of channels: 16 Speedup factor: 0.50 Disk used to record data. 1st LO= 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 Net SB= L L U U L L U U L L U U L L U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 1 2 3 4 3 4 5 6 5 6 7 8 7 8 BBC SB= U U L L U U L L U U L L U U L L IF = C A C A C A C A C A C A C A C A The following frequency sets based on this setup were used. Frequency Set: 7 Setup file default. Used pcal sets: 1 LO sum= 1610.49 1610.49 1610.49 1610.49 1642.49 1642.49 1642.49 1642.49 1674.49 1674.49 1674.49 1674.49 1706.49 1706.49 1706.49 1706.49 BBC fr= 689.51 689.51 689.51 689.51 657.51 657.51 657.51 657.51 625.51 625.51 625.51 625.51 593.51 593.51 593.51 593.51 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S9 S11 S13 S15 PCALXB2= S2 S4 S6 S8 S10 S12 S14 S16 PCALFR1= 490 510 490 510 490 510 490 510 PCALFR2= 490 510 490 510 490 510 490 510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27, 66, 74, 82, 90, 67, 75, 83, 91 barrel=roll_off SOURCE LIST -- Arp 299-A at 1 Gb/s Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * ARP299 11 25 44.174219 * 11 28 33.622010 11 29 13.180406 0.00 58 50 18.17319 * 58 33 46.61000 58 30 09.12380 0.00 From catalog imbedded in main SCHED input file. 3.675 scan hours, 241.114 baseline hours above horizon. * J1128+5925 11 25 23.181652 * 11 28 13.340676 11 28 53.049251 0.00 59 41 46.14397 * 59 25 14.79866 59 21 37.52979 0.00 From catalog imbedded in main SCHED input file. 1.650 scan hours, 92.702 baseline hours above horizon. J0927+3902 09 23 55.319215 * 09 27 03.013936 09 27 46.175061 0.01 0923+392 39 15 23.56644 * 39 02 20.85184 38 59 24.40252 0.01 * 4C39.25 /aps3/sched/catalogs/sources.vlba J0927+39 GSFC Nov. 2009 Solution 2009a 226075 Observations 0.258 scan hours, 16.974 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) ARP299 71.3 J1128+5925 71.1 4C39.25 53.9 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg