  COVER INFORMATION 

 Station:    SHANGHAI  (Code Sh ) 
 Experiment: Arp 299-A at 1 Gb/s
 Exp. Code:  EP075H  


Schedule Version:       1.00
Processed by SCHED version:  10.20  Release of about July 12, 2012

PI:       Miguel A. Perez-Torres

Address:  IAA - CSIC
          Glorieta de la Astronomia s/n
          18008 Granada, Spain
 

Phone:    +34-958230644
EMAIL:    torres@iaa.es
Fax:      +34-958814530
Phone during observation: +34-665252538

Observing mode: 1024 Mbps

Notes:    Phase-ref of Arp 299 with the full EVN
          Third epoch at 3.6 cm with full EVN
 
 

Schedule for SHANGHAI  (Code Sh )                                   Page   2
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

 Next scan frequencies:  8367.49  8367.49  8367.49  8367.49  8399.49  8399.49  8399.49  8399.49
                         8431.49  8431.49  8431.49  8431.49  8463.49  8463.49  8463.49  8463.49
 Next BBC frequencies:    732.51   732.51   732.51   732.51   700.51   700.51   700.51   700.51
                          668.51   668.51   668.51   668.51   636.51   636.51   636.51   636.51
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00

12 00 00  4C39.25      13 16 52  43.2 -63.8  3.8      81.3     0        0   12 00 00
12 03 00  ---          13 19 53  42.7 -63.7  3.9      80.9   180       23   12 00 01

12 03 00  4C39.25      13 19 53  42.7 -63.7  3.9      80.9    -2       23   No stop 
12 05 30  ---          13 22 23  42.2 -63.6  3.9      80.6   148       43   12 03 01

12 09 00  J1128+5925   13 25 54  55.6 -26.2  1.9     132.2   168       43   12 09 00
12 09 40  ---          13 26 34  55.6 -26.3  2.0     132.0    40       48   12 09 01

12 09 40  ARP299       13 26 34  56.2 -27.3  2.0     131.2    -5       48   No stop 
12 12 40  ---          13 29 34  55.9 -27.8  2.0     130.2   175       71   12 09 41

12 12 40  J1128+5925   13 29 34  55.3 -26.7  2.0     131.0    -5       71   No stop 
12 13 45  ---          13 30 39  55.2 -26.9  2.0     130.6    60       79   12 12 41

12 13 45  ARP299       13 30 39  55.8 -28.0  2.0     129.8    -5       79   No stop 
12 16 45  ---          13 33 40  55.4 -28.4  2.1     128.8   175      103   12 13 46

12 17 25  J1128+5925   13 34 20  54.8 -27.4  2.1     129.4    35      103   12 17 25
12 17 55  ---          13 34 50  54.8 -27.5  2.1     129.2    30      106   12 17 26

12 17 55  ARP299       13 34 50  55.3 -28.6  2.1     128.4    -5      106   No stop 
12 20 55  ---          13 37 51  55.0 -29.0  2.1     127.4   175      130   12 17 56

12 20 55  J1128+5925   13 37 51  54.5 -27.9  2.1     128.3    -5      130   No stop 
12 22 00  ---          13 38 56  54.3 -28.0  2.2     127.9    60      138   12 20 56

12 22 00  ARP299       13 38 56  54.9 -29.2  2.2     127.1    -5      138   No stop 
12 25 00  ---          13 41 56  54.6 -29.6  2.2     126.1   175      161   12 22 01

12 25 40  J1128+5925   13 42 36  54.0 -28.5  2.2     126.7    35      161   12 25 40
12 26 10  ---          13 43 07  53.9 -28.6  2.2     126.6    30      165   12 25 41

12 26 10  ARP299       13 43 07  54.5 -29.7  2.2     125.7    -5      165   No stop 
12 29 10  ---          13 46 07  54.1 -30.1  2.3     124.7   175      188   12 26 11

12 29 10  J1128+5925   13 46 07  53.6 -29.0  2.3     125.6    -5      188   No stop 
12 30 15  ---          13 47 12  53.5 -29.1  2.3     125.3    60      197   12 29 11
Schedule for SHANGHAI  (Code Sh )                                   Page   3
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

12 30 15  ARP299       13 47 12  54.0 -30.2  2.3     124.4    -5      197   No stop 
12 33 15  ---          13 50 13  53.7 -30.6  2.3     123.5   175      220   12 30 16

12 33 55  J1128+5925   13 50 53  53.1 -29.5  2.4     124.1    35      220   12 33 55
12 34 25  ---          13 51 23  53.1 -29.6  2.4     124.0    30      224   12 33 56

12 34 25  ARP299       13 51 23  53.6 -30.8  2.4     123.1    -5      224   No stop 
12 37 25  ---          13 54 23  53.2 -31.1  2.4     122.2   175      247   12 34 26

12 37 25  J1128+5925   13 54 23  52.7 -29.9  2.4     123.0    -5      247   No stop 
12 38 30  ---          13 55 29  52.6 -30.1  2.4     122.7    60      255   12 37 26

12 38 30  ARP299       13 55 29  53.1 -31.2  2.4     121.8    -5      255   No stop 
12 41 30  ---          13 58 29  52.8 -31.6  2.5     120.9   175      279   12 38 31

12 42 10  J1128+5925   13 59 09  52.2 -30.5  2.5     121.6    35      279   12 42 10
12 42 40  ---          13 59 39  52.2 -30.5  2.5     121.4    30      283   12 42 11

12 42 40  ARP299       13 59 39  52.7 -31.7  2.5     120.6    -5      283   No stop 
12 45 40  ---          14 02 40  52.3 -32.0  2.6     119.7   175      306   12 42 41

12 45 40  J1128+5925   14 02 40  51.8 -30.9  2.6     120.5    -5      306   No stop 
12 46 45  ---          14 03 45  51.7 -31.0  2.6     120.2    60      314   12 45 41

12 46 45  ARP299       14 03 45  52.2 -32.1  2.6     119.4    -5      314   No stop 
12 49 45  ---          14 06 45  51.8 -32.4  2.6     118.5   175      337   12 46 46

12 50 25  J1128+5925   14 07 25  51.3 -31.3  2.6     119.1    35      337   12 50 25
12 50 55  ---          14 07 56  51.3 -31.4  2.6     119.0    30      341   12 50 26

12 50 55  ARP299       14 07 56  51.7 -32.6  2.6     118.1    -5      341   No stop 
12 53 55  ---          14 10 56  51.4 -32.9  2.7     117.3   175      364   12 50 56

12 53 55  J1128+5925   14 10 56  50.9 -31.7  2.7     118.1    -5      364   No stop 
12 55 00  ---          14 12 01  50.8 -31.8  2.7     117.8    60      373   12 53 56

12 55 00  ARP299       14 12 01  51.2 -33.0  2.7     116.9    -5      373   No stop 
12 58 00  ---          14 15 02  50.9 -33.2  2.8     116.1   175      396   12 55 01

12 58 40  J1128+5925   14 15 42  50.4 -32.1  2.8     116.7    35      396   12 58 40
12 59 10  ---          14 16 12  50.3 -32.2  2.8     116.6    30      400   12 58 41

12 59 10  ARP299       14 16 12  50.7 -33.3  2.8     115.8    -5      400   No stop 
13 02 10  ---          14 19 12  50.4 -33.6  2.8     114.9   175      423   12 59 11
Schedule for SHANGHAI  (Code Sh )                                   Page   4
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

13 02 10  J1128+5925   14 19 12  50.0 -32.4  2.8     115.7    -5      423   No stop 
13 03 15  ---          14 20 18  49.9 -32.5  2.9     115.4    60      432   13 02 11

13 03 15  ARP299       14 20 18  50.3 -33.7  2.8     114.6    -5      432   No stop 
13 06 15  ---          14 23 18  49.9 -34.0  2.9     113.8   175      455   13 03 16

13 06 55  J1128+5925   14 23 58  49.4 -32.8  2.9     114.4    35      455   13 06 55
13 07 25  ---          14 24 28  49.4 -32.9  2.9     114.3    30      459   13 06 56

13 07 25  ARP299       14 24 28  49.8 -34.1  2.9     113.5    -5      459   No stop 
13 10 25  ---          14 27 29  49.4 -34.3  3.0     112.6   175      482   13 07 26

13 10 25  J1128+5925   14 27 29  49.0 -33.1  3.0     113.5    -5      482   No stop 
13 11 30  ---          14 28 34  48.9 -33.2  3.0     113.2    60      490   13 10 26

13 11 30  ARP299       14 28 34  49.3 -34.4  3.0     112.3    -5      490   No stop 
13 14 30  ---          14 31 34  48.9 -34.6  3.0     111.5   175      514   13 11 31

13 15 10  J1128+5925   14 32 15  48.5 -33.5  3.1     112.2    35      514   13 15 10
13 15 40  ---          14 32 45  48.4 -33.5  3.1     112.0    30      517   13 15 11

13 15 40  ARP299       14 32 45  48.8 -34.7  3.1     111.2    -5      517   No stop 
13 18 40  ---          14 35 45  48.4 -34.9  3.1     110.4   175      541   13 15 41

13 18 40  J1128+5925   14 35 45  48.1 -33.7  3.1     111.2    -5      541   No stop 
13 19 45  ---          14 36 50  47.9 -33.8  3.1     110.9    60      549   13 18 41

13 19 45  ARP299       14 36 50  48.3 -35.0  3.1     110.1    -5      549   No stop 
13 22 45  ---          14 39 51  47.9 -35.2  3.2     109.3   175      572   13 19 46

13 23 25  J1128+5925   14 40 31  47.5 -34.0  3.2     110.0    35      572   13 23 25
13 23 55  ---          14 41 01  47.4 -34.1  3.2     109.8    30      576   13 23 26

13 23 55  ARP299       14 41 01  47.8 -35.2  3.2     109.0    -5      576   No stop 
13 26 55  ---          14 44 01  47.4 -35.4  3.2     108.3   175      599   13 23 56

13 26 55  J1128+5925   14 44 01  47.1 -34.2  3.3     109.0    -5      599   No stop 
13 28 00  ---          14 45 07  46.9 -34.3  3.3     108.8    60      608   13 26 56

13 28 00  ARP299       14 45 07  47.2 -35.5  3.3     108.0    -5      608   No stop 
13 31 00  ---          14 48 07  46.9 -35.7  3.3     107.2   175      631   13 28 01

13 31 40  J1128+5925   14 48 47  46.5 -34.5  3.3     107.8    35      631   13 31 40
13 32 10  ---          14 49 17  46.4 -34.6  3.3     107.7    30      635   13 31 41
Schedule for SHANGHAI  (Code Sh )                                   Page   5
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

13 32 10  ARP299       14 49 17  46.7 -35.7  3.3     106.9    -5      635   No stop 
13 35 10  ---          14 52 18  46.3 -35.9  3.4     106.1   175      658   13 32 11

13 35 10  J1128+5925   14 52 18  46.1 -34.7  3.4     106.9    -5      658   No stop 
13 36 15  ---          14 53 23  45.9 -34.8  3.4     106.6    60      666   13 35 11

13 36 15  ARP299       14 53 23  46.2 -35.9  3.4     105.9    -5      666   No stop 
13 39 15  ---          14 56 24  45.8 -36.1  3.5     105.1   175      690   13 36 16

13 39 55  J1128+5925   14 57 04  45.5 -35.0  3.5     105.7    35      690   13 39 55
13 40 25  ---          14 57 34  45.4 -35.0  3.5     105.6    30      694   13 39 56

13 40 25  ARP299       14 57 34  45.7 -36.2  3.5     104.8    -5      694   No stop 
13 43 25  ---          15 00 34  45.3 -36.3  3.5     104.1   175      717   13 40 26

13 43 25  J1128+5925   15 00 34  45.0 -35.1  3.5     104.8    -5      717   No stop 
13 44 30  ---          15 01 39  44.9 -35.2  3.5     104.6    60      725   13 43 26

13 44 30  ARP299       15 01 39  45.2 -36.3  3.5     103.8    -5      725   No stop 
13 47 30  ---          15 04 40  44.8 -36.5  3.6     103.1   175      748   13 44 31

13 48 10  J1128+5925   15 05 20  44.5 -35.3  3.6     103.7    35      748   13 48 10
13 48 40  ---          15 05 50  44.4 -35.4  3.6     103.6    30      752   13 48 11

13 48 40  ARP299       15 05 50  44.6 -36.5  3.6     102.8    -5      752   No stop 
13 51 40  ---          15 08 51  44.3 -36.6  3.7     102.1   175      775   13 48 41

13 51 40  J1128+5925   15 08 51  44.0 -35.5  3.7     102.8    -5      775   No stop 
13 52 45  ---          15 09 56  43.9 -35.5  3.7     102.6    60      784   13 51 41

13 52 45  ARP299       15 09 56  44.1 -36.7  3.7     101.8    -5      784   No stop 
13 55 45  ---          15 12 56  43.7 -36.8  3.7     101.1   175      807   13 52 46

13 56 25  J1128+5925   15 13 36  43.4 -35.7  3.7     101.7    35      807   13 56 25
13 56 55  ---          15 14 06  43.4 -35.7  3.8     101.6    30      811   13 56 26

13 56 55  ARP299       15 14 06  43.6 -36.8  3.7     100.8    -5      811   No stop 
13 59 55  ---          15 17 07  43.2 -36.9  3.8     100.1   175      834   13 56 56

13 59 55  J1128+5925   15 17 07  43.0 -35.8  3.8     100.8    -5      834   No stop 
14 01 00  ---          15 18 12  42.9 -35.8  3.8     100.6    60      843   13 59 56

14 01 00  ARP299       15 18 12  43.1 -37.0  3.8      99.9    -5      843   No stop 
14 04 00  ---          15 21 13  42.7 -37.1  3.9      99.2   175      866   14 01 01
Schedule for SHANGHAI  (Code Sh )                                   Page   6
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

14 04 40  J1128+5925   15 21 53  42.4 -35.9  3.9      99.7    35      866   14 04 40
14 05 10  ---          15 22 23  42.3 -35.9  3.9      99.6    30      870   14 04 41

14 05 10  ARP299       15 22 23  42.5 -37.1  3.9      98.9    -5      870   No stop 
14 08 10  ---          15 25 23  42.1 -37.2  3.9      98.2   175      893   14 05 11

14 08 10  J1128+5925   15 25 23  42.0 -36.0  3.9      98.9    -5      893   No stop 
14 09 15  ---          15 26 28  41.8 -36.1  4.0      98.6    60      901   14 08 11

14 09 15  ARP299       15 26 28  42.0 -37.2  4.0      98.0    -5      901   No stop 
14 12 15  ---          15 29 29  41.6 -37.3  4.0      97.3   175      924   14 09 16

14 12 55  J1128+5925   15 30 09  41.4 -36.1  4.0      97.8    35      924   14 12 55
14 13 25  ---          15 30 39  41.3 -36.2  4.0      97.7    30      928   14 12 56

14 13 25  ARP299       15 30 39  41.4 -37.3  4.0      97.0    -5      928   No stop 
14 16 25  ---          15 33 40  41.1 -37.3  4.1      96.3   175      952   14 13 26

14 16 25  J1128+5925   15 33 40  40.9 -36.2  4.1      97.0    -5      952   No stop 
14 17 30  ---          15 34 45  40.8 -36.2  4.1      96.7    60      960   14 16 26

14 17 30  ARP299       15 34 45  40.9 -37.4  4.1      96.1    -5      960   No stop 
14 20 30  ---          15 37 45  40.5 -37.4  4.1      95.4   175      983   14 17 31

14 21 10  J1128+5925   15 38 25  40.3 -36.3  4.2      95.9    35      983   14 21 10
14 21 40  ---          15 38 55  40.2 -36.3  4.2      95.8    30      987   14 21 11

14 21 40  ARP299       15 38 55  40.4 -37.4  4.2      95.1    -5      987   No stop 
14 24 40  ---          15 41 56  40.0 -37.5  4.2      94.5   175     1010   14 21 41

14 24 40  J1128+5925   15 41 56  39.9 -36.4  4.2      95.1    -5     1010   No stop 
14 25 45  ---          15 43 01  39.7 -36.4  4.2      94.9    60     1019   14 24 41

14 25 45  ARP299       15 43 01  39.8 -37.5  4.2      94.2    -5     1019   No stop 
14 28 45  ---          15 46 02  39.4 -37.5  4.3      93.6   175     1042   14 25 46

14 29 25  J1128+5925   15 46 42  39.3 -36.4  4.3      94.0    35     1042   14 29 25
14 29 55  ---          15 47 12  39.2 -36.4  4.3      93.9    30     1046   14 29 26

14 29 55  ARP299       15 47 12  39.3 -37.5  4.3      93.3    -5     1046   No stop 
14 32 55  ---          15 50 12  38.9 -37.6  4.3      92.7   175     1069   14 29 56

14 32 55  J1128+5925   15 50 12  38.8 -36.5  4.4      93.3    -5     1069   No stop 
14 34 00  ---          15 51 18  38.7 -36.5  4.4      93.0    60     1077   14 32 56
Schedule for SHANGHAI  (Code Sh )                                   Page   7
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

14 34 00  ARP299       15 51 18  38.8 -37.6  4.4      92.4    -5     1077   No stop 
14 37 00  ---          15 54 18  38.4 -37.6  4.4      91.8   175     1101   14 34 01

14 37 40  J1128+5925   15 54 58  38.2 -36.5  4.4      92.2    35     1101   14 37 40
14 38 10  ---          15 55 28  38.1 -36.5  4.4      92.1    30     1104   14 37 41

14 38 10  ARP299       15 55 28  38.2 -37.6  4.4      91.5    -5     1104   No stop 
14 41 10  ---          15 58 29  37.8 -37.6  4.5      90.9   175     1128   14 38 11

14 41 10  J1128+5925   15 58 29  37.8 -36.5  4.5      91.5    -5     1128   No stop 
14 42 15  ---          15 59 34  37.6 -36.5  4.5      91.2    60     1136   14 41 11

14 42 15  ARP299       15 59 34  37.7 -37.6  4.5      90.6    -5     1136   No stop 
14 45 15  ---          16 02 34  37.3 -37.6  4.6      90.0   175     1159   14 42 16

14 45 55  J1128+5925   16 03 14  37.1 -36.5  4.6      90.4    35     1159   14 45 55
14 46 25  ---          16 03 45  37.1 -36.5  4.6      90.3    30     1163   14 45 56

14 46 25  ARP299       16 03 45  37.1 -37.6  4.6      89.7    -5     1163   No stop 
14 49 25  ---          16 06 45  36.7 -37.6  4.6      89.1   175     1186   14 46 26

14 49 25  J1128+5925   16 06 45  36.7 -36.5  4.6      89.7    -5     1186   No stop 
14 50 30  ---          16 07 50  36.6 -36.5  4.6      89.4    60     1195   14 49 26

14 50 30  ARP299       16 07 50  36.6 -37.6  4.6      88.9    -5     1195   No stop 
14 53 30  ---          16 10 51  36.2 -37.6  4.7      88.2   175     1218   14 50 31

14 54 10  J1128+5925   16 11 31  36.1 -36.5  4.7      88.7    35     1218   14 54 10
14 54 40  ---          16 12 01  36.0 -36.5  4.7      88.5    30     1222   14 54 11

14 54 40  ARP299       16 12 01  36.0 -37.6  4.7      88.0    -5     1222   No stop 
14 57 40  ---          16 15 01  35.7 -37.6  4.8      87.4   175     1245   14 54 41

14 57 40  J1128+5925   16 15 01  35.6 -36.5  4.8      87.9    -5     1245   No stop 
14 58 45  ---          16 16 07  35.5 -36.5  4.8      87.7    60     1253   14 57 41

14 58 45  ARP299       16 16 07  35.5 -37.6  4.8      87.1    -5     1253   No stop 
15 01 45  ---          16 19 07  35.1 -37.5  4.8      86.5   175     1277   14 58 46

15 02 25  J1128+5925   16 19 47  35.0 -36.5  4.8      86.9    35     1277   15 02 25
15 02 55  ---          16 20 17  35.0 -36.5  4.9      86.8    30     1281   15 02 26

15 02 55  ARP299       16 20 17  35.0 -37.5  4.8      86.3    -5     1281   No stop 
15 05 55  ---          16 23 18  34.6 -37.5  4.9      85.6   175     1304   15 02 56
Schedule for SHANGHAI  (Code Sh )                                   Page   8
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

15 05 55  J1128+5925   16 23 18  34.6 -36.4  4.9      86.2    -5     1304   No stop 
15 07 00  ---          16 24 23  34.5 -36.4  4.9      85.9    60     1312   15 05 56

15 07 00  ARP299       16 24 23  34.4 -37.5  4.9      85.4    -5     1312   No stop 
15 10 00  ---          16 27 23  34.0 -37.4  5.0      84.8   175     1335   15 07 01

15 10 40  J1128+5925   16 28 04  34.0 -36.4  5.0      85.2    35     1335   15 10 40
15 11 10  ---          16 28 34  33.9 -36.4  5.0      85.1    30     1339   15 10 41

15 11 10  ARP299       16 28 34  33.9 -37.4  5.0      84.6    -5     1339   No stop 
15 14 10  ---          16 31 34  33.5 -37.4  5.0      83.9   175     1362   15 11 11

15 14 10  J1128+5925   16 31 34  33.5 -36.3  5.0      84.4    -5     1362   No stop 
15 15 15  ---          16 32 39  33.4 -36.3  5.1      84.2    60     1371   15 14 11

15 15 15  ARP299       16 32 39  33.4 -37.4  5.1      83.7    -5     1371   No stop 
15 18 15  ---          16 35 40  33.0 -37.3  5.1      83.1   175     1394   15 15 16

15 18 55  J1128+5925   16 36 20  32.9 -36.3  5.1      83.5    35     1394   15 18 55
15 19 25  ---          16 36 50  32.9 -36.3  5.1      83.4    30     1398   15 18 56

15 19 25  ARP299       16 36 50  32.8 -37.3  5.1      82.9    -5     1398   No stop 
15 22 25  ---          16 39 50  32.4 -37.2  5.2      82.3   175     1421   15 19 26

15 22 25  J1128+5925   16 39 50  32.5 -36.2  5.2      82.7    -5     1421   No stop 
15 23 30  ---          16 40 56  32.4 -36.2  5.2      82.5    60     1430   15 22 26

15 23 30  ARP299       16 40 56  32.3 -37.2  5.2      82.0    -5     1430   No stop 
15 26 30  ---          16 43 56  31.9 -37.1  5.2      81.4   175     1453   15 23 31

15 27 10  J1128+5925   16 44 36  31.9 -36.1  5.3      81.8    35     1453   15 27 10
15 27 40  ---          16 45 06  31.8 -36.1  5.3      81.7    30     1457   15 27 11

15 27 40  ARP299       16 45 06  31.7 -37.1  5.3      81.2    -5     1457   No stop 
15 30 40  ---          16 48 07  31.4 -37.0  5.3      80.6   175     1480   15 27 41

15 30 40  J1128+5925   16 48 07  31.5 -36.0  5.3      81.1    -5     1480   No stop 
15 31 45  ---          16 49 12  31.3 -36.0  5.3      80.8    60     1488   15 30 41

15 31 45  ARP299       16 49 12  31.2 -37.0  5.3      80.4    -5     1488   No stop 
15 34 45  ---          16 52 12  30.8 -36.9  5.4      79.8   175     1512   15 31 46

15 35 25  J1128+5925   16 52 53  30.9 -35.9  5.4      80.1    35     1512   15 35 25
15 35 55  ---          16 53 23  30.8 -35.9  5.4      80.0    30     1515   15 35 26
Schedule for SHANGHAI  (Code Sh )                                   Page   9
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

15 35 55  ARP299       16 53 23  30.7 -36.9  5.4      79.6    -5     1515   No stop 
15 38 55  ---          16 56 23  30.3 -36.8  5.5      79.0   175     1539   15 35 56

15 38 55  J1128+5925   16 56 23  30.4 -35.8  5.5      79.4    -5     1539   No stop 
15 40 00  ---          16 57 28  30.3 -35.8  5.5      79.2    60     1547   15 38 56

15 40 00  ARP299       16 57 28  30.2 -36.8  5.5      78.7    -5     1547   No stop 
15 43 00  ---          17 00 29  29.8 -36.7  5.5      78.1   175     1570   15 40 01

15 43 40  J1128+5925   17 01 09  29.8 -35.7  5.5      78.4    35     1570   15 43 40
15 44 10  ---          17 01 39  29.8 -35.7  5.5      78.3    30     1574   15 43 41

15 44 10  ARP299       17 01 39  29.6 -36.6  5.5      77.9    -5     1574   No stop 
15 47 10  ---          17 04 40  29.2 -36.5  5.6      77.3   175     1597   15 44 11

15 47 10  J1128+5925   17 04 40  29.4 -35.6  5.6      77.7    -5     1597   No stop 
15 48 15  ---          17 05 45  29.2 -35.5  5.6      77.5    60     1606   15 47 11

15 48 15  ARP299       17 05 45  29.1 -36.5  5.6      77.1    -5     1606   No stop 
15 51 15  ---          17 08 45  28.7 -36.4  5.7      76.5   175     1629   15 48 16

15 51 55  J1128+5925   17 09 25  28.8 -35.4  5.7      76.8    35     1629   15 51 55
15 52 25  ---          17 09 55  28.7 -35.4  5.7      76.7    30     1633   15 51 56

15 52 25  ARP299       17 09 55  28.6 -36.4  5.7      76.3    -5     1633   No stop 
15 55 25  ---          17 12 56  28.2 -36.3  5.7      75.7   175     1656   15 52 26

15 55 25  J1128+5925   17 12 56  28.4 -35.3  5.7      76.1    -5     1656   No stop 
15 56 30  ---          17 14 01  28.2 -35.3  5.8      75.9    60     1664   15 55 26

15 56 30  ARP299       17 14 01  28.0 -36.2  5.7      75.5    -5     1664   No stop 
15 59 30  ---          17 17 02  27.7 -36.1  5.8      74.9   175     1688   15 56 31

16 00 10  J1128+5925   17 17 42  27.8 -35.1  5.8      75.1    35     1688   16 00 10
16 00 40  ---          17 18 12  27.7 -35.1  5.8      75.0    30     1692   16 00 11

16 00 40  ARP299       17 18 12  27.5 -36.1  5.8      74.7    -5     1692   No stop 
16 03 40  ---          17 21 12  27.1 -35.9  5.9      74.1   175     1715   16 00 41

16 03 40  J1128+5925   17 21 12  27.3 -35.0  5.9      74.4    -5     1715   No stop 
16 04 45  ---          17 22 17  27.2 -35.0  5.9      74.2    60     1723   16 03 41

16 04 45  ARP299       17 22 17  27.0 -35.9  5.9      73.9    -5     1723   No stop 
16 07 45  ---          17 25 18  26.6 -35.8  5.9      73.3   175     1746   16 04 46
Schedule for SHANGHAI  (Code Sh )                                   Page  10
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

16 08 25  J1128+5925   17 25 58  26.8 -34.8  5.9      73.5    35     1746   16 08 25
16 08 55  ---          17 26 28  26.7 -34.8  6.0      73.4    30     1750   16 08 26

16 08 55  ARP299       17 26 28  26.5 -35.7  6.0      73.1    -5     1750   No stop 
16 11 55  ---          17 29 29  26.1 -35.6  6.0      72.5   175     1773   16 08 56

16 11 55  J1128+5925   17 29 29  26.3 -34.7  6.0      72.8    -5     1773   No stop 
16 13 00  ---          17 30 34  26.2 -34.6  6.0      72.6    60     1782   16 11 56

16 13 00  ARP299       17 30 34  26.0 -35.5  6.0      72.3    -5     1782   No stop 
16 16 00  ---          17 33 34  25.6 -35.4  6.1      71.7   175     1805   16 13 01

16 16 40  J1128+5925   17 34 14  25.7 -34.5  6.1      71.9    35     1805   16 16 40
16 17 10  ---          17 34 44  25.7 -34.4  6.1      71.8    30     1809   16 16 41

16 17 10  ARP299       17 34 44  25.5 -35.4  6.1      71.5    -5     1809   No stop 
16 20 10  ---          17 37 45  25.1 -35.2  6.1      70.9   175     1832   16 17 11

16 20 10  J1128+5925   17 37 45  25.3 -34.3  6.1      71.2    -5     1832   No stop 
16 21 15  ---          17 38 50  25.2 -34.3  6.2      71.0    60     1841   16 20 11

16 21 15  ARP299       17 38 50  24.9 -35.2  6.2      70.7    -5     1841   No stop 
16 24 15  ---          17 41 51  24.6 -35.0  6.2      70.1   175     1864   16 21 16

16 24 55  J1128+5925   17 42 31  24.7 -34.1  6.2      70.3    35     1864   16 24 55
16 25 25  ---          17 43 01  24.7 -34.1  6.2      70.2    30     1868   16 24 56

16 25 25  ARP299       17 43 01  24.4 -35.0  6.2      69.9    -5     1868   No stop 
16 28 25  ---          17 46 01  24.1 -34.8  6.3      69.3   175     1891   16 25 26

16 28 25  J1128+5925   17 46 01  24.3 -33.9  6.3      69.6    -5     1891   No stop 
16 29 30  ---          17 47 06  24.2 -33.9  6.3      69.4    60     1899   16 28 26

16 29 30  ARP299       17 47 06  23.9 -34.8  6.3      69.1    -5     1899   No stop 
16 32 30  ---          17 50 07  23.6 -34.6  6.3      68.5   175     1922   16 29 31

16 33 10  J1128+5925   17 50 47  23.8 -33.7  6.4      68.6    35     1922   16 33 10
16 33 40  ---          17 51 17  23.7 -33.6  6.4      68.5    30     1926   16 33 11

16 33 40  ARP299       17 51 17  23.4 -34.5  6.4      68.3    -5     1926   No stop 
16 36 40  ---          17 54 18  23.1 -34.4  6.4      67.7   175     1950   16 33 41

16 36 40  J1128+5925   17 54 18  23.3 -33.5  6.4      68.0    -5     1950   No stop 
16 37 45  ---          17 55 23  23.2 -33.4  6.4      67.8    60     1958   16 36 41
Schedule for SHANGHAI  (Code Sh )                                   Page  11
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

16 37 45  ARP299       17 55 23  22.9 -34.3  6.4      67.5    -5     1958   No stop 
16 40 45  ---          17 58 23  22.6 -34.2  6.5      66.9   175     1981   16 37 46

16 41 25  J1128+5925   17 59 03  22.8 -33.2  6.5      67.0    35     1981   16 41 25
16 41 55  ---          17 59 34  22.7 -33.2  6.5      66.9    30     1985   16 41 26

16 41 55  ARP299       17 59 34  22.4 -34.1  6.5      66.7    -5     1985   No stop 
16 44 55  ---          18 02 34  22.1 -33.9  6.6      66.1   175     2008   16 41 56

16 44 55  J1128+5925   18 02 34  22.4 -33.1  6.6      66.4    -5     2008   No stop 
16 46 00  ---          18 03 39  22.2 -33.0  6.6      66.1    60     2017   16 44 56

16 46 00  ARP299       18 03 39  21.9 -33.9  6.6      65.9    -5     2017   No stop 
16 49 00  ---          18 06 40  21.6 -33.7  6.6      65.3   175     2040   16 46 01

16 49 40  J1128+5925   18 07 20  21.8 -32.8  6.6      65.4    35     2040   16 49 40
16 50 10  ---          18 07 50  21.8 -32.8  6.6      65.3    30     2044   16 49 41

16 50 10  ARP299       18 07 50  21.4 -33.6  6.6      65.1    -5     2044   No stop 
16 53 10  ---          18 10 50  21.1 -33.4  6.7      64.5   175     2067   16 50 11

16 53 10  J1128+5925   18 10 50  21.4 -32.6  6.7      64.8    -5     2067   No stop 
16 54 15  ---          18 11 56  21.3 -32.5  6.7      64.5    60     2075   16 53 11

16 54 15  ARP299       18 11 56  21.0 -33.4  6.7      64.3    -5     2075   No stop 
16 57 15  ---          18 14 56  20.6 -33.2  6.8      63.7   175     2099   16 54 16

16 57 55  J1128+5925   18 15 36  20.9 -32.3  6.8      63.8    35     2099   16 57 55
16 58 25  ---          18 16 06  20.8 -32.3  6.8      63.7    30     2102   16 57 56

16 58 25  ARP299       18 16 06  20.5 -33.1  6.8      63.5    -5     2102   No stop 
17 01 25  ---          18 19 07  20.1 -32.9  6.8      62.9   175     2126   16 58 26

17 01 25  J1128+5925   18 19 07  20.5 -32.1  6.8      63.1    -5     2126   No stop 
17 02 30  ---          18 20 12  20.3 -32.0  6.9      62.9    60     2134   17 01 26

17 02 30  ARP299       18 20 12  20.0 -32.9  6.8      62.7    -5     2134   No stop 
17 05 30  ---          18 23 12  19.6 -32.7  6.9      62.1   175     2157   17 02 31

17 06 10  J1128+5925   18 23 53  19.9 -31.8  6.9      62.2    35     2157   17 06 10
17 06 40  ---          18 24 23  19.9 -31.8  6.9      62.1    30     2161   17 06 11

17 06 40  ARP299       18 24 23  19.5 -32.6  6.9      61.9    -5     2161   No stop 
17 09 40  ---          18 27 23  19.2 -32.4  7.0      61.3   175     2184   17 06 41
Schedule for SHANGHAI  (Code Sh )                                   Page  12
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

17 09 40  J1128+5925   18 27 23  19.5 -31.6  7.0      61.5    -5     2184   No stop 
17 10 45  ---          18 28 28  19.4 -31.5  7.0      61.3    60     2193   17 09 41

17 10 45  ARP299       18 28 28  19.0 -32.3  7.0      61.1    -5     2193   No stop 
17 13 45  ---          18 31 29  18.7 -32.1  7.0      60.6   175     2216   17 10 46

17 14 25  J1128+5925   18 32 09  19.0 -31.3  7.1      60.6    35     2216   17 14 25
17 14 55  ---          18 32 39  18.9 -31.2  7.1      60.5    30     2220   17 14 26

17 14 55  ARP299       18 32 39  18.6 -32.0  7.1      60.3    -5     2220   No stop 
17 17 55  ---          18 35 39  18.2 -31.8  7.1      59.8   175     2243   17 14 56

17 17 55  J1128+5925   18 35 39  18.6 -31.0  7.1      59.9    -5     2243   No stop 
17 19 00  ---          18 36 45  18.5 -30.9  7.1      59.7    60     2251   17 17 56

17 19 00  ARP299       18 36 45  18.1 -31.7  7.1      59.6    -5     2251   No stop 
17 22 00  ---          18 39 45  17.8 -31.5  7.2      59.0   175     2275   17 19 01

17 22 40  J1128+5925   18 40 25  18.1 -30.7  7.2      59.0    35     2275   17 22 40
17 23 10  ---          18 40 55  18.0 -30.7  7.2      58.9    30     2279   17 22 41

17 23 10  ARP299       18 40 55  17.6 -31.5  7.2      58.8    -5     2279   No stop 
17 26 10  ---          18 43 56  17.3 -31.2  7.2      58.2   175     2302   17 23 11

17 26 10  J1128+5925   18 43 56  17.7 -30.5  7.2      58.3    -5     2302   No stop 
17 27 15  ---          18 45 01  17.6 -30.4  7.3      58.1    60     2310   17 26 11

17 27 15  ARP299       18 45 01  17.2 -31.2  7.3      58.0    -5     2310   No stop 
17 30 15  ---          18 48 01  16.8 -30.9  7.3      57.4   175     2333   17 27 16

17 30 55  J1128+5925   18 48 42  17.2 -30.1  7.3      57.4    35     2333   17 30 55
17 31 25  ---          18 49 12  17.1 -30.1  7.3      57.3    30     2337   17 30 56

17 31 25  ARP299       18 49 12  16.7 -30.9  7.3      57.2    -4     2337   No stop 
17 34 25  ---          18 52 12  16.4 -30.6  7.4      56.6   176     2360   17 31 26

17 34 25  J1128+5925   18 52 12  16.8 -29.9  7.4      56.7    -4     2360   No stop 
17 35 30  ---          18 53 17  16.7 -29.8  7.4      56.5    61     2369   17 34 26

17 35 30  ARP299       18 53 17  16.3 -30.5  7.4      56.4    -5     2369   No stop 
17 38 30  ---          18 56 18  15.9 -30.3  7.4      55.8   175     2392   17 35 31

17 39 10  J1128+5925   18 56 58  16.3 -29.5  7.5      55.8    35     2392   17 39 10
17 39 40  ---          18 57 28  16.3 -29.5  7.5      55.7    30     2396   17 39 11
Schedule for SHANGHAI  (Code Sh )                                   Page  13
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Sun   9 Jun 2013   Day 160 ---

17 39 40  ARP299       18 57 28  15.8 -30.2  7.5      55.6    -5     2396   No stop 
17 42 40  ---          19 00 29  15.5 -30.0  7.5      55.0   175     2419   17 39 41

17 42 40  J1128+5925   19 00 29  15.9 -29.2  7.5      55.1    -5     2419   No stop 
17 43 45  ---          19 01 34  15.8 -29.2  7.5      54.9    60     2428   17 42 41

17 43 45  ARP299       19 01 34  15.4 -29.9  7.5      54.8    -5     2428   No stop 
17 46 45  ---          19 04 34  15.1 -29.7  7.6      54.2   175     2451   17 43 46

17 47 25  J1128+5925   19 05 14  15.4 -28.9  7.6      54.2    35     2451   17 47 25
17 47 55  ---          19 05 44  15.4 -28.8  7.6      54.1    30     2455   17 47 26

17 47 55  ARP299       19 05 44  14.9 -29.6  7.6      54.0    -5     2455   No stop 
17 50 55  ---          19 08 45  14.6 -29.3  7.7      53.4   175     2478   17 47 56

17 50 55  J1128+5925   19 08 45  15.1 -28.6  7.7      53.5    -5     2478   No stop 
17 52 00  ---          19 09 50  15.0 -28.5  7.7      53.3    60     2486   17 50 56

17 52 00  ARP299       19 09 50  14.5 -29.3  7.7      53.2    -5     2486   No stop 
17 55 00  ---          19 12 51  14.2 -29.0  7.7      52.6   175     2510   17 52 01

17 55 40  J1128+5925   19 13 31  14.6 -28.2  7.7      52.6    35     2510   17 55 40
17 56 10  ---          19 14 01  14.6 -28.2  7.8      52.5    30     2513   17 55 41

17 56 10  ARP299       19 14 01  14.1 -28.9  7.7      52.4    -5     2513   No stop 
17 59 10  ---          19 17 01  13.8 -28.7  7.8      51.8   175     2537   17 56 11

17 59 10  J1128+5925   19 17 01  14.2 -27.9  7.8      51.9    -5     2537   No stop 
18 00 00  ---          19 17 51  14.2 -27.9  7.8      51.8    45     2543   17 59 11


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 ======== Setup file: sess213.X1024
   Matching groups in /Users/torres/sched102/catalogs/freq.dat:
     shxd            From An Tao 18May2006. Dummy dual pol - only RCP available

   Setup group:    8         Station: SHANGHAI          Total bit rate: 1024
   Format: MARK5B            Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type:                  Speedup factor:   1.00

   Disk used to record data.

   1st LO=   9100.00   9100.00   9100.00   9100.00   9100.00   9100.00   9100.00   9100.00
             9100.00   9100.00   9100.00   9100.00   9100.00   9100.00   9100.00   9100.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         1         2         1         2         3         4         3         4
                   5         6         5         6         7         8         7         8
   BBC SB=         U         U         L         L         U         U         L         L
                   U         U         L         L         U         U         L         L
   IF    =        A         C         A         C         A         C         A         C 
                  A         C         A         C         A         C         A         C 

  The following frequency sets based on these setups were used.

   Frequency Set:  11  Setup file default.  Used pcal sets:   1
   LO sum=   8367.49  8367.49  8367.49  8367.49  8399.49  8399.49  8399.49  8399.49
             8431.49  8431.49  8431.49  8431.49  8463.49  8463.49  8463.49  8463.49
   BBC fr=    732.51   732.51   732.51   732.51   700.51   700.51   700.51   700.51
              668.51   668.51   668.51   668.51   636.51   636.51   636.51   636.51
   Bandwd=     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
               16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
    Matching frequency sets:  11

  The following pulse cal sets were used with this setup:

   Pulse cal detection set:   1  PCAL = 1MHZ
    PCALXB1=   S1    S3    S5    S7    S9    S11   S13   S15
    PCALXB2=   S2    S4    S6    S8    S10   S12   S14   S16
    PCALFR1=   490   510   490   510   490   510   490   510
    PCALFR2=   490   510   490   510   490   510   490   510

   Track assignments are: 
    track1=   2,  4,  6,  8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30, 32
    barrel=roll_off 
 SOURCES USED IN RECORDING SCANS --                         Arp 299-A at 1 Gb/s
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * ARP299            11 25 44.174219   * 11 28 33.622010     11 29 19.075376       0.00
                     58 50 18.17319    * 58 33 46.61000      58 29 30.40041        0.00
                     From catalog imbedded in main SCHED input file.
                        4.250 scan and    188.026 baseline hours in setup: sess213.X1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7 10 11

 * J1128+5925        11 25 23.181652   * 11 28 13.340676     11 28 58.951263       0.00
                     59 41 46.14397    * 59 25 14.79866      59 20 58.81084        0.00
                     From catalog imbedded in main SCHED input file.
                        1.133 scan and     45.539 baseline hours in setup: sess213.X1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7 10 11

   J0927+3902        09 23 55.319217   * 09 27 03.013938     09 27 53.110083       0.13
   0923+392          39 15 23.56637    * 39 02 20.85177      38 58 50.88623        0.10
 * 4C39.25           /Users/torres/sched102/catalogs/sources.vlba
   J0927+39          rfc_2012b Petrov, 2012, unpublished 239566 observations
                        0.092 scan and      4.920 baseline hours in setup: sess213.X1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7 10 11



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   ARP299              72.8
   J1128+5925          72.5
   4C39.25             56.0

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 