COVER INFORMATION Station: IRBENE (Code Ir ) Experiment: A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel Exp. Code: EM117H Schedule Version: 1.00 Processed by SCHED version: 11.40 Release 11.4. March 14, 2015 PI: L. Moscadelli Address: Osservatorio Astrofisico di Arcetri Via E.Fermi 5 I-50125, Firenze Italy Phone: +39 055 2752220 EMAIL: mosca@arcetri.astro.it Fax: +39 055 220039 Phone during observation: +39 055 2752220 Observing mode: Polarization observations of 1 source at 6.7 GHz (128 Mb/s Notes: phase-cal OFF source = G45.07+0.13 Schedule for IRBENE (Code Ir ) Page 2 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Tue 7 Jun 2016 Day 159 --- Next scan frequencies: 6664.94 6664.94 6664.94 6664.94 6668.94 6668.94 6668.94 6668.94 6672.94 6672.94 6672.94 6672.94 6676.94 6676.94 6676.94 6676.94 Next BBC frequencies: 564.94 564.94 564.94 564.94 568.94 568.94 568.94 568.94 572.94 572.94 572.94 572.94 576.94 576.94 576.94 576.94 Next scan bandwidths: 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 20 00 00 J2202+4216 14 34 00 24.7-311.2 -7.5 -33.1 0 0 20 00 00 20 08 00 =VR422201 14 42 01 25.5-309.9 -7.4 -33.9 480 8 20 00 01 20 15 35 J1331+3030 14 49 37 59.7-145.3 1.3 20.7 371 8 20 15 35 20 20 35 =3C286 14 54 38 59.3-143.3 1.4 21.8 300 12 20 15 36 20 21 05 J1331+3030 14 55 08 59.3-143.1 1.4 21.9 27 12 20 21 05 20 29 05 =3C286 15 03 10 58.6-140.0 1.5 23.6 480 20 20 21 06 20 33 40 3C345 15 07 45 66.5-231.4 -1.6 -33.0 226 20 20 33 40 20 43 40 --- 15 17 47 67.5-227.2 -1.4 -30.8 600 30 20 33 41 20 48 20 J2202+4216 15 22 28 29.9-303.0 -6.7 -37.5 239 30 20 48 20 20 56 20 =VR422201 15 30 29 30.8-301.6 -6.5 -38.2 480 37 20 48 21 21 00 05 J1925+1227 15 34 15 27.4-248.9 -3.9 -30.8 196 37 21 00 05 21 05 05 =1923+123 15 39 16 28.0-247.7 -3.8 -30.6 300 42 21 00 06 21 05 05 G45.07+0.13 15 39 16 28.1-243.8 -3.6 -29.4 -5 42 No stop 21 07 05 --- 15 41 16 28.3-243.3 -3.5 -29.2 115 44 21 05 06 21 07 45 J1925+1227 15 41 56 28.3-247.1 -3.7 -30.4 35 44 21 07 45 21 10 45 =1923+123 15 44 56 28.7-246.3 -3.7 -30.2 180 47 21 07 46 21 10 45 G45.07+0.13 15 44 56 28.8-242.4 -3.5 -29.0 -5 47 No stop 21 12 45 --- 15 46 57 29.0-242.0 -3.5 -28.8 115 49 21 10 46 21 12 45 J1925+1227 15 46 57 28.9-245.9 -3.7 -30.1 -5 49 No stop 21 15 45 =1923+123 15 49 57 29.3-245.1 -3.6 -29.9 175 52 21 12 46 21 15 45 G45.07+0.13 15 49 57 29.4-241.2 -3.4 -28.6 -5 52 No stop 21 17 45 --- 15 51 58 29.6-240.7 -3.4 -28.5 115 54 21 15 46 21 18 25 J1925+1227 15 52 38 29.6-244.5 -3.6 -29.7 35 54 21 18 25 21 21 25 =1923+123 15 55 38 30.0-243.7 -3.5 -29.5 180 57 21 18 26 21 21 25 G45.07+0.13 15 55 38 30.0-239.8 -3.3 -28.2 -5 57 No stop 21 23 25 --- 15 57 39 30.3-239.3 -3.3 -28.0 115 59 21 21 26 Schedule for IRBENE (Code Ir ) Page 3 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Tue 7 Jun 2016 Day 159 --- 21 23 25 J1925+1227 15 57 39 30.2-243.3 -3.5 -29.4 -5 59 No stop 21 26 25 =1923+123 16 00 39 30.6-242.5 -3.4 -29.2 175 62 21 23 26 21 26 25 G45.07+0.13 16 00 39 30.6-238.5 -3.2 -27.8 -5 62 No stop 21 28 25 --- 16 02 39 30.8-238.0 -3.2 -27.6 115 63 21 26 26 21 28 25 J1925+1227 16 02 39 30.8-242.0 -3.4 -29.0 -5 63 No stop 21 31 25 =1923+123 16 05 40 31.2-241.3 -3.3 -28.8 175 66 21 28 26 21 31 25 G45.07+0.13 16 05 40 31.2-237.3 -3.1 -27.4 -5 66 No stop 21 33 25 --- 16 07 40 31.4-236.8 -3.1 -27.2 115 68 21 31 26 21 34 05 J1925+1227 16 08 20 31.5-240.6 -3.3 -28.6 35 68 21 34 05 21 37 05 =1923+123 16 11 21 31.9-239.8 -3.3 -28.4 180 71 21 34 06 21 37 05 G45.07+0.13 16 11 21 31.8-235.8 -3.0 -26.9 -5 71 No stop 21 39 05 --- 16 13 21 32.0-235.3 -3.0 -26.7 115 73 21 37 06 21 39 05 J1925+1227 16 13 21 32.1-239.3 -3.2 -28.2 -5 73 No stop 21 42 05 =1923+123 16 16 22 32.4-238.6 -3.2 -28.0 175 76 21 39 06 21 45 50 J2202+4216 16 20 07 36.7-293.2 -5.7 -41.9 194 76 21 45 50 21 53 50 =VR422201 16 28 09 37.7-291.8 -5.6 -42.4 480 84 21 45 51 21 57 40 J1925+1227 16 31 59 34.2-234.5 -2.9 -26.6 199 84 21 57 40 22 00 40 =1923+123 16 35 00 34.5-233.7 -2.9 -26.3 180 87 21 57 41 22 00 40 G45.07+0.13 16 35 00 34.3-229.6 -2.7 -24.6 -5 87 No stop 22 02 40 --- 16 37 00 34.5-229.0 -2.6 -24.4 115 88 22 00 41 22 02 40 J1925+1227 16 37 00 34.7-233.2 -2.8 -26.1 -5 88 No stop 22 05 40 =1923+123 16 40 00 35.0-232.4 -2.8 -25.8 175 91 22 02 41 22 05 40 G45.07+0.13 16 40 00 34.8-228.2 -2.6 -24.0 -5 91 No stop 22 07 40 --- 16 42 01 35.0-227.7 -2.5 -23.8 115 93 22 05 41 22 07 40 J1925+1227 16 42 01 35.3-231.8 -2.7 -25.6 -5 93 No stop 22 10 40 =1923+123 16 45 01 35.6-231.0 -2.7 -25.3 175 96 22 07 41 22 10 40 G45.07+0.13 16 45 01 35.3-226.8 -2.5 -23.5 -5 96 No stop 22 12 40 --- 16 47 02 35.5-226.3 -2.5 -23.3 115 98 22 10 41 22 13 20 J1925+1227 16 47 42 35.8-230.3 -2.6 -25.0 35 98 22 13 20 22 16 20 =1923+123 16 50 42 36.2-229.5 -2.6 -24.7 180 101 22 13 21 Schedule for IRBENE (Code Ir ) Page 4 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Tue 7 Jun 2016 Day 159 --- 22 16 20 G45.07+0.13 16 50 42 35.9-225.2 -2.4 -22.8 -5 101 No stop 22 18 20 --- 16 52 43 36.1-224.7 -2.4 -22.6 115 103 22 16 21 22 18 20 J1925+1227 16 52 43 36.4-228.9 -2.6 -24.5 -5 103 No stop 22 21 20 =1923+123 16 55 43 36.7-228.1 -2.5 -24.1 175 106 22 18 21 22 21 20 G45.07+0.13 16 55 43 36.4-223.8 -2.3 -22.2 -5 106 No stop 22 23 20 --- 16 57 43 36.5-223.3 -2.3 -22.0 115 108 22 21 21 22 23 20 J1925+1227 16 57 43 36.9-227.5 -2.5 -23.9 -5 108 No stop 22 26 20 =1923+123 17 00 44 37.2-226.7 -2.4 -23.6 175 111 22 23 21 22 26 20 G45.07+0.13 17 00 44 36.8-222.4 -2.2 -21.6 -5 111 No stop 22 28 20 --- 17 02 44 37.0-221.8 -2.2 -21.4 115 112 22 26 21 22 29 00 J1925+1227 17 03 24 37.4-225.9 -2.4 -23.3 35 112 22 29 00 22 32 00 =1923+123 17 06 25 37.7-225.1 -2.3 -22.9 180 115 22 29 01 22 32 00 G45.07+0.13 17 06 25 37.3-220.8 -2.1 -20.9 -5 115 No stop 22 34 00 --- 17 08 25 37.5-220.2 -2.1 -20.7 115 117 22 32 01 22 34 00 J1925+1227 17 08 25 37.9-224.5 -2.3 -22.7 -5 117 No stop 22 37 00 =1923+123 17 11 26 38.2-223.6 -2.3 -22.3 175 120 22 34 01 22 40 55 J2202+4216 17 15 21 43.7-283.5 -4.8 -44.9 202 120 22 40 55 22 48 55 =VR422201 17 23 23 44.8-282.1 -4.7 -45.2 480 128 22 40 56 22 53 00 J1925+1227 17 27 28 39.6-219.0 -2.0 -20.2 211 128 22 53 00 22 56 00 =1923+123 17 30 29 39.8-218.1 -1.9 -19.8 180 131 22 53 01 22 56 00 G45.07+0.13 17 30 29 39.3-213.7 -1.7 -17.6 -5 131 No stop 22 58 00 --- 17 32 29 39.4-213.1 -1.7 -17.3 115 133 22 56 01 22 58 00 J1925+1227 17 32 29 40.0-217.5 -1.9 -19.5 -5 133 No stop 23 01 00 =1923+123 17 35 30 40.3-216.5 -1.8 -19.1 175 136 22 58 01 23 01 00 G45.07+0.13 17 35 30 39.6-212.2 -1.6 -16.9 -5 136 No stop 23 03 00 --- 17 37 30 39.8-211.5 -1.6 -16.6 115 137 23 01 01 23 03 00 J1925+1227 17 37 30 40.4-215.9 -1.8 -18.8 -5 137 No stop 23 06 00 =1923+123 17 40 30 40.6-215.0 -1.8 -18.4 175 140 23 03 01 23 06 00 G45.07+0.13 17 40 30 40.0-210.6 -1.6 -16.2 -5 140 No stop 23 08 00 --- 17 42 31 40.1-210.0 -1.5 -15.9 115 142 23 06 01 Schedule for IRBENE (Code Ir ) Page 5 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Tue 7 Jun 2016 Day 159 --- 23 08 40 J1925+1227 17 43 11 40.9-214.2 -1.7 -18.0 35 142 23 08 40 23 11 40 =1923+123 17 46 11 41.1-213.3 -1.7 -17.6 180 145 23 08 41 23 11 40 G45.07+0.13 17 46 11 40.4-208.9 -1.5 -15.3 -5 145 No stop 23 13 40 --- 17 48 12 40.5-208.2 -1.4 -15.0 115 147 23 11 41 23 13 40 J1925+1227 17 48 12 41.2-212.7 -1.6 -17.3 -5 147 No stop 23 16 40 =1923+123 17 51 12 41.4-211.7 -1.6 -16.8 175 150 23 13 41 23 16 40 G45.07+0.13 17 51 12 40.7-207.3 -1.4 -14.5 -5 150 No stop 23 18 40 --- 17 53 12 40.8-206.7 -1.3 -14.2 115 152 23 16 41 23 18 40 J1925+1227 17 53 12 41.6-211.1 -1.6 -16.5 -5 152 No stop 23 21 40 =1923+123 17 56 13 41.8-210.2 -1.5 -16.0 175 155 23 18 41 23 21 40 G45.07+0.13 17 56 13 41.0-205.7 -1.3 -13.7 -5 155 No stop 23 23 40 --- 17 58 13 41.1-205.1 -1.3 -13.4 115 157 23 21 41 23 24 20 J1925+1227 17 58 53 42.0-209.3 -1.5 -15.6 35 157 23 24 20 23 27 20 =1923+123 18 01 54 42.2-208.4 -1.4 -15.1 180 160 23 24 21 23 27 20 G45.07+0.13 18 01 54 41.3-203.9 -1.2 -12.8 -5 160 No stop 23 29 20 --- 18 03 54 41.4-203.3 -1.2 -12.5 115 162 23 27 21 23 29 20 J1925+1227 18 03 54 42.3-207.7 -1.4 -14.8 -5 162 No stop 23 32 20 =1923+123 18 06 55 42.5-206.8 -1.3 -14.3 175 164 23 29 21 23 36 35 J2202+4216 18 11 10 51.1-272.9 -3.9 -46.5 219 164 23 36 35 23 44 35 =VR422201 18 19 12 52.2-271.2 -3.7 -46.5 480 172 23 36 36 23 49 00 J1925+1227 18 23 37 43.4-201.3 -1.0 -11.5 228 172 23 49 00 23 52 00 =1923+123 18 26 38 43.5-200.3 -1.0 -11.0 180 175 23 49 01 23 52 00 G45.07+0.13 18 26 38 42.4-195.9 -0.8 -8.6 -5 175 No stop 23 54 00 --- 18 28 38 42.5-195.2 -0.8 -8.3 115 177 23 52 01 23 54 00 J1925+1227 18 28 38 43.6-199.7 -1.0 -10.7 -5 177 No stop 23 57 00 =1923+123 18 31 39 43.7-198.7 -0.9 -10.1 175 180 23 54 01 23 57 00 G45.07+0.13 18 31 39 42.6-194.2 -0.7 -7.7 -5 180 No stop 23 59 00 --- 18 33 39 42.7-193.6 -0.7 -7.4 115 182 23 57 01 Schedule for IRBENE (Code Ir ) Page 6 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Start: Tue 7 Jun 2016 Day 159 -- Stop: Wed 8 Jun 2016 Day 160 --- 23 59 00 J1925+1227 18 33 39 43.8-198.0 -0.9 -9.8 -5 182 No stop 00 02 00 =1923+123 18 36 40 44.0-197.0 -0.8 -9.2 175 185 23 59 01 00 02 00 G45.07+0.13 18 36 40 42.8-192.6 -0.6 -6.8 -5 185 No stop 00 04 00 --- 18 38 40 42.8-191.9 -0.6 -6.5 115 187 00 02 01 00 04 40 J1925+1227 18 39 20 44.1-196.1 -0.8 -8.8 35 187 00 04 40 00 07 40 =1923+123 18 42 21 44.2-195.1 -0.7 -8.2 180 189 00 04 41 00 07 40 G45.07+0.13 18 42 21 42.9-190.7 -0.5 -5.8 -5 189 No stop 00 09 40 --- 18 44 21 43.0-190.0 -0.5 -5.5 115 191 00 07 41 00 09 40 J1925+1227 18 44 21 44.2-194.4 -0.7 -7.9 -5 191 No stop 00 12 40 =1923+123 18 47 21 44.3-193.4 -0.7 -7.3 175 194 00 09 41 00 12 40 G45.07+0.13 18 47 21 43.0-189.0 -0.4 -4.9 -5 194 No stop 00 14 40 --- 18 49 22 43.1-188.3 -0.4 -4.5 115 196 00 12 41 00 14 40 J1925+1227 18 49 22 44.4-192.7 -0.6 -7.0 -5 196 No stop 00 17 40 =1923+123 18 52 22 44.5-191.7 -0.6 -6.4 175 199 00 14 41 00 17 40 G45.07+0.13 18 52 22 43.1-187.3 -0.4 -4.0 -5 199 No stop 00 19 40 --- 18 54 23 43.2-186.7 -0.3 -3.6 115 201 00 17 41 00 20 20 J1925+1227 18 55 03 44.5-190.8 -0.5 -5.9 35 201 00 20 20 00 23 20 =1923+123 18 58 03 44.6-189.8 -0.5 -5.3 180 204 00 20 21 00 23 20 G45.07+0.13 18 58 03 43.2-185.4 -0.3 -3.0 -5 204 No stop 00 25 20 --- 19 00 03 43.2-184.8 -0.2 -2.6 115 206 00 23 21 00 25 20 J1925+1227 19 00 03 44.7-189.1 -0.4 -5.0 -5 206 No stop 00 28 20 =1923+123 19 03 04 44.7-188.0 -0.4 -4.4 175 209 00 25 21 00 32 55 J2202+4216 19 07 40 58.7-260.3 -2.9 -45.7 235 209 00 32 55 00 40 55 =VR422201 19 15 41 59.7-258.3 -2.8 -45.3 480 216 00 32 56 00 45 40 J1925+1227 19 20 27 44.9-182.1 -0.1 -1.1 245 216 00 45 40 00 48 40 =1923+123 19 23 27 44.9-181.0 -0.1 -0.6 180 219 00 45 41 00 48 40 G45.07+0.13 19 23 27 43.3-176.9 0.2 1.7 -5 219 No stop 00 50 40 --- 19 25 28 43.3-176.2 0.2 2.1 115 221 00 48 41 00 50 40 J1925+1227 19 25 28 44.9-180.3 -0.0 -0.2 -5 221 No stop 00 53 40 =1923+123 19 28 28 44.9-179.3 0.0 0.4 175 224 00 50 41 Schedule for IRBENE (Code Ir ) Page 7 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Wed 8 Jun 2016 Day 160 --- 00 53 40 G45.07+0.13 19 28 28 43.2-175.2 0.2 2.6 -5 224 No stop 00 55 40 --- 19 30 28 43.2-174.5 0.3 3.0 115 226 00 53 41 00 55 40 J1925+1227 19 30 28 44.9-178.6 0.1 0.8 -5 226 No stop 00 58 40 =1923+123 19 33 29 44.9-177.6 0.1 1.3 175 229 00 55 41 00 58 40 G45.07+0.13 19 33 29 43.2-173.5 0.3 3.6 -5 229 No stop 01 00 40 --- 19 35 29 43.1-172.8 0.4 3.9 115 231 00 58 41 01 01 20 J1925+1227 19 36 09 44.9-176.7 0.2 1.8 35 231 01 01 20 01 04 20 =1923+123 19 39 10 44.9-175.6 0.2 2.4 180 234 01 01 21 01 04 20 G45.07+0.13 19 39 10 43.1-171.6 0.4 4.6 -5 234 No stop 01 06 20 --- 19 41 10 43.0-170.9 0.5 5.0 115 236 01 04 21 01 06 20 J1925+1227 19 41 10 44.9-174.9 0.2 2.8 -5 236 No stop 01 09 20 =1923+123 19 44 11 44.8-173.9 0.3 3.3 175 238 01 06 21 01 09 20 G45.07+0.13 19 44 11 43.0-169.9 0.5 5.5 -5 238 No stop 01 11 20 --- 19 46 11 42.9-169.2 0.5 5.9 115 240 01 09 21 01 11 20 J1925+1227 19 46 11 44.8-173.2 0.3 3.7 -5 240 No stop 01 14 20 =1923+123 19 49 11 44.7-172.2 0.4 4.3 175 243 01 11 21 01 14 20 G45.07+0.13 19 49 11 42.8-168.2 0.6 6.4 -5 243 No stop 01 16 20 --- 19 51 12 42.8-167.6 0.6 6.8 115 245 01 14 21 01 17 00 J1925+1227 19 51 52 44.7-171.3 0.4 4.8 35 245 01 17 00 01 20 00 =1923+123 19 54 52 44.6-170.2 0.5 5.3 180 248 01 17 01 01 20 00 G45.07+0.13 19 54 52 42.7-166.3 0.7 7.4 -5 248 No stop 01 22 00 --- 19 56 53 42.6-165.7 0.7 7.8 115 250 01 20 01 01 22 00 J1925+1227 19 56 53 44.6-169.6 0.5 5.7 -5 250 No stop 01 25 00 =1923+123 19 59 53 44.5-168.5 0.6 6.3 175 253 01 22 01 01 30 00 J2202+4216 20 04 54 65.9-243.7 -2.0 -40.6 259 253 01 30 00 01 38 00 =VR422201 20 12 55 66.9-240.9 -1.8 -39.4 480 261 01 30 01 01 43 10 J1925+1227 20 18 06 43.9-162.4 0.9 9.6 269 261 01 43 10 01 46 10 =1923+123 20 21 07 43.8-161.4 0.9 10.1 180 263 01 43 11 01 46 10 G45.07+0.13 20 21 07 41.6-157.8 1.1 11.9 -5 263 No stop 01 48 10 --- 20 23 07 41.5-157.1 1.1 12.3 115 265 01 46 11 Schedule for IRBENE (Code Ir ) Page 8 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Wed 8 Jun 2016 Day 160 --- 01 48 10 J1925+1227 20 23 07 43.7-160.7 0.9 10.5 -5 265 No stop 01 51 10 =1923+123 20 26 08 43.5-159.7 1.0 11.0 175 268 01 48 11 01 51 10 G45.07+0.13 20 26 08 41.3-156.2 1.2 12.7 -5 268 No stop 01 53 10 --- 20 28 08 41.2-155.5 1.2 13.1 115 270 01 51 11 01 53 10 J1925+1227 20 28 08 43.4-159.1 1.0 11.3 -5 270 No stop 01 56 10 =1923+123 20 31 08 43.3-158.1 1.1 11.8 175 273 01 53 11 01 56 10 G45.07+0.13 20 31 08 41.0-154.6 1.3 13.6 -5 273 No stop 01 58 10 --- 20 33 09 40.9-153.9 1.3 13.9 115 275 01 56 11 01 58 55 J1925+1227 20 33 54 43.1-157.2 1.1 12.3 40 275 01 58 55 02 01 55 =1923+123 20 36 54 43.0-156.2 1.2 12.8 180 278 01 58 56 02 01 55 G45.07+0.13 20 36 54 40.7-152.8 1.4 14.5 -5 278 No stop 02 03 55 --- 20 38 55 40.6-152.1 1.4 14.8 115 280 02 01 56 02 03 55 J1925+1227 20 38 55 42.9-155.5 1.2 13.2 -5 280 No stop 02 06 55 =1923+123 20 41 55 42.7-154.6 1.3 13.7 175 283 02 03 56 02 06 55 G45.07+0.13 20 41 55 40.4-151.2 1.5 15.3 -5 283 No stop 02 08 55 --- 20 43 55 40.3-150.6 1.5 15.6 115 285 02 06 56 02 08 55 J1925+1227 20 43 55 42.6-153.9 1.3 14.0 -5 285 No stop 02 11 55 =1923+123 20 46 56 42.4-152.9 1.3 14.5 175 287 02 08 56 02 11 55 G45.07+0.13 20 46 56 40.1-149.6 1.5 16.0 -5 287 No stop 02 13 55 --- 20 48 56 39.9-149.0 1.6 16.3 115 289 02 11 56 02 14 40 J1925+1227 20 49 41 42.2-152.1 1.4 14.9 40 289 02 14 40 02 17 40 =1923+123 20 52 42 42.0-151.1 1.4 15.4 180 292 02 14 41 02 17 40 G45.07+0.13 20 52 42 39.7-147.9 1.6 16.9 -5 292 No stop 02 19 40 --- 20 54 42 39.5-147.3 1.7 17.2 115 294 02 17 41 02 19 40 J1925+1227 20 54 42 41.9-150.5 1.5 15.7 -5 294 No stop 02 22 40 =1923+123 20 57 43 41.7-149.5 1.5 16.2 175 297 02 19 41 02 28 00 J2202+4216 21 03 04 72.1-218.6 -1.0 -27.0 281 297 02 28 00 02 36 00 =VR422201 21 11 05 72.7-214.2 -0.9 -24.1 480 305 02 28 01 02 41 30 J1925+1227 21 16 36 40.3-143.7 1.8 19.0 292 305 02 41 30 02 44 30 =1923+123 21 19 36 40.1-142.8 1.9 19.4 180 308 02 41 31 Schedule for IRBENE (Code Ir ) Page 9 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Wed 8 Jun 2016 Day 160 --- 02 44 30 G45.07+0.13 21 19 36 37.5-139.9 2.1 20.6 -4 308 No stop 02 46 30 --- 21 21 37 37.4-139.3 2.1 20.9 116 310 02 44 31 02 46 30 J1925+1227 21 21 37 39.9-142.2 1.9 19.7 -4 310 No stop 02 49 30 =1923+123 21 24 37 39.7-141.3 2.0 20.1 176 312 02 46 31 02 49 30 G45.07+0.13 21 24 37 37.1-138.4 2.2 21.3 -4 312 No stop 02 51 30 --- 21 26 37 36.9-137.9 2.2 21.5 116 314 02 49 31 02 51 30 J1925+1227 21 26 37 39.5-140.7 2.0 20.4 -4 314 No stop 02 54 30 =1923+123 21 29 38 39.2-139.8 2.1 20.8 176 317 02 51 31 02 54 30 G45.07+0.13 21 29 38 36.6-137.0 2.3 21.9 -4 317 No stop 02 56 30 --- 21 31 38 36.5-136.4 2.3 22.1 116 319 02 54 31 02 57 15 J1925+1227 21 32 23 39.0-139.0 2.1 21.1 41 319 02 57 15 03 00 15 =1923+123 21 35 24 38.7-138.1 2.1 21.5 180 322 02 57 16 03 00 15 G45.07+0.13 21 35 24 36.1-135.4 2.4 22.6 -4 322 No stop 03 02 15 --- 21 37 24 35.9-134.8 2.4 22.8 116 324 03 00 16 03 02 15 J1925+1227 21 37 24 38.6-137.5 2.2 21.8 -4 324 No stop 03 05 15 =1923+123 21 40 25 38.3-136.7 2.2 22.2 176 327 03 02 16 03 05 15 G45.07+0.13 21 40 25 35.6-134.0 2.4 23.2 -4 327 No stop 03 07 15 --- 21 42 25 35.4-133.4 2.5 23.4 116 329 03 05 16 03 07 15 J1925+1227 21 42 25 38.1-136.1 2.3 22.4 -4 329 No stop 03 10 15 =1923+123 21 45 26 37.8-135.2 2.3 22.8 176 332 03 07 16 03 10 15 G45.07+0.13 21 45 26 35.1-132.6 2.5 23.7 -4 332 No stop 03 12 15 --- 21 47 26 34.9-132.0 2.6 23.9 116 334 03 10 16 03 13 00 J1925+1227 21 48 11 37.5-134.5 2.4 23.1 41 334 03 13 00 03 16 00 =1923+123 21 51 11 37.3-133.6 2.4 23.4 180 337 03 13 01 03 16 00 G45.07+0.13 21 51 11 34.6-131.0 2.6 24.3 -4 337 No stop 03 18 00 --- 21 53 12 34.4-130.5 2.7 24.6 116 338 03 16 01 03 18 00 J1925+1227 21 53 12 37.1-133.0 2.4 23.7 -4 338 No stop 03 21 00 =1923+123 21 56 12 36.8-132.2 2.5 24.0 176 341 03 18 01 03 26 20 J2202+4216 22 01 33 74.8-181.3 -0.0 -1.0 291 341 03 26 20 03 35 10 =VR422201 22 10 25 74.8-175.1 0.1 3.6 530 350 03 26 21 Schedule for IRBENE (Code Ir ) Page 10 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Wed 8 Jun 2016 Day 160 --- 03 40 40 J1925+1227 22 15 56 34.7-126.8 2.8 26.1 304 350 03 40 40 03 43 40 =1923+123 22 18 56 34.4-126.0 2.9 26.4 180 353 03 40 41 03 43 40 G45.07+0.13 22 18 56 31.6-123.7 3.1 27.0 -4 353 No stop 03 45 40 --- 22 20 56 31.4-123.2 3.1 27.2 116 355 03 43 41 03 45 40 J1925+1227 22 20 56 34.2-125.5 2.9 26.6 -4 355 No stop 03 48 40 =1923+123 22 23 57 33.8-124.7 3.0 26.9 176 358 03 45 41 03 48 40 G45.07+0.13 22 23 57 31.0-122.4 3.2 27.5 -4 358 No stop 03 50 40 --- 22 25 57 30.8-121.9 3.2 27.6 116 359 03 48 41 03 50 40 J1925+1227 22 25 57 33.6-124.2 3.0 27.0 -4 359 No stop 03 53 40 =1923+123 22 28 58 33.3-123.4 3.0 27.3 176 362 03 50 41 03 53 40 G45.07+0.13 22 28 58 30.5-121.1 3.2 27.9 -4 362 No stop 03 55 40 --- 22 30 58 30.2-120.6 3.3 28.0 116 364 03 53 41 03 56 25 J1925+1227 22 31 43 33.0-122.7 3.1 27.5 41 364 03 56 25 03 59 25 =1923+123 22 34 44 32.6-121.9 3.1 27.8 180 367 03 56 26 03 59 25 G45.07+0.13 22 34 44 29.8-119.7 3.3 28.3 -4 367 No stop 04 01 25 --- 22 36 44 29.6-119.2 3.4 28.5 116 369 03 59 26 04 01 25 J1925+1227 22 36 44 32.4-121.4 3.2 28.0 -4 369 No stop 04 04 25 =1923+123 22 39 44 32.1-120.6 3.2 28.2 176 372 04 01 26 04 04 25 G45.07+0.13 22 39 44 29.2-118.5 3.4 28.7 -4 372 No stop 04 06 25 --- 22 41 45 29.0-118.0 3.5 28.9 116 374 04 04 26 04 06 25 J1925+1227 22 41 45 31.8-120.1 3.3 28.4 -4 374 No stop 04 09 25 =1923+123 22 44 45 31.5-119.4 3.3 28.6 176 377 04 06 26 04 09 25 G45.07+0.13 22 44 45 28.6-117.2 3.5 29.1 -4 377 No stop 04 11 25 --- 22 46 46 28.4-116.7 3.5 29.2 116 379 04 09 26 04 12 10 J1925+1227 22 47 31 31.2-118.7 3.4 28.8 41 379 04 12 10 04 15 10 =1923+123 22 50 31 30.8-117.9 3.4 29.0 180 382 04 12 11 04 15 10 G45.07+0.13 22 50 31 27.9-115.8 3.6 29.5 -4 382 No stop 04 17 10 --- 22 52 32 27.7-115.3 3.6 29.6 116 383 04 15 11 04 17 10 J1925+1227 22 52 32 30.6-117.4 3.4 29.2 -4 383 No stop 04 20 10 =1923+123 22 55 32 30.2-116.7 3.5 29.4 176 386 04 17 11 Schedule for IRBENE (Code Ir ) Page 11 A 3-D View of high-mass star formation: gas Kinematics and Magnetic Fiel UP: D => Below limits; H => Below horizon mask; W => still slewing at end; blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Disk: GBytes recorded to this point. TPStart: Recording start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Disk TPStart Stop UT LST EL AZ HA UP ParA Dwell GBytes SYNC ---------------------------------------------------------------------------------------- --- Wed 8 Jun 2016 Day 160 --- 04 24 50 J2202+4216 23 00 13 72.3-143.3 0.9 25.7 256 386 04 24 50 04 32 50 =VR422201 23 08 14 71.7-139.0 1.1 28.4 480 394 04 24 51 04 37 30 J1925+1227 23 12 55 28.1-112.5 3.8 30.5 255 394 04 37 30 04 40 30 =1923+123 23 15 55 27.7-111.8 3.8 30.7 180 397 04 37 31 04 40 30 G45.07+0.13 23 15 55 24.8-109.8 4.0 30.9 -4 397 No stop 04 42 30 --- 23 17 56 24.5-109.3 4.1 31.0 116 399 04 40 31 04 42 30 J1925+1227 23 17 56 27.5-111.3 3.9 30.8 -4 399 No stop 04 47 30 =1923+123 23 22 57 26.8-110.1 3.9 31.1 296 404 04 42 31 04 51 50 J2202+4216 23 27 17 69.8-129.9 1.4 33.9 235 404 04 51 50 05 00 00 =VR422201 23 35 29 69.0-126.3 1.5 35.8 490 412 04 51 51 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. ======== Setup file: sess216.M128 --- WARNING --- This group does not match an entry in the frequency catalog. This might be ok because the catalog is not complete. But be very careful to be sure that the setup is correct. Setup group: 11 Station: IRBENE Total bit rate: 128 Format: MARK5B Bits per sample: 2 Sample rate: 4.000 Number of channels: 16 DBE type: DBBC_DDC Speedup factor: 1.00 Disk used to record data. 1st LO= 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 6100.00 Net SB= L L U U L L U U L L U U L L U U IF SB = U U U U U U U U U U U U U U U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 5 1 5 2 6 2 6 3 7 3 7 4 8 4 8 BBC SB= L L U U L L U U L L U U L L U U IF = A1 B1 A1 B1 A1 B1 A1 B1 A1 B1 A1 B1 A1 B1 A1 B1 The following frequency sets based on these setups were used. Frequency Set: 8 Based on FREQ, BW, and/or DOPPLER in schedule. Used with PCAL = off LO sum= 6664.94 6664.94 6664.94 6664.94 6668.94 6668.94 6668.94 6668.94 6672.94 6672.94 6672.94 6672.94 6676.94 6676.94 6676.94 6676.94 BBC fr= 564.94 564.94 564.94 564.94 568.94 568.94 568.94 568.94 572.94 572.94 572.94 572.94 576.94 576.94 576.94 576.94 Bandwd= 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Matching frequency sets: 8 Track assignments are: track1= 18, 26, 2, 10, 20, 28, 4, 12, 22, 30, 6, 14, 24, 32, 8, 16 barrel=roll_off POSITIONS OF SOURCES USED IN RECORDING SCANS Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * G45.07+0.13 19 11 00.377969 * 19 13 22.043000 19 14 09.555398 0.00 10 45 42.86614 * 10 50 53.34000 10 52 42.43635 0.00 From catalog imbedded in main SCHED input file. Doppler based on LSR frame and radio definition. Velocities: 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 58.00 3C286 13 28 49.657758 * 13 31 08.288051 13 31 54.104834 0.18 * J1331+3030 30 45 58.64059 * 30 30 32.95924 30 25 41.65591 0.17 1328+307 /home/guest/rmc/SCHED/sched11.4/catalogs/sources.gsfc J1331+30 GSFC 2015a astro solution, unpublished 225 observations. Doppler based on other sources. * 3C345 16 41 17.606228 * 16 42 58.809966 16 43 33.451559 0.76 J1642+3948 39 54 10.81496 * 39 48 36.99402 39 46 58.67248 0.52 1641+399 /home/guest/rmc/SCHED/sched11.4/catalogs/sources.gsfc J1642+39 GSFC 2015a astro solution, unpublished 53430 observations. Doppler based on other sources. 1923+123 19 23 20.742102 * 19 25 40.817064 19 26 27.790262 0.18 * J1925+1227 12 21 36.84527 * 12 27 38.08655 12 29 43.07236 0.30 /home/guest/rmc/SCHED/sched11.4/catalogs/sources.gsfc GSFC 2015a astro solution, unpublished 123 observations. Doppler based on other sources. VR422201 22 00 39.362505 * 22 02 43.291372 22 03 24.900798 0.00 * J2202+4216 42 02 08.59077 * 42 16 39.97990 42 21 16.33567 0.00 BLLAC /home/guest/rmc/SCHED/sched11.4/catalogs/sources.gsfc 2200+420 GSFC 2015a astro solution, unpublished 51226 observations. J2202+42 Doppler based on other sources. SOURCE SCAN SUMMARY FOR SOURCES LISTED ABOVE Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Setup file Frequency sets Observing hours (duplicates not shown) Scan Baseline G45.07+0.13sess216.M128 1 2 3 4 5 6 8 9 10 11 1.900 80.582 J1331+3030 sess216.M128 1 2 3 4 5 6 8 9 10 11 0.217 11.917 3C345 sess216.M128 1 2 3 4 5 6 8 9 10 11 0.167 9.161 J1925+1227 sess216.M128 1 2 3 4 5 6 8 9 10 11 3.367 168.701 J2202+4216 sess216.M128 1 2 3 4 5 6 8 9 10 11 1.483 66.117 EFFECT OF SOLAR CORONA The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) G45.07+0.13 134.0 J1331+3030 105.9 3C345 117.1 J1925+1227 130.7 J2202+4216 85.6 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg