  COVER INFORMATION 

 Station:    SHANGHAI  (Code Sh ) 
 Experiment: Ejection and deceleration of the H2O masers in IRAS 20126+4104
 Exp. Code:  EM059C  


Schedule Version:       2.00                                              
Processed by SCHED version:   6.05  June 2006                             

PI:       Luca Moscadelli                                                 

Address:  Osservatorio Astrofisico di Arcetri                             
          via E. Fermi, n.5                                               
          50125 Firenze                                                   
          Italy                                                           

Phone:    +39 055 2752220                                                 
EMAIL:    mosca@arcetri.astro.it (internet)                               
Fax:      +39 055 220039                                                  
Phone during observation:                                                 

Observing mode: VLBA 128-2-2                                              

Notes:    This is a PHASE REF experiment, DO NOT INTERRUPT the SEQUENCE   
          of SCANS                                                        
          SPECTRAL LINE observations: Make sure *** PHASE CAL is OFF***   
          Please make TSYS measurements whenever there is a gap           

Schedule for SHANGHAI  (Code Sh )                                   Page   2
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

 Next scan frequencies: 22229.06 22229.06
 Next BBC frequencies:    629.06   629.06
 Next scan bandwidths:     16.00    16.00

02 00 00  2007+777     20 57 34  42.8  -3.7  0.9     164.6     0   1  1      0  02 00 00
02 03 00  ---          21 00 35  42.8  -3.9  0.9     163.8   180   F  1      3  02 00 01

02 05 00  2002+472     21 02 35  70.0 -30.9  1.0     139.4    73   1  1      3  02 05 00
02 08 00  ---          21 05 36  69.7 -32.0  1.1     137.9   180   F  1      6  02 05 01

02 09 00  2007+402     21 06 36  74.9 -47.5  1.0     123.9    43   1  1      6  02 09 00
02 10 00  ---          21 07 36  74.7 -47.9  1.0     123.4    60   F  1      7  02 09 01

02 10 00  IRAS2012     21 07 36  75.3 -42.7  0.9     129.5    -7   1  1      7  02 10 00
02 10 40  ---          21 08 16  75.2 -43.0  0.9     129.0    33   F  1      7  02 10 01

02 10 40  2007+402     21 08 16  74.6 -48.1  1.0     123.0    -7   1  1      7  02 10 40
02 11 10  ---          21 08 46  74.5 -48.3  1.0     122.7    23   F  1      8  02 10 41

02 11 10  IRAS2012     21 08 46  75.1 -43.2  0.9     128.7    -7   1  1      8  02 11 10
02 11 50  ---          21 09 26  75.0 -43.5  0.9     128.3    33   F  1      9  02 11 11

02 11 50  2007+402     21 09 26  74.4 -48.6  1.0     122.4    -7   1  1      9  02 11 50
02 12 20  ---          21 09 56  74.3 -48.8  1.0     122.1    23   F  1      9  02 11 51

02 12 20  IRAS2012     21 09 56  75.0 -43.8  0.9     128.0    -7   1  1      9  02 12 20
02 13 00  ---          21 10 36  74.9 -44.1  0.9     127.6    33   F  1     10  02 12 21

02 13 00  2007+402     21 10 36  74.2 -49.0  1.0     121.8    -7   1  1     10  02 13 00
02 13 30  ---          21 11 06  74.2 -49.2  1.1     121.5    23   F  1     10  02 13 01

02 13 30  IRAS2012     21 11 06  74.8 -44.3  0.9     127.3    -7   1  1     10  02 13 30
02 14 10  ---          21 11 47  74.7 -44.6  1.0     127.0    33   F  1     11  02 13 31

02 14 10  2007+402     21 11 47  74.0 -49.4  1.1     121.2    -7   1  1     11  02 14 10
02 14 40  ---          21 12 17  74.0 -49.6  1.1     120.9    23   F  1     11  02 14 11

02 14 40  IRAS2012     21 12 17  74.6 -44.8  1.0     126.7    -7   1  1     11  02 14 40
02 15 20  ---          21 12 57  74.5 -45.1  1.0     126.3    33   F  1     12  02 14 41

02 15 20  2007+402     21 12 57  73.9 -49.8  1.1     120.6    -7   1  1     12  02 15 20
02 15 50  ---          21 13 27  73.8 -50.0  1.1     120.3    23   F  1     12  02 15 21
Schedule for SHANGHAI  (Code Sh )                                   Page   3
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

02 15 50  IRAS2012     21 13 27  74.4 -45.3  1.0     126.0    -7   1  1     12  02 15 50
02 16 30  ---          21 14 07  74.3 -45.5  1.0     125.6    33   F  1     13  02 15 51

02 16 30  2007+402     21 14 07  73.7 -50.3  1.1     120.0    -7   1  1     13  02 16 30
02 17 00  ---          21 14 37  73.6 -50.4  1.1     119.8    23   F  1     14  02 16 31

02 17 00  IRAS2012     21 14 37  74.3 -45.7  1.0     125.3    -7   1  1     14  02 17 00
02 17 40  ---          21 15 17  74.2 -46.0  1.0     125.0    33   F  1     14  02 17 01

02 17 40  2007+402     21 15 17  73.5 -50.6  1.1     119.4    -7   1  1     14  02 17 40
02 18 10  ---          21 15 47  73.4 -50.8  1.1     119.2    23   F  1     15  02 17 41

02 18 10  IRAS2012     21 15 47  74.1 -46.2  1.0     124.7    -7   1  1     15  02 18 10
02 18 50  ---          21 16 27  74.0 -46.5  1.0     124.4    33   F  1     15  02 18 11

02 18 50  2007+402     21 16 27  73.3 -51.0  1.1     118.9    -7   1  1     15  02 18 50
02 19 20  ---          21 16 57  73.2 -51.2  1.1     118.7    23   F  1     16  02 18 51

02 19 20  IRAS2012     21 16 57  73.9 -46.7  1.0     124.1    -7   1  1     16  02 19 20
02 20 00  ---          21 17 38  73.8 -46.9  1.0     123.7    33   F  1     16  02 19 21

02 20 00  2007+402     21 17 38  73.1 -51.4  1.2     118.3    -6   1  1     16  02 20 00
02 20 30  ---          21 18 08  73.0 -51.5  1.2     118.1    24   F  1     17  02 20 01

02 20 30  IRAS2012     21 18 08  73.7 -47.1  1.1     123.5    -6   1  1     17  02 20 30
02 21 10  ---          21 18 48  73.6 -47.3  1.1     123.1    34   F  1     18  02 20 31

02 21 10  2007+402     21 18 48  72.9 -51.7  1.2     117.8    -6   1  1     18  02 21 10
02 21 40  ---          21 19 18  72.8 -51.9  1.2     117.6    24   F  1     18  02 21 11

02 21 40  IRAS2012     21 19 18  73.5 -47.5  1.1     122.9    -6   1  1     18  02 21 40
02 22 20  ---          21 19 58  73.4 -47.8  1.1     122.5    34   F  1     19  02 21 41

02 22 20  2007+402     21 19 58  72.7 -52.1  1.2     117.3    -6   1  1     19  02 22 20
02 22 50  ---          21 20 28  72.6 -52.2  1.2     117.1    24   F  1     19  02 22 21

02 22 50  IRAS2012     21 20 28  73.3 -47.9  1.1     122.3    -6   1  1     19  02 22 50
02 23 30  ---          21 21 08  73.2 -48.2  1.1     121.9    34   F  1     20  02 22 51

02 23 30  2007+402     21 21 08  72.5 -52.4  1.2     116.8    -6   1  1     20  02 23 30
02 24 00  ---          21 21 38  72.4 -52.6  1.2     116.6    24   F  1     20  02 23 31

02 24 00  IRAS2012     21 21 38  73.2 -48.3  1.1     121.7    -6   1  1     20  02 24 00
02 24 40  ---          21 22 18  73.0 -48.6  1.1     121.4    34   F  1     21  02 24 01
Schedule for SHANGHAI  (Code Sh )                                   Page   4
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

02 24 40  2007+402     21 22 18  72.3 -52.8  1.2     116.3    -6   1  1     21  02 24 40
02 25 10  ---          21 22 48  72.2 -52.9  1.2     116.1    24   F  1     21  02 24 41

02 25 10  IRAS2012     21 22 48  73.0 -48.7  1.1     121.1    -6   1  1     21  02 25 10
02 25 50  ---          21 23 28  72.9 -49.0  1.1     120.8    34   F  1     22  02 25 11

02 25 50  2007+402     21 23 28  72.1 -53.1  1.3     115.8    -6   1  1     22  02 25 50
02 26 20  ---          21 23 59  72.0 -53.2  1.3     115.6    24   F  1     23  02 25 51

02 26 20  IRAS2012     21 23 59  72.8 -49.1  1.2     120.6    -6   1  1     23  02 26 20
02 27 00  ---          21 24 39  72.7 -49.3  1.2     120.3    34   F  1     23  02 26 21

02 27 00  2007+402     21 24 39  71.9 -53.4  1.3     115.3    -6   1  1     23  02 27 00
02 27 30  ---          21 25 09  71.8 -53.5  1.3     115.1    24   F  1     24  02 27 01

02 27 30  IRAS2012     21 25 09  72.6 -49.5  1.2     120.0    -6   1  1     24  02 27 30
02 28 10  ---          21 25 49  72.5 -49.7  1.2     119.7    34   F  1     24  02 27 31

02 28 10  2007+402     21 25 49  71.7 -53.7  1.3     114.8    -6   1  1     24  02 28 10
02 28 40  ---          21 26 19  71.6 -53.8  1.3     114.6    24   F  1     25  02 28 11

02 28 40  IRAS2012     21 26 19  72.4 -49.9  1.2     119.5    -6   1  1     25  02 28 40
02 29 20  ---          21 26 59  72.3 -50.1  1.2     119.2    34   F  1     25  02 28 41

02 29 20  2007+402     21 26 59  71.5 -54.0  1.3     114.4    -6   1  1     25  02 29 20
02 29 50  ---          21 27 29  71.4 -54.1  1.3     114.2    24   F  1     26  02 29 21

02 30 50  2007+402     21 28 29  71.2 -54.3  1.3     113.8    58   1  1     26  02 30 50
02 32 00  ---          21 29 39  71.0 -54.6  1.4     113.3    70   F  1     27  02 30 51

02 32 00  IRAS2012     21 29 39  71.8 -50.8  1.2     118.0    -6   1  1     27  02 32 00
02 32 40  ---          21 30 20  71.7 -51.0  1.3     117.7    34   F  1     28  02 32 01

02 32 40  2007+402     21 30 20  70.9 -54.8  1.4     113.1    -6   1  1     28  02 32 40
02 33 10  ---          21 30 50  70.8 -54.9  1.4     112.9    24   F  1     28  02 32 41

02 33 10  IRAS2012     21 30 50  71.7 -51.2  1.3     117.5    -6   1  1     28  02 33 10
02 33 50  ---          21 31 30  71.5 -51.3  1.3     117.2    34   F  1     29  02 33 11

02 33 50  2007+402     21 31 30  70.7 -55.0  1.4     112.6    -6   1  1     29  02 33 50
02 34 20  ---          21 32 00  70.6 -55.1  1.4     112.4    24   F  1     29  02 33 51

02 34 20  IRAS2012     21 32 00  71.5 -51.5  1.3     117.0    -6   1  1     29  02 34 20
02 35 00  ---          21 32 40  71.3 -51.7  1.3     116.7    34   F  1     30  02 34 21
Schedule for SHANGHAI  (Code Sh )                                   Page   5
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

02 35 00  2007+402     21 32 40  70.5 -55.3  1.4     112.2    -6   1  1     30  02 35 00
02 35 30  ---          21 33 10  70.4 -55.4  1.4     112.0    24   F  1     30  02 35 01

02 35 30  IRAS2012     21 33 10  71.3 -51.8  1.3     116.5    -6   1  1     30  02 35 30
02 36 10  ---          21 33 50  71.1 -52.0  1.3     116.2    34   F  1     31  02 35 31

02 36 10  2007+402     21 33 50  70.3 -55.5  1.4     111.8    -6   1  1     31  02 36 10
02 36 40  ---          21 34 20  70.2 -55.6  1.4     111.6    24   F  1     32  02 36 11

02 36 40  IRAS2012     21 34 20  71.1 -52.1  1.3     116.0    -6   1  1     32  02 36 40
02 37 20  ---          21 35 00  71.0 -52.3  1.3     115.8    34   F  1     32  02 36 41

02 37 20  2007+402     21 35 00  70.1 -55.8  1.4     111.4    -6   1  1     32  02 37 20
02 37 50  ---          21 35 30  70.0 -55.9  1.5     111.2    24   F  1     33  02 37 21

02 37 50  IRAS2012     21 35 30  70.9 -52.4  1.3     115.6    -5   1  1     33  02 37 50
02 38 30  ---          21 36 11  70.8 -52.5  1.4     115.3    35   F  1     33  02 37 51

02 38 30  2007+402     21 36 11  69.9 -56.0  1.5     110.9    -5   1  1     33  02 38 30
02 39 00  ---          21 36 41  69.8 -56.1  1.5     110.8    25   F  1     34  02 38 31

02 39 00  IRAS2012     21 36 41  70.7 -52.7  1.4     115.1    -5   1  1     34  02 39 00
02 39 40  ---          21 37 21  70.6 -52.8  1.4     114.8    35   F  1     35  02 39 01

02 39 40  2007+402     21 37 21  69.7 -56.2  1.5     110.5    -5   1  1     35  02 39 40
02 40 10  ---          21 37 51  69.6 -56.3  1.5     110.4    25   F  1     35  02 39 41

02 40 10  IRAS2012     21 37 51  70.5 -52.9  1.4     114.6    -5   1  1     35  02 40 10
02 40 50  ---          21 38 31  70.4 -53.1  1.4     114.4    35   F  1     36  02 40 11

02 40 50  2007+402     21 38 31  69.5 -56.5  1.5     110.1    -5   1  1     36  02 40 50
02 41 20  ---          21 39 01  69.4 -56.6  1.5     110.0    25   F  1     36  02 40 51

02 41 20  IRAS2012     21 39 01  70.3 -53.2  1.4     114.2    -5   1  1     36  02 41 20
02 42 00  ---          21 39 41  70.2 -53.4  1.4     113.9    35   F  1     37  02 41 21

02 42 00  2007+402     21 39 41  69.3 -56.7  1.5     109.7    -5   1  1     37  02 42 00
02 42 30  ---          21 40 11  69.2 -56.8  1.5     109.6    25   F  1     37  02 42 01

02 42 30  IRAS2012     21 40 11  70.1 -53.5  1.4     113.8    -5   1  1     37  02 42 30
02 43 10  ---          21 40 51  70.0 -53.6  1.4     113.5    35   F  1     38  02 42 31

02 43 10  2007+402     21 40 51  69.0 -56.9  1.5     109.4    -5   1  1     38  02 43 10
02 43 40  ---          21 41 21  69.0 -57.0  1.6     109.2    25   F  1     38  02 43 11
Schedule for SHANGHAI  (Code Sh )                                   Page   6
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

02 43 40  IRAS2012     21 41 21  69.9 -53.7  1.4     113.3    -5   1  1     38  02 43 40
02 44 20  ---          21 42 02  69.7 -53.9  1.5     113.1    35   F  1     39  02 43 41

02 44 20  2007+402     21 42 02  68.8 -57.1  1.6     109.0    -5   1  1     39  02 44 20
02 44 50  ---          21 42 32  68.7 -57.2  1.6     108.8    25   F  1     40  02 44 21

02 44 50  IRAS2012     21 42 32  69.7 -54.0  1.5     112.9    -5   1  1     40  02 44 50
02 45 30  ---          21 43 12  69.5 -54.1  1.5     112.7    35   F  1     40  02 44 51

02 45 30  2007+402     21 43 12  68.6 -57.3  1.6     108.6    -5   1  1     40  02 45 30
02 46 00  ---          21 43 42  68.5 -57.4  1.6     108.5    25   F  1     41  02 45 31

02 46 00  IRAS2012     21 43 42  69.5 -54.2  1.5     112.5    -5   1  1     41  02 46 00
02 46 40  ---          21 44 22  69.3 -54.4  1.5     112.2    35   F  1     41  02 46 01

02 46 40  2007+402     21 44 22  68.4 -57.5  1.6     108.2    -5   1  1     41  02 46 40
02 47 10  ---          21 44 52  68.3 -57.6  1.6     108.1    25   F  1     42  02 46 41

02 47 10  IRAS2012     21 44 52  69.3 -54.5  1.5     112.1    -5   1  1     42  02 47 10
02 47 50  ---          21 45 32  69.1 -54.6  1.5     111.8    35   F  1     42  02 47 11

02 47 50  2007+402     21 45 32  68.2 -57.7  1.6     107.9    -5   1  1     42  02 47 50
02 48 20  ---          21 46 02  68.1 -57.7  1.6     107.7    25   F  1     43  02 47 51

02 48 20  IRAS2012     21 46 02  69.1 -54.7  1.5     111.7    -5   1  1     43  02 48 20
02 49 00  ---          21 46 42  68.9 -54.8  1.5     111.4    35   F  1     44  02 48 21

02 49 00  2007+402     21 46 42  68.0 -57.8  1.6     107.5    -5   1  1     44  02 49 00
02 49 30  ---          21 47 12  67.9 -57.9  1.7     107.4    25   F  1     44  02 49 01

02 49 30  IRAS2012     21 47 12  68.8 -54.9  1.5     111.3    -5   1  1     44  02 49 30
02 50 10  ---          21 47 52  68.7 -55.0  1.6     111.0    35   F  1     45  02 49 31

02 50 10  2007+402     21 47 52  67.8 -58.0  1.7     107.2    -5   1  1     45  02 50 10
02 50 40  ---          21 48 23  67.7 -58.1  1.7     107.0    25   F  1     45  02 50 11

02 50 40  IRAS2012     21 48 23  68.6 -55.1  1.6     110.9    -5   1  1     45  02 50 40
02 51 20  ---          21 49 03  68.5 -55.3  1.6     110.6    35   F  1     46  02 50 41

02 51 20  2007+402     21 49 03  67.6 -58.2  1.7     106.8    -5   1  1     46  02 51 20
02 51 50  ---          21 49 33  67.5 -58.3  1.7     106.7    25   F  1     46  02 51 21

02 52 50  2002+472     21 50 33  63.7 -43.9  1.8     118.6    44   1  1     46  02 52 50
02 55 50  ---          21 53 33  63.2 -44.4  1.9     117.6   180   F  1     49  02 52 51
Schedule for SHANGHAI  (Code Sh )                                   Page   7
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

02 56 50  2007+402     21 54 34  66.6 -58.9  1.8     105.2    43   1  1     49  02 56 50
02 58 00  ---          21 55 44  66.3 -59.1  1.8     104.9    70   F  1     50  02 56 51

02 58 00  IRAS2012     21 55 44  67.3 -56.4  1.7     108.5    -5   1  1     50  02 58 00
02 58 40  ---          21 56 24  67.2 -56.5  1.7     108.3    35   F  1     51  02 58 01

02 58 40  2007+402     21 56 24  66.2 -59.2  1.8     104.7    -5   1  1     51  02 58 40
02 59 10  ---          21 56 54  66.1 -59.2  1.8     104.6    25   F  1     51  02 58 41

02 59 10  IRAS2012     21 56 54  67.1 -56.6  1.7     108.1    -5   1  1     51  02 59 10
02 59 50  ---          21 57 34  67.0 -56.7  1.7     107.9    35   F  1     52  02 59 11

02 59 50  2007+402     21 57 34  66.0 -59.3  1.8     104.4    -5   1  1     52  02 59 50
03 00 20  ---          21 58 04  65.9 -59.4  1.8     104.3    25   F  1     53  02 59 51

03 00 20  IRAS2012     21 58 04  66.9 -56.7  1.7     107.8    -5   1  1     53  03 00 20
03 01 00  ---          21 58 44  66.8 -56.8  1.7     107.6    35   F  1     53  03 00 21

03 01 00  2007+402     21 58 44  65.8 -59.4  1.8     104.1    -5   1  1     53  03 01 00
03 01 30  ---          21 59 14  65.7 -59.5  1.9     104.0    25   F  1     54  03 01 01

03 01 30  IRAS2012     21 59 14  66.7 -56.9  1.7     107.4    -5   1  1     54  03 01 30
03 02 10  ---          21 59 54  66.6 -57.0  1.8     107.2    35   F  1     54  03 01 31

03 02 10  2007+402     21 59 54  65.6 -59.6  1.9     103.8    -5   1  1     54  03 02 10
03 02 40  ---          22 00 25  65.5 -59.6  1.9     103.7    25   F  1     55  03 02 11

03 02 40  IRAS2012     22 00 25  66.5 -57.1  1.8     107.1    -5   1  1     55  03 02 40
03 03 20  ---          22 01 05  66.4 -57.2  1.8     106.9    35   F  1     55  03 02 41

03 03 20  2007+402     22 01 05  65.4 -59.7  1.9     103.5    -5   1  1     55  03 03 20
03 03 50  ---          22 01 35  65.3 -59.7  1.9     103.4    25   F  1     56  03 03 21

03 03 50  IRAS2012     22 01 35  66.3 -57.2  1.8     106.8    -5   1  1     56  03 03 50
03 04 30  ---          22 02 15  66.2 -57.3  1.8     106.6    35   F  1     57  03 03 51

03 04 30  2007+402     22 02 15  65.1 -59.8  1.9     103.2    -4   1  1     57  03 04 30
03 05 00  ---          22 02 45  65.0 -59.9  1.9     103.1    26   F  1     57  03 04 31

03 05 00  IRAS2012     22 02 45  66.1 -57.4  1.8     106.4    -4   1  1     57  03 05 00
03 05 40  ---          22 03 25  66.0 -57.5  1.8     106.2    36   F  1     58  03 05 01

03 05 40  2007+402     22 03 25  64.9 -59.9  1.9     102.9    -4   1  1     58  03 05 40
03 06 10  ---          22 03 55  64.8 -60.0  1.9     102.8    26   F  1     58  03 05 41
Schedule for SHANGHAI  (Code Sh )                                   Page   8
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

03 06 10  IRAS2012     22 03 55  65.9 -57.5  1.8     106.1    -4   1  1     58  03 06 10
03 06 50  ---          22 04 35  65.8 -57.6  1.8     105.9    36   F  1     59  03 06 11

03 06 50  2007+402     22 04 35  64.7 -60.0  1.9     102.6    -4   1  1     59  03 06 50
03 07 20  ---          22 05 05  64.6 -60.1  2.0     102.5    26   F  1     59  03 06 51

03 07 20  IRAS2012     22 05 05  65.7 -57.7  1.8     105.8    -4   1  1     59  03 07 20
03 08 00  ---          22 05 45  65.5 -57.8  1.9     105.6    36   F  1     60  03 07 21

03 08 00  2007+402     22 05 45  64.5 -60.2  2.0     102.3    -4   1  1     60  03 08 00
03 08 30  ---          22 06 15  64.4 -60.2  2.0     102.2    26   F  1     60  03 08 01

03 08 30  IRAS2012     22 06 15  65.4 -57.8  1.9     105.4    -4   1  1     60  03 08 30
03 09 10  ---          22 06 56  65.3 -57.9  1.9     105.3    36   F  1     61  03 08 31

03 09 10  2007+402     22 06 56  64.3 -60.3  2.0     102.0    -4   1  1     61  03 09 10
03 09 40  ---          22 07 26  64.2 -60.3  2.0     101.9    26   F  1     62  03 09 11

03 09 40  IRAS2012     22 07 26  65.2 -58.0  1.9     105.1    -4   1  1     62  03 09 40
03 10 20  ---          22 08 06  65.1 -58.0  1.9     104.9    36   F  1     62  03 09 41

03 10 20  2007+402     22 08 06  64.1 -60.4  2.0     101.7    -4   1  1     62  03 10 20
03 10 50  ---          22 08 36  64.0 -60.4  2.0     101.6    26   F  1     63  03 10 21

03 10 50  IRAS2012     22 08 36  65.0 -58.1  1.9     104.8    -4   1  1     63  03 10 50
03 11 30  ---          22 09 16  64.9 -58.2  1.9     104.6    36   F  1     63  03 10 51

03 11 30  2007+402     22 09 16  63.8 -60.5  2.0     101.5    -4   1  1     63  03 11 30
03 12 00  ---          22 09 46  63.7 -60.5  2.0     101.3    26   F  1     64  03 11 31

03 12 00  IRAS2012     22 09 46  64.8 -58.2  1.9     104.5    -4   1  1     64  03 12 00
03 12 40  ---          22 10 26  64.7 -58.3  1.9     104.3    36   F  1     65  03 12 01

03 12 40  2007+402     22 10 26  63.6 -60.6  2.0     101.2    -4   1  1     65  03 12 40
03 13 10  ---          22 10 56  63.5 -60.6  2.0     101.1    26   F  1     65  03 12 41

03 13 10  IRAS2012     22 10 56  64.6 -58.4  1.9     104.2    -4   1  1     65  03 13 10
03 13 50  ---          22 11 36  64.5 -58.4  1.9     104.0    36   F  1     66  03 13 11

03 13 50  2007+402     22 11 36  63.4 -60.7  2.1     100.9    -4   1  1     66  03 13 50
03 14 20  ---          22 12 06  63.3 -60.7  2.1     100.8    26   F  1     66  03 13 51

03 14 20  IRAS2012     22 12 06  64.4 -58.5  2.0     103.9    -4   1  1     66  03 14 20
03 15 00  ---          22 12 47  64.3 -58.5  2.0     103.7    36   F  1     67  03 14 21
Schedule for SHANGHAI  (Code Sh )                                   Page   9
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

03 15 00  2007+402     22 12 47  63.2 -60.8  2.1     100.6    -4   1  1     67  03 15 00
03 15 30  ---          22 13 17  63.1 -60.8  2.1     100.5    26   F  1     67  03 15 01

03 15 30  IRAS2012     22 13 17  64.2 -58.6  2.0     103.6    -4   1  1     67  03 15 30
03 16 10  ---          22 13 57  64.0 -58.7  2.0     103.4    36   F  1     68  03 15 31

03 16 10  2007+402     22 13 57  63.0 -60.9  2.1     100.4    -4   1  1     68  03 16 10
03 16 40  ---          22 14 27  62.9 -60.9  2.1     100.2    26   F  1     68  03 16 11

03 16 40  IRAS2012     22 14 27  64.0 -58.7  2.0     103.3    -4   1  1     68  03 16 40
03 17 20  ---          22 15 07  63.8 -58.8  2.0     103.1    36   F  1     69  03 16 41

03 17 20  2007+402     22 15 07  62.7 -60.9  2.1     100.1    -4   1  1     69  03 17 20
03 17 50  ---          22 15 37  62.6 -61.0  2.1     100.0    26   F  1     70  03 17 21

03 18 50  2007+402     22 16 37  62.5 -61.0  2.1      99.8    58   1  1     70  03 18 50
03 20 00  ---          22 17 47  62.2 -61.1  2.2      99.5    70   F  1     71  03 18 51

03 20 00  IRAS2012     22 17 47  63.3 -59.0  2.1     102.4    -4   1  1     71  03 20 00
03 20 40  ---          22 18 27  63.2 -59.1  2.1     102.3    36   F  1     71  03 20 01

03 20 40  2007+402     22 18 27  62.1 -61.2  2.2      99.3    -4   1  1     71  03 20 40
03 21 20  ---          22 19 08  62.0 -61.2  2.2      99.2    36   F  1     72  03 20 41

03 21 20  IRAS2012     22 19 08  63.1 -59.2  2.1     102.1    -4   1  1     72  03 21 20
03 22 00  ---          22 19 48  63.0 -59.2  2.1     102.0    36   F  1     73  03 21 21

03 22 00  2007+402     22 19 48  61.9 -61.3  2.2      99.0    -4   1  1     73  03 22 00
03 22 40  ---          22 20 28  61.7 -61.3  2.2      98.9    36   F  1     73  03 22 01

03 22 40  IRAS2012     22 20 28  62.9 -59.3  2.1     101.8    -4   1  1     73  03 22 40
03 23 20  ---          22 21 08  62.7 -59.3  2.1     101.6    36   F  1     74  03 22 41

03 23 20  2007+402     22 21 08  61.6 -61.3  2.2      98.8    -4   1  1     74  03 23 20
03 24 00  ---          22 21 48  61.5 -61.4  2.2      98.6    36   F  1     75  03 23 21

03 24 00  IRAS2012     22 21 48  62.6 -59.4  2.1     101.5    -4   1  1     75  03 24 00
03 24 40  ---          22 22 28  62.5 -59.4  2.1     101.3    36   F  1     75  03 24 01

03 24 40  2007+402     22 22 28  61.4 -61.4  2.2      98.5    -4   1  1     75  03 24 40
03 25 20  ---          22 23 08  61.2 -61.5  2.3      98.3    36   F  1     76  03 24 41

03 25 20  IRAS2012     22 23 08  62.4 -59.5  2.1     101.2    -4   1  1     76  03 25 20
03 26 00  ---          22 23 48  62.2 -59.5  2.2     101.0    36   F  1     76  03 25 21
Schedule for SHANGHAI  (Code Sh )                                   Page  10
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

03 26 00  2007+402     22 23 48  61.1 -61.5  2.3      98.2    -4   1  1     76  03 26 00
03 26 40  ---          22 24 28  61.0 -61.5  2.3      98.0    36   F  1     77  03 26 01

03 26 40  IRAS2012     22 24 28  62.1 -59.6  2.2     100.9    -4   1  1     77  03 26 40
03 27 20  ---          22 25 09  62.0 -59.6  2.2     100.7    36   F  1     78  03 26 41

03 27 20  2007+402     22 25 09  60.9 -61.6  2.3      97.9    -4   1  1     78  03 27 20
03 28 00  ---          22 25 49  60.7 -61.6  2.3      97.8    36   F  1     78  03 27 21

03 28 00  IRAS2012     22 25 49  61.9 -59.7  2.2     100.5    -4   1  1     78  03 28 00
03 28 40  ---          22 26 29  61.7 -59.7  2.2     100.4    36   F  1     79  03 28 01

03 28 40  2007+402     22 26 29  60.6 -61.6  2.3      97.6    -4   1  1     79  03 28 40
03 29 20  ---          22 27 09  60.5 -61.7  2.3      97.5    36   F  1     80  03 28 41

03 29 20  IRAS2012     22 27 09  61.6 -59.8  2.2     100.2    -4   1  1     80  03 29 20
03 30 00  ---          22 27 49  61.5 -59.8  2.2     100.1    36   F  1     80  03 29 21

03 30 00  2007+402     22 27 49  60.4 -61.7  2.3      97.4    -4   1  1     80  03 30 00
03 30 40  ---          22 28 29  60.2 -61.7  2.3      97.2    36   F  1     81  03 30 01

03 30 40  IRAS2012     22 28 29  61.4 -59.9  2.2      99.9    -4   1  1     81  03 30 40
03 31 20  ---          22 29 09  61.2 -59.9  2.2      99.8    36   F  1     82  03 30 41

03 31 20  2007+402     22 29 09  60.1 -61.8  2.4      97.1    -4   1  1     82  03 31 20
03 32 00  ---          22 29 49  60.0 -61.8  2.4      96.9    36   F  1     82  03 31 21

03 32 00  IRAS2012     22 29 49  61.1 -60.0  2.3      99.6    -4   1  1     82  03 32 00
03 32 40  ---          22 30 29  61.0 -60.0  2.3      99.5    36   F  1     83  03 32 01

03 32 40  2007+402     22 30 29  59.9 -61.8  2.4      96.8    -4   1  1     83  03 32 40
03 33 20  ---          22 31 10  59.7 -61.9  2.4      96.7    36   F  1     84  03 32 41

03 33 20  IRAS2012     22 31 10  60.9 -60.0  2.3      99.3    -4   1  1     84  03 33 20
03 34 00  ---          22 31 50  60.8 -60.1  2.3      99.2    36   F  1     84  03 33 21

03 34 00  2007+402     22 31 50  59.6 -61.9  2.4      96.5    -4   1  1     84  03 34 00
03 34 40  ---          22 32 30  59.5 -61.9  2.4      96.4    36   F  1     85  03 34 01

03 34 40  IRAS2012     22 32 30  60.6 -60.1  2.3      99.1    -4   1  1     85  03 34 40
03 35 20  ---          22 33 10  60.5 -60.2  2.3      98.9    36   F  1     85  03 34 41

03 35 20  2007+402     22 33 10  59.3 -61.9  2.4      96.3    -4   1  1     85  03 35 20
03 36 00  ---          22 33 50  59.2 -62.0  2.4      96.1    36   F  1     86  03 35 21
Schedule for SHANGHAI  (Code Sh )                                   Page  11
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

03 36 00  IRAS2012     22 33 50  60.4 -60.2  2.3      98.8    -4   1  1     86  03 36 00
03 36 40  ---          22 34 30  60.3 -60.2  2.3      98.6    36   F  1     87  03 36 01

03 36 40  2007+402     22 34 30  59.1 -62.0  2.4      96.0    -4   1  1     87  03 36 40
03 37 20  ---          22 35 10  59.0 -62.0  2.5      95.9    36   F  1     87  03 36 41

03 37 20  IRAS2012     22 35 10  60.1 -60.3  2.3      98.5    -4   1  1     87  03 37 20
03 38 00  ---          22 35 50  60.0 -60.3  2.4      98.3    36   F  1     88  03 37 21

03 38 00  2007+402     22 35 50  58.8 -62.1  2.5      95.8    -4   1  1     88  03 38 00
03 38 40  ---          22 36 30  58.7 -62.1  2.5      95.6    36   F  1     89  03 38 01

03 38 40  IRAS2012     22 36 30  59.9 -60.4  2.4      98.2    -4   1  1     89  03 38 40
03 39 20  ---          22 37 11  59.8 -60.4  2.4      98.1    36   F  1     89  03 38 41

03 39 20  2007+402     22 37 11  58.6 -62.1  2.5      95.5    -4   1  1     89  03 39 20
03 40 00  ---          22 37 51  58.5 -62.1  2.5      95.4    36   F  1     90  03 39 21

03 41 00  2002+472     22 38 51  56.1 -49.9  2.6     104.5    46   1  1     90  03 41 00
03 44 00  ---          22 41 51  55.6 -50.1  2.7     103.8   180   F  1     93  03 41 01

03 45 00  2007+402     22 42 51  57.5 -62.3  2.6      94.4    46   1  1     93  03 45 00
03 46 00  ---          22 43 52  57.3 -62.3  2.6      94.2    60   F  1     94  03 45 01

03 46 00  IRAS2012     22 43 52  58.5 -60.7  2.5      96.7    -4   1  1     94  03 46 00
03 46 40  ---          22 44 32  58.4 -60.7  2.5      96.5    36   F  1     95  03 46 01

03 46 40  2007+402     22 44 32  57.2 -62.3  2.6      94.1    -4   1  1     95  03 46 40
03 47 10  ---          22 45 02  57.1 -62.3  2.6      94.0    26   F  1     95  03 46 41

03 47 10  IRAS2012     22 45 02  58.3 -60.8  2.5      96.4    -4   1  1     95  03 47 10
03 47 50  ---          22 45 42  58.2 -60.8  2.5      96.3    36   F  1     96  03 47 11

03 47 50  2007+402     22 45 42  57.0 -62.3  2.6      93.9    -4   1  1     96  03 47 50
03 48 20  ---          22 46 12  56.9 -62.4  2.6      93.8    26   F  1     96  03 47 51

03 48 20  IRAS2012     22 46 12  58.1 -60.8  2.5      96.2    -4   1  1     96  03 48 20
03 49 00  ---          22 46 52  58.0 -60.8  2.5      96.1    36   F  1     97  03 48 21

03 49 00  2007+402     22 46 52  56.8 -62.4  2.6      93.7    -4   1  1     97  03 49 00
03 49 30  ---          22 47 22  56.7 -62.4  2.7      93.6    26   F  1     97  03 49 01

03 49 30  IRAS2012     22 47 22  57.9 -60.8  2.5      96.0    -4   1  1     97  03 49 30
03 50 10  ---          22 48 02  57.7 -60.9  2.6      95.9    36   F  1     98  03 49 31
Schedule for SHANGHAI  (Code Sh )                                   Page  12
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

03 50 10  2007+402     22 48 02  56.5 -62.4  2.7      93.5    -4   1  1     98  03 50 10
03 50 40  ---          22 48 32  56.4 -62.4  2.7      93.4    26   F  1     98  03 50 11

03 50 40  IRAS2012     22 48 32  57.6 -60.9  2.6      95.8    -4   1  1     98  03 50 40
03 51 20  ---          22 49 13  57.5 -60.9  2.6      95.6    36   F  1     99  03 50 41

03 51 20  2007+402     22 49 13  56.3 -62.4  2.7      93.3    -4   1  1     99  03 51 20
03 51 50  ---          22 49 43  56.2 -62.4  2.7      93.2    26   F  1    100  03 51 21

03 51 50  IRAS2012     22 49 43  57.4 -60.9  2.6      95.5    -4   1  1    100  03 51 50
03 52 30  ---          22 50 23  57.3 -60.9  2.6      95.4    36   F  1    100  03 51 51

03 52 30  2007+402     22 50 23  56.1 -62.4  2.7      93.1    -4   1  1    100  03 52 30
03 53 00  ---          22 50 53  56.0 -62.5  2.7      93.0    26   F  1    101  03 52 31

03 53 00  IRAS2012     22 50 53  57.2 -61.0  2.6      95.3    -4   1  1    101  03 53 00
03 53 40  ---          22 51 33  57.1 -61.0  2.6      95.2    36   F  1    101  03 53 01

03 53 40  2007+402     22 51 33  55.9 -62.5  2.7      92.9    -4   1  1    101  03 53 40
03 54 10  ---          22 52 03  55.8 -62.5  2.7      92.8    26   F  1    102  03 53 41

03 54 10  IRAS2012     22 52 03  57.0 -61.0  2.6      95.1    -4   1  1    102  03 54 10
03 54 50  ---          22 52 43  56.9 -61.0  2.6      95.0    36   F  1    102  03 54 11

03 54 50  2007+402     22 52 43  55.6 -62.5  2.7      92.6    -4   1  1    102  03 54 50
03 55 20  ---          22 53 13  55.5 -62.5  2.8      92.6    26   F  1    103  03 54 51

03 55 20  IRAS2012     22 53 13  56.8 -61.0  2.6      94.9    -4   1  1    103  03 55 20
03 56 00  ---          22 53 53  56.6 -61.1  2.7      94.7    36   F  1    104  03 55 21

03 56 00  2007+402     22 53 53  55.4 -62.5  2.8      92.4    -4   1  1    104  03 56 00
03 56 30  ---          22 54 23  55.3 -62.5  2.8      92.4    26   F  1    104  03 56 01

03 56 30  IRAS2012     22 54 23  56.5 -61.1  2.7      94.6    -4   1  1    104  03 56 30
03 57 10  ---          22 55 03  56.4 -61.1  2.7      94.5    36   F  1    105  03 56 31

03 57 10  2007+402     22 55 03  55.2 -62.5  2.8      92.2    -4   1  1    105  03 57 10
03 57 40  ---          22 55 34  55.1 -62.5  2.8      92.2    26   F  1    105  03 57 11

03 57 40  IRAS2012     22 55 34  56.3 -61.1  2.7      94.4    -4   1  1    105  03 57 40
03 58 20  ---          22 56 14  56.2 -61.1  2.7      94.3    36   F  1    106  03 57 41

03 58 20  2007+402     22 56 14  55.0 -62.5  2.8      92.0    -4   1  1    106  03 58 20
03 58 50  ---          22 56 44  54.9 -62.5  2.8      91.9    26   F  1    106  03 58 21
Schedule for SHANGHAI  (Code Sh )                                   Page  13
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

03 58 50  IRAS2012     22 56 44  56.1 -61.1  2.7      94.2    -4   1  1    106  03 58 50
03 59 30  ---          22 57 24  56.0 -61.1  2.7      94.1    36   F  1    107  03 58 51

03 59 30  2007+402     22 57 24  54.8 -62.5  2.8      91.8    -4   1  1    107  03 59 30
04 00 00  ---          22 57 54  54.7 -62.6  2.8      91.7    26   F  1    107  03 59 31

04 00 00  IRAS2012     22 57 54  55.9 -61.2  2.7      94.0    -4   1  1    107  04 00 00
04 00 40  ---          22 58 34  55.8 -61.2  2.7      93.9    36   F  1    108  04 00 01

04 00 40  2007+402     22 58 34  54.5 -62.6  2.8      91.6    -4   1  1    108  04 00 40
04 01 10  ---          22 59 04  54.4 -62.6  2.9      91.6    26   F  1    109  04 00 41

04 01 10  IRAS2012     22 59 04  55.7 -61.2  2.7      93.8    -4   1  1    109  04 01 10
04 01 50  ---          22 59 44  55.5 -61.2  2.8      93.6    36   F  1    109  04 01 11

04 01 50  2007+402     22 59 44  54.3 -62.6  2.9      91.4    -4   1  1    109  04 01 50
04 02 20  ---          23 00 14  54.2 -62.6  2.9      91.4    26   F  1    110  04 01 51

04 02 20  IRAS2012     23 00 14  55.4 -61.2  2.8      93.6    -4   1  1    110  04 02 20
04 03 00  ---          23 00 54  55.3 -61.2  2.8      93.4    36   F  1    110  04 02 21

04 03 00  2007+402     23 00 54  54.1 -62.6  2.9      91.2    -4   1  1    110  04 03 00
04 03 30  ---          23 01 25  54.0 -62.6  2.9      91.2    26   F  1    111  04 03 01

04 03 30  IRAS2012     23 01 25  55.2 -61.2  2.8      93.3    -4   1  1    111  04 03 30
04 04 10  ---          23 02 05  55.1 -61.2  2.8      93.2    36   F  1    111  04 03 31

04 04 10  2007+402     23 02 05  53.9 -62.6  2.9      91.0    -4   1  1    111  04 04 10
04 04 40  ---          23 02 35  53.8 -62.6  2.9      91.0    26   F  1    112  04 04 11

04 04 40  IRAS2012     23 02 35  55.0 -61.3  2.8      93.1    -4   1  1    112  04 04 40
04 05 20  ---          23 03 15  54.9 -61.3  2.8      93.0    36   F  1    113  04 04 41

04 05 20  2007+402     23 03 15  53.6 -62.6  2.9      90.8    -4   1  1    113  04 05 20
04 05 50  ---          23 03 45  53.5 -62.6  2.9      90.8    26   F  1    113  04 05 21

04 07 50  2007+777     23 05 45  39.2 -11.1  3.0     128.4    66   1  1    113  04 07 50
04 10 50  ---          23 08 46  39.0 -11.2  3.1     127.6   180   F  1    116  04 07 51

04 14 10  2007+402     23 12 06  52.0 -62.6  3.1      89.4   147   1  1    116  04 14 10
04 15 20  ---          23 13 16  51.7 -62.6  3.1      89.2    70   F  1    117  04 14 11

04 15 20  IRAS2012     23 13 16  53.0 -61.4  3.0      91.3    -4   1  1    117  04 15 20
04 16 00  ---          23 13 57  52.9 -61.4  3.0      91.2    36   F  1    118  04 15 21
Schedule for SHANGHAI  (Code Sh )                                   Page  14
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

04 16 00  2007+402     23 13 57  51.6 -62.6  3.1      89.1    -4   1  1    118  04 16 00
04 16 40  ---          23 14 37  51.5 -62.6  3.1      89.0    36   F  1    118  04 16 01

04 16 40  IRAS2012     23 14 37  52.7 -61.4  3.0      91.0    -4   1  1    118  04 16 40
04 17 20  ---          23 15 17  52.6 -61.4  3.0      90.9    36   F  1    119  04 16 41

04 17 20  2007+402     23 15 17  51.4 -62.6  3.1      88.9    -4   1  1    119  04 17 20
04 18 00  ---          23 15 57  51.2 -62.6  3.1      88.8    36   F  1    120  04 17 21

04 18 00  IRAS2012     23 15 57  52.5 -61.4  3.0      90.8    -4   1  1    120  04 18 00
04 18 40  ---          23 16 37  52.4 -61.4  3.0      90.7    36   F  1    120  04 18 01

04 18 40  2007+402     23 16 37  51.1 -62.6  3.1      88.7    -4   1  1    120  04 18 40
04 19 20  ---          23 17 17  51.0 -62.6  3.2      88.6    36   F  1    121  04 18 41

04 19 20  IRAS2012     23 17 17  52.2 -61.4  3.0      90.6    -4   1  1    121  04 19 20
04 20 00  ---          23 17 57  52.1 -61.4  3.1      90.5    36   F  1    122  04 19 21

04 20 00  2007+402     23 17 57  50.8 -62.6  3.2      88.5    -4   1  1    122  04 20 00
04 20 40  ---          23 18 37  50.7 -62.6  3.2      88.4    36   F  1    122  04 20 01

04 20 40  IRAS2012     23 18 37  52.0 -61.4  3.1      90.4    -4   1  1    122  04 20 40
04 21 20  ---          23 19 17  51.9 -61.4  3.1      90.3    36   F  1    123  04 20 41

04 21 20  2007+402     23 19 17  50.6 -62.6  3.2      88.3    -4   1  1    123  04 21 20
04 22 00  ---          23 19 58  50.5 -62.5  3.2      88.2    36   F  1    124  04 21 21

04 22 00  IRAS2012     23 19 58  51.7 -61.4  3.1      90.1    -4   1  1    124  04 22 00
04 22 40  ---          23 20 38  51.6 -61.4  3.1      90.0    36   F  1    124  04 22 01

04 22 40  2007+402     23 20 38  50.3 -62.5  3.2      88.1    -4   1  1    124  04 22 40
04 23 20  ---          23 21 18  50.2 -62.5  3.2      88.0    36   F  1    125  04 22 41

04 23 20  IRAS2012     23 21 18  51.5 -61.4  3.1      89.9    -4   1  1    125  04 23 20
04 24 00  ---          23 21 58  51.4 -61.4  3.1      89.8    36   F  1    125  04 23 21

04 24 00  2007+402     23 21 58  50.1 -62.5  3.2      87.9    -4   1  1    125  04 24 00
04 24 40  ---          23 22 38  50.0 -62.5  3.2      87.8    36   F  1    126  04 24 01

04 24 40  IRAS2012     23 22 38  51.2 -61.4  3.1      89.7    -4   1  1    126  04 24 40
04 25 20  ---          23 23 18  51.1 -61.4  3.1      89.6    36   F  1    127  04 24 41

04 25 20  2007+402     23 23 18  49.8 -62.5  3.3      87.7    -4   1  1    127  04 25 20
04 26 00  ---          23 23 58  49.7 -62.5  3.3      87.6    36   F  1    127  04 25 21
Schedule for SHANGHAI  (Code Sh )                                   Page  15
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

04 26 00  2015+3710    23 23 58  51.0 -67.8  3.1      84.7    -7   1  1    127  04 26 00
04 26 55  ---          23 24 53  50.8 -67.8  3.2      84.5    48   F  1    128  04 26 01

04 26 55  IRAS2012     23 24 53  50.8 -61.4  3.2      89.3    -8   1  1    128  04 26 55
04 27 50  ---          23 25 49  50.6 -61.4  3.2      89.2    47   F  1    129  04 26 56

04 27 50  2007+402     23 25 49  49.4 -62.5  3.3      87.3    -4   1  1    129  04 27 50
04 28 20  ---          23 26 19  49.3 -62.5  3.3      87.2    26   F  1    130  04 27 51

04 28 20  2015+3710    23 26 19  50.5 -67.8  3.2      84.4    -7   1  1    130  04 28 20
04 29 15  ---          23 27 14  50.3 -67.7  3.2      84.2    48   F  1    131  04 28 21

04 29 15  IRAS2012     23 27 14  50.4 -61.4  3.2      89.0    -8   1  1    131  04 29 15
04 30 10  ---          23 28 09  50.2 -61.4  3.2      88.8    47   F  1    131  04 29 16

04 30 10  2007+402     23 28 09  48.9 -62.4  3.3      86.9    -4   1  1    131  04 30 10
04 30 40  ---          23 28 39  48.8 -62.4  3.3      86.8    26   F  1    132  04 30 11

04 30 40  2015+3710    23 28 39  50.1 -67.7  3.2      84.1    -7   1  1    132  04 30 40
04 31 35  ---          23 29 34  49.9 -67.7  3.2      83.9    48   F  1    133  04 30 41

04 31 35  IRAS2012     23 29 34  49.9 -61.4  3.2      88.6    -8   1  1    133  04 31 35
04 32 30  ---          23 30 29  49.8 -61.4  3.3      88.4    47   F  1    134  04 31 36

04 32 30  2007+402     23 30 29  48.5 -62.4  3.4      86.6    -4   1  1    134  04 32 30
04 33 00  ---          23 30 59  48.4 -62.4  3.4      86.5    26   F  1    134  04 32 31

04 33 00  2015+3710    23 30 59  49.6 -67.6  3.3      83.8    -7   1  1    134  04 33 00
04 33 55  ---          23 31 55  49.4 -67.6  3.3      83.6    48   F  1    135  04 33 01

04 33 55  IRAS2012     23 31 55  49.5 -61.4  3.3      88.2    -8   1  1    135  04 33 55
04 34 50  ---          23 32 50  49.3 -61.4  3.3      88.1    47   F  1    136  04 33 56

04 34 50  2007+402     23 32 50  48.0 -62.4  3.4      86.2    -4   1  1    136  04 34 50
04 35 20  ---          23 33 20  47.9 -62.4  3.4      86.1    26   F  1    136  04 34 51

04 36 20  2002+472     23 34 20  46.8 -52.1  3.5      92.5    48   1  1    136  04 36 20
04 39 20  ---          23 37 20  46.3 -52.1  3.6      92.0   180   F  1    139  04 36 21

04 40 20  2007+402     23 38 21  47.0 -62.2  3.5      85.4    48   1  1    139  04 40 20
04 41 20  ---          23 39 21  46.8 -62.2  3.5      85.3    60   F  1    140  04 40 21

04 41 20  IRAS2012     23 39 21  48.1 -61.3  3.4      87.1    -4   1  1    140  04 41 20
04 42 00  ---          23 40 01  48.0 -61.3  3.4      87.0    36   F  1    141  04 41 21
Schedule for SHANGHAI  (Code Sh )                                   Page  16
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

04 42 00  2007+402     23 40 01  46.7 -62.2  3.5      85.2    -4   1  1    141  04 42 00
04 42 40  ---          23 40 41  46.5 -62.2  3.5      85.1    36   F  1    142  04 42 01

04 42 40  IRAS2012     23 40 41  47.8 -61.3  3.4      86.8    -4   1  1    142  04 42 40
04 43 20  ---          23 41 21  47.7 -61.2  3.4      86.7    36   F  1    142  04 42 41

04 43 20  2007+402     23 41 21  46.4 -62.2  3.6      85.0    -4   1  1    142  04 43 20
04 44 00  ---          23 42 01  46.3 -62.2  3.6      84.9    36   F  1    143  04 43 21

04 44 00  IRAS2012     23 42 01  47.6 -61.2  3.5      86.6    -4   1  1    143  04 44 00
04 44 40  ---          23 42 41  47.5 -61.2  3.5      86.5    36   F  1    144  04 44 01

04 44 40  2007+402     23 42 41  46.2 -62.1  3.6      84.8    -4   1  1    144  04 44 40
04 45 20  ---          23 43 21  46.0 -62.1  3.6      84.7    36   F  1    144  04 44 41

04 45 20  IRAS2012     23 43 21  47.3 -61.2  3.5      86.4    -4   1  1    144  04 45 20
04 46 00  ---          23 44 02  47.2 -61.2  3.5      86.3    36   F  1    145  04 45 21

04 46 00  2007+402     23 44 02  45.9 -62.1  3.6      84.6    -4   1  1    145  04 46 00
04 46 40  ---          23 44 42  45.8 -62.1  3.6      84.5    36   F  1    145  04 46 01

04 46 40  IRAS2012     23 44 42  47.1 -61.2  3.5      86.2    -4   1  1    145  04 46 40
04 47 20  ---          23 45 22  47.0 -61.2  3.5      86.1    36   F  1    146  04 46 41

04 47 20  2007+402     23 45 22  45.7 -62.1  3.6      84.4    -4   1  1    146  04 47 20
04 48 00  ---          23 46 02  45.5 -62.1  3.6      84.3    36   F  1    147  04 47 21

04 48 00  IRAS2012     23 46 02  46.8 -61.2  3.5      86.0    -4   1  1    147  04 48 00
04 48 40  ---          23 46 42  46.7 -61.1  3.5      85.9    36   F  1    147  04 48 01

04 48 40  2007+402     23 46 42  45.4 -62.0  3.6      84.2    -4   1  1    147  04 48 40
04 49 20  ---          23 47 22  45.3 -62.0  3.7      84.1    36   F  1    148  04 48 41

04 49 20  IRAS2012     23 47 22  46.6 -61.1  3.5      85.8    -4   1  1    148  04 49 20
04 50 00  ---          23 48 02  46.5 -61.1  3.6      85.7    36   F  1    149  04 49 21

04 50 00  2007+402     23 48 02  45.1 -62.0  3.7      84.0    -4   1  1    149  04 50 00
04 50 40  ---          23 48 42  45.0 -62.0  3.7      83.9    36   F  1    149  04 50 01

04 50 40  IRAS2012     23 48 42  46.3 -61.1  3.6      85.6    -4   1  1    149  04 50 40
04 51 20  ---          23 49 22  46.2 -61.1  3.6      85.5    36   F  1    150  04 50 41

04 51 20  2007+402     23 49 22  44.9 -62.0  3.7      83.8    -4   1  1    150  04 51 20
04 52 00  ---          23 50 02  44.8 -61.9  3.7      83.7    36   F  1    151  04 51 21
Schedule for SHANGHAI  (Code Sh )                                   Page  17
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

04 52 00  2015+3710    23 50 02  45.8 -66.9  3.6      81.4    -7   1  1    151  04 52 00
04 52 55  ---          23 50 58  45.7 -66.9  3.6      81.3    48   F  1    152  04 52 01

04 52 55  IRAS2012     23 50 58  45.9 -61.1  3.6      85.3    -8   1  1    152  04 52 55
04 53 50  ---          23 51 53  45.7 -61.0  3.6      85.2    47   F  1    152  04 52 56

04 53 50  2007+402     23 51 53  44.4 -61.9  3.7      83.5    -4   1  1    152  04 53 50
04 54 20  ---          23 52 23  44.3 -61.9  3.7      83.4    26   F  1    153  04 53 51

04 54 20  2015+3710    23 52 23  45.4 -66.8  3.6      81.1    -7   1  1    153  04 54 20
04 55 15  ---          23 53 18  45.2 -66.8  3.6      81.0    48   F  1    154  04 54 21

04 55 15  IRAS2012     23 53 18  45.5 -61.0  3.6      84.9    -8   1  1    154  04 55 15
04 56 10  ---          23 54 13  45.3 -61.0  3.7      84.8    47   F  1    155  04 55 16

04 56 10  2007+402     23 54 13  44.0 -61.8  3.8      83.1    -4   1  1    155  04 56 10
04 56 40  ---          23 54 43  43.9 -61.8  3.8      83.1    26   F  1    155  04 56 11

04 56 40  2015+3710    23 54 43  44.9 -66.7  3.6      80.9    -7   1  1    155  04 56 40
04 57 35  ---          23 55 38  44.7 -66.6  3.7      80.7    48   F  1    156  04 56 41

04 57 35  IRAS2012     23 55 38  45.0 -61.0  3.7      84.6    -8   1  1    156  04 57 35
04 58 30  ---          23 56 34  44.9 -60.9  3.7      84.5    47   F  1    157  04 57 36

04 58 30  2007+402     23 56 34  43.5 -61.7  3.8      82.8    -4   1  1    157  04 58 30
04 59 00  ---          23 57 04  43.4 -61.7  3.8      82.7    26   F  1    157  04 58 31

04 59 00  2015+3710    23 57 04  44.5 -66.6  3.7      80.6    -7   1  1    157  04 59 00
04 59 55  ---          23 57 59  44.3 -66.5  3.7      80.5    48   F  1    158  04 59 01

04 59 55  IRAS2012     23 57 59  44.6 -60.9  3.7      84.3    -8   1  1    158  04 59 55
05 00 50  ---          23 58 54  44.4 -60.9  3.7      84.1    47   F  1    159  04 59 56

05 00 50  2007+402     23 58 54  43.1 -61.7  3.8      82.5    -4   1  1    159  05 00 50
05 01 20  ---          23 59 24  43.0 -61.6  3.9      82.4    26   F  1    160  05 00 51

05 02 20  2007+402     00 00 24  42.8 -61.6  3.9      82.3    58   1  1    160  05 02 20
05 03 20  ---          00 01 24  42.6 -61.6  3.9      82.1    60   F  1    161  05 02 21

05 03 20  IRAS2012     00 01 24  44.0 -60.8  3.8      83.8    -4   1  1    161  05 03 20
05 04 00  ---          00 02 04  43.8 -60.8  3.8      83.7    36   F  1    161  05 03 21

05 04 00  2007+402     00 02 04  42.5 -61.6  3.9      82.0    -4   1  1    161  05 04 00
05 04 40  ---          00 02 45  42.4 -61.5  3.9      81.9    36   F  1    162  05 04 01
Schedule for SHANGHAI  (Code Sh )                                   Page  18
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

05 04 40  IRAS2012     00 02 45  43.7 -60.8  3.8      83.6    -4   1  1    162  05 04 40
05 05 20  ---          00 03 25  43.6 -60.7  3.8      83.5    36   F  1    163  05 04 41

05 05 20  2007+402     00 03 25  42.2 -61.5  3.9      81.9    -4   1  1    163  05 05 20
05 06 00  ---          00 04 05  42.1 -61.5  3.9      81.8    36   F  1    163  05 05 21

05 06 00  IRAS2012     00 04 05  43.5 -60.7  3.8      83.4    -4   1  1    163  05 06 00
05 06 40  ---          00 04 45  43.3 -60.7  3.8      83.3    36   F  1    164  05 06 01

05 06 40  2007+402     00 04 45  42.0 -61.5  3.9      81.7    -4   1  1    164  05 06 40
05 07 20  ---          00 05 25  41.9 -61.4  4.0      81.6    36   F  1    165  05 06 41

05 07 20  IRAS2012     00 05 25  43.2 -60.7  3.8      83.2    -4   1  1    165  05 07 20
05 08 00  ---          00 06 05  43.1 -60.7  3.9      83.1    36   F  1    165  05 07 21

05 08 00  2007+402     00 06 05  41.7 -61.4  4.0      81.5    -4   1  1    165  05 08 00
05 08 40  ---          00 06 45  41.6 -61.4  4.0      81.4    36   F  1    166  05 08 01

05 08 40  IRAS2012     00 06 45  43.0 -60.6  3.9      83.0    -4   1  1    166  05 08 40
05 09 20  ---          00 07 25  42.8 -60.6  3.9      82.9    36   F  1    166  05 08 41

05 09 20  2007+402     00 07 25  41.5 -61.4  4.0      81.3    -4   1  1    166  05 09 20
05 10 00  ---          00 08 05  41.4 -61.3  4.0      81.2    36   F  1    167  05 09 21

05 10 00  IRAS2012     00 08 05  42.7 -60.6  3.9      82.8    -4   1  1    167  05 10 00
05 10 40  ---          00 08 46  42.6 -60.6  3.9      82.7    36   F  1    168  05 10 01

05 10 40  2007+402     00 08 46  41.2 -61.3  4.0      81.1    -4   1  1    168  05 10 40
05 11 20  ---          00 09 26  41.1 -61.3  4.0      81.0    36   F  1    168  05 10 41

05 11 20  IRAS2012     00 09 26  42.5 -60.6  3.9      82.6    -4   1  1    168  05 11 20
05 12 00  ---          00 10 06  42.3 -60.5  3.9      82.5    36   F  1    169  05 11 21

05 12 00  2007+402     00 10 06  41.0 -61.3  4.0      80.9    -4   1  1    169  05 12 00
05 12 40  ---          00 10 46  40.9 -61.2  4.0      80.8    36   F  1    170  05 12 01

05 12 40  IRAS2012     00 10 46  42.2 -60.5  3.9      82.4    -4   1  1    170  05 12 40
05 13 20  ---          00 11 26  42.1 -60.5  3.9      82.3    36   F  1    170  05 12 41

05 13 20  2007+402     00 11 26  40.7 -61.2  4.1      80.8    -4   1  1    170  05 13 20
05 14 00  ---          00 12 06  40.6 -61.2  4.1      80.7    36   F  1    171  05 13 21

05 14 00  2015+3710    00 12 06  41.5 -65.9  3.9      78.8    -7   1  1    171  05 14 00
05 14 55  ---          00 13 01  41.3 -65.8  4.0      78.7    48   F  1    172  05 14 01
Schedule for SHANGHAI  (Code Sh )                                   Page  19
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

05 14 55  IRAS2012     00 13 01  41.8 -60.4  4.0      82.1    -7   1  1    172  05 14 55
05 15 50  ---          00 13 56  41.6 -60.4  4.0      82.0    48   F  1    173  05 14 56

05 15 50  2007+402     00 13 56  40.3 -61.1  4.1      80.4    -4   1  1    173  05 15 50
05 16 20  ---          00 14 26  40.2 -61.1  4.1      80.3    26   F  1    173  05 15 51

05 16 20  2015+3710    00 14 26  41.1 -65.7  4.0      78.5    -7   1  1    173  05 16 20
05 17 15  ---          00 15 22  40.9 -65.7  4.0      78.4    48   F  1    174  05 16 21

05 17 15  IRAS2012     00 15 22  41.4 -60.3  4.0      81.8    -7   1  1    174  05 17 15
05 18 10  ---          00 16 17  41.2 -60.3  4.0      81.6    48   F  1    175  05 17 16

05 18 10  2007+402     00 16 17  39.8 -61.0  4.1      80.1    -4   1  1    175  05 18 10
05 18 40  ---          00 16 47  39.7 -61.0  4.1      80.0    26   F  1    175  05 18 11

05 18 40  2015+3710    00 16 47  40.6 -65.6  4.0      78.3    -7   1  1    175  05 18 40
05 19 35  ---          00 17 42  40.4 -65.6  4.0      78.2    48   F  1    176  05 18 41

05 19 35  IRAS2012     00 17 42  40.9 -60.3  4.0      81.4    -7   1  1    176  05 19 35
05 20 30  ---          00 18 37  40.8 -60.2  4.1      81.3    48   F  1    177  05 19 36

05 20 30  2007+402     00 18 37  39.4 -60.9  4.2      79.8    -4   1  1    177  05 20 30
05 21 00  ---          00 19 07  39.3 -60.9  4.2      79.7    26   F  1    178  05 20 31

05 21 00  2015+3710    00 19 07  40.1 -65.5  4.1      78.0    -7   1  1    178  05 21 00
05 21 55  ---          00 20 02  40.0 -65.4  4.1      77.9    48   F  1    179  05 21 01

05 21 55  IRAS2012     00 20 02  40.5 -60.2  4.1      81.1    -7   1  1    179  05 21 55
05 22 50  ---          00 20 58  40.3 -60.1  4.1      81.0    48   F  1    180  05 21 56

05 22 50  2007+402     00 20 58  39.0 -60.8  4.2      79.5    -4   1  1    180  05 22 50
05 23 20  ---          00 21 28  38.9 -60.8  4.2      79.4    26   F  1    180  05 22 51

05 24 20  2002+472     00 22 28  38.7 -51.8  4.3      83.9    49   1  1    180  05 24 20
05 27 20  ---          00 25 28  38.2 -51.7  4.4      83.4   180   F  1    183  05 24 21

05 28 20  2007+402     00 26 28  37.9 -60.5  4.3      78.7    49   1  1    183  05 28 20
05 29 20  ---          00 27 29  37.7 -60.5  4.3      78.6    60   F  1    184  05 28 21

05 29 20  IRAS2012     00 27 29  39.1 -59.9  4.2      80.1    -4   1  1    184  05 29 20
05 30 00  ---          00 28 09  39.0 -59.8  4.2      80.0    36   F  1    185  05 29 21

05 30 00  2007+402     00 28 09  37.6 -60.5  4.3      78.5    -4   1  1    185  05 30 00
05 30 40  ---          00 28 49  37.5 -60.4  4.3      78.4    36   F  1    185  05 30 01
Schedule for SHANGHAI  (Code Sh )                                   Page  20
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

05 30 40  IRAS2012     00 28 49  38.9 -59.8  4.2      79.9    -4   1  1    185  05 30 40
05 31 20  ---          00 29 29  38.7 -59.8  4.2      79.8    36   F  1    186  05 30 41

05 31 20  2007+402     00 29 29  37.4 -60.4  4.4      78.3    -4   1  1    186  05 31 20
05 32 00  ---          00 30 09  37.2 -60.4  4.4      78.2    36   F  1    186  05 31 21

05 32 00  IRAS2012     00 30 09  38.6 -59.8  4.3      79.7    -4   1  1    186  05 32 00
05 32 40  ---          00 30 49  38.5 -59.7  4.3      79.6    36   F  1    187  05 32 01

05 32 40  2007+402     00 30 49  37.1 -60.3  4.4      78.1    -4   1  1    187  05 32 40
05 33 20  ---          00 31 29  37.0 -60.3  4.4      78.1    36   F  1    188  05 32 41

05 33 20  IRAS2012     00 31 29  38.4 -59.7  4.3      79.5    -4   1  1    188  05 33 20
05 34 00  ---          00 32 09  38.2 -59.7  4.3      79.4    36   F  1    188  05 33 21

05 34 00  2007+402     00 32 09  36.9 -60.3  4.4      78.0    -4   1  1    188  05 34 00
05 34 40  ---          00 32 49  36.7 -60.2  4.4      77.9    36   F  1    189  05 34 01

05 34 40  IRAS2012     00 32 49  38.1 -59.6  4.3      79.3    -4   1  1    189  05 34 40
05 35 20  ---          00 33 30  38.0 -59.6  4.3      79.2    36   F  1    190  05 34 41

05 35 20  2007+402     00 33 30  36.6 -60.2  4.4      77.8    -4   1  1    190  05 35 20
05 36 00  ---          00 34 10  36.5 -60.2  4.4      77.7    36   F  1    190  05 35 21

05 36 00  IRAS2012     00 34 10  37.9 -59.6  4.3      79.1    -4   1  1    190  05 36 00
05 36 40  ---          00 34 50  37.8 -59.6  4.3      79.1    36   F  1    191  05 36 01

05 36 40  2007+402     00 34 50  36.4 -60.1  4.4      77.6    -4   1  1    191  05 36 40
05 37 20  ---          00 35 30  36.2 -60.1  4.5      77.5    36   F  1    192  05 36 41

05 37 20  IRAS2012     00 35 30  37.6 -59.5  4.3      79.0    -4   1  1    192  05 37 20
05 38 00  ---          00 36 10  37.5 -59.5  4.4      78.9    36   F  1    192  05 37 21

05 38 00  2007+402     00 36 10  36.1 -60.1  4.5      77.4    -4   1  1    192  05 38 00
05 38 40  ---          00 36 50  36.0 -60.0  4.5      77.4    36   F  1    193  05 38 01

05 38 40  IRAS2012     00 36 50  37.4 -59.5  4.4      78.8    -4   1  1    193  05 38 40
05 39 20  ---          00 37 30  37.3 -59.4  4.4      78.7    36   F  1    194  05 38 41

05 39 20  2007+402     00 37 30  35.9 -60.0  4.5      77.3    -4   1  1    194  05 39 20
05 40 00  ---          00 38 10  35.8 -60.0  4.5      77.2    36   F  1    194  05 39 21

05 40 00  2015+3710    00 38 10  36.4 -64.4  4.4      75.8    -6   1  1    194  05 40 00
05 40 55  ---          00 39 06  36.3 -64.3  4.4      75.7    49   F  1    195  05 40 01
Schedule for SHANGHAI  (Code Sh )                                   Page  21
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

05 40 55  IRAS2012     00 39 06  37.0 -59.4  4.4      78.5    -7   1  1    195  05 40 55
05 41 50  ---          00 40 01  36.8 -59.3  4.4      78.3    48   F  1    196  05 40 56

05 41 50  2007+402     00 40 01  35.4 -59.9  4.5      76.9    -4   1  1    196  05 41 50
05 42 20  ---          00 40 31  35.3 -59.8  4.5      76.9    26   F  1    196  05 41 51

05 42 20  2015+3710    00 40 31  36.0 -64.2  4.4      75.5    -6   1  1    196  05 42 20
05 43 15  ---          00 41 26  35.8 -64.2  4.4      75.4    49   F  1    197  05 42 21

05 43 15  IRAS2012     00 41 26  36.5 -59.2  4.4      78.2    -7   1  1    197  05 43 15
05 44 10  ---          00 42 21  36.4 -59.2  4.5      78.0    48   F  1    198  05 43 16

05 44 10  2007+402     00 42 21  35.0 -59.7  4.6      76.6    -4   1  1    198  05 44 10
05 44 40  ---          00 42 51  34.9 -59.7  4.6      76.6    26   F  1    199  05 44 11

05 44 40  2015+3710    00 42 51  35.5 -64.1  4.5      75.2    -6   1  1    199  05 44 40
05 45 35  ---          00 43 46  35.4 -64.0  4.5      75.1    49   F  1    200  05 44 41

05 45 35  IRAS2012     00 43 46  36.1 -59.1  4.5      77.8    -7   1  1    200  05 45 35
05 46 30  ---          00 44 41  35.9 -59.1  4.5      77.7    48   F  1    200  05 45 36

05 46 30  2007+402     00 44 41  34.5 -59.6  4.6      76.3    -4   1  1    200  05 46 30
05 47 00  ---          00 45 12  34.5 -59.6  4.6      76.3    26   F  1    201  05 46 31

05 47 00  2015+3710    00 45 12  35.1 -63.9  4.5      75.0    -6   1  1    201  05 47 00
05 47 55  ---          00 46 07  34.9 -63.9  4.5      74.9    49   F  1    202  05 47 01

05 47 55  IRAS2012     00 46 07  35.7 -59.0  4.5      77.5    -7   1  1    202  05 47 55
05 48 50  ---          00 47 02  35.5 -59.0  4.5      77.4    48   F  1    203  05 47 56

05 48 50  2007+402     00 47 02  34.1 -59.5  4.7      76.0    -4   1  1    203  05 48 50
05 49 20  ---          00 47 32  34.0 -59.5  4.7      75.9    26   F  1    203  05 48 51

05 50 20  2007+402     00 48 32  33.8 -59.4  4.7      75.8    58   1  1    203  05 50 20
05 51 20  ---          00 49 32  33.7 -59.3  4.7      75.7    60   F  1    204  05 50 21

05 51 20  IRAS2012     00 49 32  35.1 -58.8  4.6      77.1    -4   1  1    204  05 51 20
05 52 00  ---          00 50 12  34.9 -58.8  4.6      77.0    36   F  1    205  05 51 21

05 52 00  2007+402     00 50 12  33.5 -59.3  4.7      75.6    -4   1  1    205  05 52 00
05 52 40  ---          00 50 52  33.4 -59.3  4.7      75.5    36   F  1    205  05 52 01

05 52 40  IRAS2012     00 50 52  34.8 -58.8  4.6      76.9    -4   1  1    205  05 52 40
05 53 20  ---          00 51 33  34.7 -58.7  4.6      76.8    36   F  1    206  05 52 41
Schedule for SHANGHAI  (Code Sh )                                   Page  22
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

05 53 20  2007+402     00 51 33  33.3 -59.2  4.7      75.4    -4   1  1    206  05 53 20
05 54 00  ---          00 52 13  33.2 -59.2  4.7      75.3    36   F  1    207  05 53 21

05 54 00  IRAS2012     00 52 13  34.6 -58.7  4.6      76.7    -4   1  1    207  05 54 00
05 54 40  ---          00 52 53  34.4 -58.7  4.6      76.6    36   F  1    207  05 54 01

05 54 40  2007+402     00 52 53  33.0 -59.2  4.7      75.2    -4   1  1    207  05 54 40
05 55 20  ---          00 53 33  32.9 -59.1  4.8      75.2    36   F  1    208  05 54 41

05 55 20  IRAS2012     00 53 33  34.3 -58.6  4.6      76.5    -4   1  1    208  05 55 20
05 56 00  ---          00 54 13  34.2 -58.6  4.7      76.4    36   F  1    209  05 55 21

05 56 00  2007+402     00 54 13  32.8 -59.1  4.8      75.1    -4   1  1    209  05 56 00
05 56 40  ---          00 54 53  32.7 -59.0  4.8      75.0    36   F  1    209  05 56 01

05 56 40  IRAS2012     00 54 53  34.1 -58.6  4.7      76.3    -4   1  1    209  05 56 40
05 57 20  ---          00 55 33  34.0 -58.5  4.7      76.2    36   F  1    210  05 56 41

05 57 20  2007+402     00 55 33  32.5 -59.0  4.8      74.9    -4   1  1    210  05 57 20
05 58 00  ---          00 56 13  32.4 -59.0  4.8      74.8    36   F  1    211  05 57 21

05 58 00  IRAS2012     00 56 13  33.8 -58.5  4.7      76.2    -4   1  1    211  05 58 00
05 58 40  ---          00 56 53  33.7 -58.5  4.7      76.1    36   F  1    211  05 58 01

05 58 40  2007+402     00 56 53  32.3 -58.9  4.8      74.7    -4   1  1    211  05 58 40
05 59 20  ---          00 57 34  32.2 -58.9  4.8      74.6    36   F  1    212  05 58 41

05 59 20  IRAS2012     00 57 34  33.6 -58.4  4.7      76.0    -4   1  1    212  05 59 20
06 00 00  ---          00 58 14  33.5 -58.4  4.7      75.9    36   F  1    213  05 59 21

06 00 00  2007+402     00 58 14  32.1 -58.8  4.8      74.5    -4   1  1    213  06 00 00
06 00 40  ---          00 58 54  31.9 -58.8  4.8      74.5    36   F  1    213  06 00 01

06 00 40  IRAS2012     00 58 54  33.3 -58.3  4.7      75.8    -4   1  1    213  06 00 40
06 01 20  ---          00 59 34  33.2 -58.3  4.7      75.7    36   F  1    214  06 00 41

06 01 20  2007+402     00 59 34  31.8 -58.8  4.9      74.4    -4   1  1    214  06 01 20
06 02 00  ---          01 00 14  31.7 -58.7  4.9      74.3    36   F  1    215  06 01 21

06 02 00  IRAS2012     01 00 14  33.1 -58.3  4.8      75.6    -4   1  1    215  06 02 00
06 02 40  ---          01 00 54  33.0 -58.2  4.8      75.5    36   F  1    215  06 02 01

06 02 40  2007+402     01 00 54  31.6 -58.7  4.9      74.2    -4   1  1    215  06 02 40
06 03 20  ---          01 01 34  31.4 -58.6  4.9      74.1    36   F  1    216  06 02 41
Schedule for SHANGHAI  (Code Sh )                                   Page  23
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

06 03 20  IRAS2012     01 01 34  32.9 -58.2  4.8      75.4    -4   1  1    216  06 03 20
06 04 00  ---          01 02 14  32.7 -58.2  4.8      75.3    36   F  1    216  06 03 21

06 04 00  2007+402     01 02 14  31.3 -58.6  4.9      74.0    -4   1  1    216  06 04 00
06 04 40  ---          01 02 54  31.2 -58.6  4.9      73.9    36   F  1    217  06 04 01

06 04 40  IRAS2012     01 02 54  32.6 -58.1  4.8      75.3    -4   1  1    217  06 04 40
06 05 20  ---          01 03 35  32.5 -58.1  4.8      75.2    36   F  1    218  06 04 41

06 05 20  2007+402     01 03 35  31.1 -58.5  4.9      73.8    -4   1  1    218  06 05 20
06 06 00  ---          01 04 15  31.0 -58.5  4.9      73.8    36   F  1    218  06 05 21

06 06 00  IRAS2012     01 04 15  32.4 -58.0  4.8      75.1    -4   1  1    218  06 06 00
06 06 40  ---          01 04 55  32.2 -58.0  4.8      75.0    36   F  1    219  06 06 01

06 06 40  2007+402     01 04 55  30.8 -58.4  4.9      73.7    -4   1  1    219  06 06 40
06 07 20  ---          01 05 35  30.7 -58.4  5.0      73.6    36   F  1    220  06 06 41

06 07 20  IRAS2012     01 05 35  32.1 -58.0  4.8      74.9    -4   1  1    220  06 07 20
06 08 00  ---          01 06 15  32.0 -57.9  4.9      74.8    36   F  1    220  06 07 21

06 08 00  2007+402     01 06 15  30.6 -58.3  5.0      73.5    -4   1  1    220  06 08 00
06 08 40  ---          01 06 55  30.5 -58.3  5.0      73.4    36   F  1    221  06 08 01

06 08 40  IRAS2012     01 06 55  31.9 -57.9  4.9      74.7    -4   1  1    221  06 08 40
06 09 20  ---          01 07 35  31.8 -57.9  4.9      74.6    36   F  1    222  06 08 41

06 09 20  2007+402     01 07 35  30.3 -58.3  5.0      73.3    -4   1  1    222  06 09 20
06 10 00  ---          01 08 15  30.2 -58.2  5.0      73.2    36   F  1    222  06 09 21

06 10 00  IRAS2012     01 08 15  31.6 -57.8  4.9      74.5    -4   1  1    222  06 10 00
06 10 40  ---          01 08 55  31.5 -57.8  4.9      74.4    36   F  1    223  06 10 01

06 10 40  2007+402     01 08 55  30.1 -58.2  5.0      73.1    -4   1  1    223  06 10 40
06 11 20  ---          01 09 36  30.0 -58.1  5.0      73.1    36   F  1    224  06 10 41

06 11 20  IRAS2012     01 09 36  31.4 -57.7  4.9      74.4    -4   1  1    224  06 11 20
06 12 00  ---          01 10 16  31.3 -57.7  4.9      74.3    36   F  1    224  06 11 21

06 12 00  2007+402     01 10 16  29.9 -58.1  5.0      73.0    -4   1  1    224  06 12 00
06 12 40  ---          01 10 56  29.7 -58.1  5.0      72.9    36   F  1    225  06 12 01

06 12 40  IRAS2012     01 10 56  31.2 -57.7  4.9      74.2    -4   1  1    225  06 12 40
06 13 20  ---          01 11 36  31.0 -57.6  4.9      74.1    36   F  1    225  06 12 41
Schedule for SHANGHAI  (Code Sh )                                   Page  24
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

06 13 20  2007+402     01 11 36  29.6 -58.0  5.1      72.8    -4   1  1    225  06 13 20
06 14 00  ---          01 12 16  29.5 -58.0  5.1      72.7    36   F  1    226  06 13 21

06 15 00  2002+472     01 13 16  30.2 -49.9  5.2      75.6    50   1  1    226  06 15 00
06 18 00  ---          01 16 17  29.8 -49.8  5.2      75.1   180   F  1    229  06 15 01

06 19 00  2007+402     01 17 17  28.6 -57.6  5.2      72.1    50   1  1    229  06 19 00
06 20 00  ---          01 18 17  28.4 -57.6  5.2      71.9    60   F  1    230  06 19 01

06 20 00  IRAS2012     01 18 17  29.8 -57.2  5.1      73.2    -4   1  1    230  06 20 00
06 20 45  ---          01 19 02  29.7 -57.2  5.1      73.1    41   F  1    231  06 20 01

06 20 45  2007+402     01 19 02  28.3 -57.5  5.2      71.8    -4   1  1    231  06 20 45
06 21 25  ---          01 19 42  28.1 -57.5  5.2      71.7    36   F  1    231  06 20 46

06 21 25  IRAS2012     01 19 42  29.6 -57.1  5.1      73.0    -4   1  1    231  06 21 25
06 22 10  ---          01 20 27  29.4 -57.1  5.1      72.9    41   F  1    232  06 21 26

06 22 10  2007+402     01 20 27  28.0 -57.4  5.2      71.6    -4   1  1    232  06 22 10
06 22 50  ---          01 21 07  27.9 -57.4  5.2      71.6    36   F  1    233  06 22 11

06 22 50  IRAS2012     01 21 07  29.3 -57.0  5.1      72.8    -4   1  1    233  06 22 50
06 23 35  ---          01 21 53  29.2 -57.0  5.1      72.7    41   F  1    233  06 22 51

06 23 35  2007+402     01 21 53  27.8 -57.3  5.2      71.5    -4   1  1    233  06 23 35
06 24 15  ---          01 22 33  27.6 -57.3  5.2      71.4    36   F  1    234  06 23 36

06 24 15  IRAS2012     01 22 33  29.1 -56.9  5.1      72.6    -4   1  1    234  06 24 15
06 25 00  ---          01 23 18  28.9 -56.9  5.1      72.5    41   F  1    235  06 24 16

06 25 00  2007+402     01 23 18  27.5 -57.2  5.3      71.3    -4   1  1    235  06 25 00
06 25 40  ---          01 23 58  27.4 -57.2  5.3      71.2    36   F  1    235  06 25 01

06 25 40  IRAS2012     01 23 58  28.8 -56.8  5.2      72.4    -4   1  1    235  06 25 40
06 26 25  ---          01 24 43  28.7 -56.8  5.2      72.3    41   F  1    236  06 25 41

06 26 25  2007+402     01 24 43  27.2 -57.1  5.3      71.1    -4   1  1    236  06 26 25
06 27 05  ---          01 25 23  27.1 -57.1  5.3      71.0    36   F  1    237  06 26 26

06 27 05  IRAS2012     01 25 23  28.6 -56.7  5.2      72.2    -4   1  1    237  06 27 05
06 27 50  ---          01 26 08  28.4 -56.7  5.2      72.1    41   F  1    238  06 27 06

06 27 50  2007+402     01 26 08  27.0 -57.0  5.3      70.9    -4   1  1    238  06 27 50
06 28 30  ---          01 26 48  26.9 -57.0  5.3      70.8    36   F  1    238  06 27 51
Schedule for SHANGHAI  (Code Sh )                                   Page  25
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

06 28 30  IRAS2012     01 26 48  28.3 -56.7  5.2      72.1    -4   1  1    238  06 28 30
06 29 15  ---          01 27 33  28.2 -56.6  5.2      72.0    41   F  1    239  06 28 31

06 29 15  2007+402     01 27 33  26.7 -56.9  5.3      70.7    -4   1  1    239  06 29 15
06 29 55  ---          01 28 14  26.6 -56.9  5.3      70.6    36   F  1    240  06 29 16

06 29 55  IRAS2012     01 28 14  28.0 -56.6  5.2      71.9    -4   1  1    240  06 29 55
06 30 40  ---          01 28 59  27.9 -56.5  5.2      71.8    41   F  1    240  06 29 56

06 30 40  2007+402     01 28 59  26.5 -56.8  5.3      70.5    -4   1  1    240  06 30 40
06 31 20  ---          01 29 39  26.4 -56.8  5.4      70.4    36   F  1    241  06 30 41

06 31 20  IRAS2012     01 29 39  27.8 -56.5  5.2      71.7    -4   1  1    241  06 31 20
06 32 05  ---          01 30 24  27.7 -56.4  5.3      71.6    41   F  1    242  06 31 21

06 32 05  2007+402     01 30 24  26.2 -56.7  5.4      70.3    -4   1  1    242  06 32 05
06 32 45  ---          01 31 04  26.1 -56.7  5.4      70.3    36   F  1    242  06 32 06

06 32 45  IRAS2012     01 31 04  27.5 -56.4  5.3      71.5    -4   1  1    242  06 32 45
06 33 30  ---          01 31 49  27.4 -56.3  5.3      71.4    41   F  1    243  06 32 46

06 33 30  2007+402     01 31 49  26.0 -56.6  5.4      70.2    -4   1  1    243  06 33 30
06 34 10  ---          01 32 29  25.9 -56.6  5.4      70.1    36   F  1    244  06 33 31

06 34 10  IRAS2012     01 32 29  27.3 -56.3  5.3      71.3    -4   1  1    244  06 34 10
06 34 55  ---          01 33 14  27.2 -56.2  5.3      71.2    41   F  1    244  06 34 11

06 34 55  2007+402     01 33 14  25.7 -56.5  5.4      70.0    -4   1  1    244  06 34 55
06 35 35  ---          01 33 55  25.6 -56.5  5.4      69.9    36   F  1    245  06 34 56

06 35 35  IRAS2012     01 33 55  27.0 -56.2  5.3      71.1    -4   1  1    245  06 35 35
06 36 20  ---          01 34 40  26.9 -56.1  5.3      71.0    41   F  1    246  06 35 36

06 36 20  2007+402     01 34 40  25.5 -56.4  5.4      69.8    -4   1  1    246  06 36 20
06 37 00  ---          01 35 20  25.3 -56.4  5.5      69.7    36   F  1    246  06 36 21

06 37 00  IRAS2012     01 35 20  26.8 -56.1  5.3      70.9    -4   1  1    246  06 37 00
06 37 45  ---          01 36 05  26.6 -56.0  5.4      70.8    41   F  1    247  06 37 01

06 37 45  2007+402     01 36 05  25.2 -56.3  5.5      69.6    -4   1  1    247  06 37 45
06 38 25  ---          01 36 45  25.1 -56.3  5.5      69.5    36   F  1    248  06 37 46

06 38 25  IRAS2012     01 36 45  26.5 -56.0  5.4      70.7    -4   1  1    248  06 38 25
06 39 10  ---          01 37 30  26.4 -55.9  5.4      70.6    41   F  1    249  06 38 26
Schedule for SHANGHAI  (Code Sh )                                   Page  26
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

06 39 10  2007+402     01 37 30  25.0 -56.2  5.5      69.4    -4   1  1    249  06 39 10
06 39 50  ---          01 38 10  24.8 -56.2  5.5      69.3    36   F  1    249  06 39 11

06 39 50  IRAS2012     01 38 10  26.3 -55.9  5.4      70.5    -4   1  1    249  06 39 50
06 40 35  ---          01 38 55  26.1 -55.8  5.4      70.4    41   F  1    250  06 39 51

06 40 35  2007+402     01 38 55  24.7 -56.1  5.5      69.2    -4   1  1    250  06 40 35
06 41 15  ---          01 39 35  24.6 -56.1  5.5      69.1    36   F  1    251  06 40 36

06 43 15  2007+777     01 41 36  31.6 -14.2  5.6      88.5    76   1  1    251  06 43 15
06 46 15  ---          01 44 36  31.4 -14.2  5.7      87.8   180   F  1    253  06 43 16

06 48 15  2007+402     01 46 37  23.3 -55.5  5.6      68.2    77   1  1    253  06 48 15
06 49 15  ---          01 47 37  23.2 -55.5  5.7      68.1    60   F  1    254  06 48 16

06 49 15  IRAS2012     01 47 37  24.6 -55.2  5.5      69.3    -4   1  1    254  06 49 15
06 50 05  ---          01 48 27  24.5 -55.1  5.6      69.2    46   F  1    255  06 49 16

06 50 05  2007+402     01 48 27  23.0 -55.4  5.7      68.0    -4   1  1    255  06 50 05
06 50 50  ---          01 49 12  22.9 -55.3  5.7      67.9    41   F  1    256  06 50 06

06 50 50  IRAS2012     01 49 12  24.3 -55.1  5.6      69.1    -4   1  1    256  06 50 50
06 51 40  ---          01 50 02  24.2 -55.0  5.6      68.9    46   F  1    257  06 50 51

06 51 40  2007+402     01 50 02  22.7 -55.3  5.7      67.8    -4   1  1    257  06 51 40
06 52 25  ---          01 50 47  22.6 -55.2  5.7      67.7    41   F  1    257  06 51 41

06 52 25  IRAS2012     01 50 47  24.1 -55.0  5.6      68.8    -4   1  1    257  06 52 25
06 53 15  ---          01 51 37  23.9 -54.9  5.6      68.7    46   F  1    258  06 52 26

06 53 15  2007+402     01 51 37  22.5 -55.1  5.7      67.5    -4   1  1    258  06 53 15
06 54 00  ---          01 52 23  22.3 -55.1  5.7      67.4    41   F  1    259  06 53 16

06 54 00  IRAS2012     01 52 23  23.8 -54.9  5.6      68.6    -4   1  1    259  06 54 00
06 54 50  ---          01 53 13  23.6 -54.8  5.6      68.5    46   F  1    260  06 54 01

06 54 50  2007+402     01 53 13  22.2 -55.0  5.8      67.3    -4   1  1    260  06 54 50
06 55 35  ---          01 53 58  22.1 -55.0  5.8      67.2    41   F  1    261  06 54 51

06 55 35  IRAS2012     01 53 58  23.5 -54.7  5.7      68.4    -4   1  1    261  06 55 35
06 56 25  ---          01 54 48  23.4 -54.7  5.7      68.3    46   F  1    261  06 55 36

06 56 25  2007+402     01 54 48  21.9 -54.9  5.8      67.1    -4   1  1    261  06 56 25
06 57 10  ---          01 55 33  21.8 -54.8  5.8      67.0    41   F  1    262  06 56 26
Schedule for SHANGHAI  (Code Sh )                                   Page  27
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

06 57 10  IRAS2012     01 55 33  23.2 -54.6  5.7      68.2    -4   1  1    262  06 57 10
06 58 00  ---          01 56 23  23.1 -54.6  5.7      68.1    46   F  1    263  06 57 11

06 58 00  2007+402     01 56 23  21.6 -54.8  5.8      66.9    -4   1  1    263  06 58 00
06 58 45  ---          01 57 08  21.5 -54.7  5.8      66.8    41   F  1    264  06 58 01

06 58 45  IRAS2012     01 57 08  22.9 -54.5  5.7      68.0    -4   1  1    264  06 58 45
06 59 35  ---          01 57 58  22.8 -54.4  5.7      67.9    46   F  1    264  06 58 46

06 59 35  2007+402     01 57 58  21.4 -54.6  5.8      66.7    -4   1  1    264  06 59 35
07 00 20  ---          01 58 44  21.2 -54.6  5.8      66.6    41   F  1    265  06 59 36

07 00 20  IRAS2012     01 58 44  22.7 -54.4  5.7      67.8    -4   1  1    265  07 00 20
07 01 10  ---          01 59 34  22.5 -54.3  5.7      67.7    46   F  1    266  07 00 21

07 01 10  2007+402     01 59 34  21.1 -54.5  5.9      66.5    -4   1  1    266  07 01 10
07 01 55  ---          02 00 19  20.9 -54.4  5.9      66.4    41   F  1    267  07 01 11

07 01 55  IRAS2012     02 00 19  22.4 -54.3  5.8      67.6    -4   1  1    267  07 01 55
07 02 45  ---          02 01 09  22.2 -54.2  5.8      67.4    46   F  1    267  07 01 56

07 02 45  2007+402     02 01 09  20.8 -54.4  5.9      66.3    -4   1  1    267  07 02 45
07 03 30  ---          02 01 54  20.7 -54.3  5.9      66.2    41   F  1    268  07 02 46

07 03 30  IRAS2012     02 01 54  22.1 -54.1  5.8      67.3    -4   1  1    268  07 03 30
07 04 20  ---          02 02 44  22.0 -54.1  5.8      67.2    46   F  1    269  07 03 31

07 04 20  2007+402     02 02 44  20.5 -54.2  5.9      66.1    -4   1  1    269  07 04 20
07 05 05  ---          02 03 29  20.4 -54.2  5.9      66.0    41   F  1    270  07 04 21

07 05 05  IRAS2012     02 03 29  21.8 -54.0  5.8      67.1    -4   1  1    270  07 05 05
07 05 55  ---          02 04 19  21.7 -53.9  5.8      67.0    46   F  1    271  07 05 06

07 05 55  2007+402     02 04 19  20.2 -54.1  5.9      65.9    -4   1  1    271  07 05 55
07 06 40  ---          02 05 05  20.1 -54.1  6.0      65.8    41   F  1    271  07 05 56

07 06 40  IRAS2012     02 05 05  21.6 -53.9  5.8      66.9    -4   1  1    271  07 06 40
07 07 30  ---          02 05 55  21.4 -53.8  5.9      66.8    46   F  1    272  07 06 41

07 07 30  2007+402     02 05 55  20.0 -54.0  6.0      65.6    -4   1  1    272  07 07 30
07 08 15  ---          02 06 40  19.8 -53.9  6.0      65.5    41   F  1    273  07 07 31

07 08 15  IRAS2012     02 06 40  21.3 -53.8  5.9      66.7    -4   1  1    273  07 08 15
07 09 05  ---          02 07 30  21.1 -53.7  5.9      66.6    46   F  1    274  07 08 16
Schedule for SHANGHAI  (Code Sh )                                   Page  28
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

07 09 05  2007+402     02 07 30  19.7 -53.8  6.0      65.4    -4   1  1    274  07 09 05
07 09 50  ---          02 08 15  19.6 -53.8  6.0      65.3    41   F  1    274  07 09 06

07 09 50  IRAS2012     02 08 15  21.0 -53.6  5.9      66.5    -4   1  1    274  07 09 50
07 10 40  ---          02 09 05  20.9 -53.6  5.9      66.4    46   F  1    275  07 09 51

07 10 40  2007+402     02 09 05  19.4 -53.7  6.0      65.2    -4   1  1    275  07 10 40
07 11 25  ---          02 09 50  19.3 -53.7  6.0      65.1    41   F  1    276  07 10 41

07 11 25  IRAS2012     02 09 50  20.7 -53.5  5.9      66.3    -4   1  1    276  07 11 25
07 12 15  ---          02 10 41  20.6 -53.4  5.9      66.2    46   F  1    277  07 11 26

07 12 15  2007+402     02 10 41  19.1 -53.6  6.0      65.0    -4   1  1    277  07 12 15
07 13 00  ---          02 11 26  19.0 -53.5  6.1      64.9    41   F  1    277  07 12 16

07 14 00  2002+472     02 12 26  20.8 -46.3  6.2      66.2    51   1  1    277  07 14 00
07 17 00  ---          02 15 26  20.3 -46.1  6.2      65.7   180   F  1    280  07 14 01

07 18 00  2007+402     02 16 26  18.2 -53.1  6.1      64.2    51   1  1    280  07 18 00
07 19 00  ---          02 17 27  18.0 -53.0  6.2      64.1    60   F  1    281  07 18 01

07 19 00  IRAS2012     02 17 27  19.4 -52.9  6.0      65.2    -4   1  1    281  07 19 00
07 19 50  ---          02 18 17  19.3 -52.8  6.1      65.1    46   F  1    282  07 19 01

07 19 50  2007+402     02 18 17  17.8 -52.9  6.2      64.0    -4   1  1    282  07 19 50
07 20 40  ---          02 19 07  17.7 -52.9  6.2      63.9    46   F  1    283  07 19 51

07 20 40  IRAS2012     02 19 07  19.2 -52.7  6.1      65.0    -4   1  1    283  07 20 40
07 21 30  ---          02 19 57  19.0 -52.7  6.1      64.9    46   F  1    284  07 20 41

07 21 30  2007+402     02 19 57  17.6 -52.8  6.2      63.8    -4   1  1    284  07 21 30
07 22 20  ---          02 20 47  17.4 -52.7  6.2      63.6    46   F  1    284  07 21 31

07 22 20  IRAS2012     02 20 47  18.9 -52.6  6.1      64.8    -4   1  1    284  07 22 20
07 23 10  ---          02 21 37  18.7 -52.5  6.1      64.7    46   F  1    285  07 22 21

07 23 10  2007+402     02 21 37  17.3 -52.6  6.2      63.5    -4   1  1    285  07 23 10
07 24 00  ---          02 22 27  17.1 -52.6  6.2      63.4    46   F  1    286  07 23 11

07 24 00  IRAS2012     02 22 27  18.6 -52.4  6.1      64.5    -4   1  1    286  07 24 00
07 24 50  ---          02 23 18  18.4 -52.4  6.1      64.4    46   F  1    287  07 24 01

07 24 50  2007+402     02 23 18  17.0 -52.5  6.3      63.3    -4   1  1    287  07 24 50
07 25 40  ---          02 24 08  16.8 -52.4  6.3      63.2    46   F  1    288  07 24 51
Schedule for SHANGHAI  (Code Sh )                                   Page  29
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

07 25 40  IRAS2012     02 24 08  18.3 -52.3  6.2      64.3    -4   1  1    288  07 25 40
07 26 30  ---          02 24 58  18.2 -52.2  6.2      64.2    46   F  1    289  07 25 41

07 26 30  2007+402     02 24 58  16.7 -52.3  6.3      63.1    -4   1  1    289  07 26 30
07 27 20  ---          02 25 48  16.6 -52.3  6.3      63.0    46   F  1    289  07 26 31

07 27 20  IRAS2012     02 25 48  18.0 -52.2  6.2      64.1    -4   1  1    289  07 27 20
07 28 10  ---          02 26 38  17.9 -52.1  6.2      64.0    46   F  1    290  07 27 21

07 28 10  2007+402     02 26 38  16.4 -52.2  6.3      62.8    -4   1  1    290  07 28 10
07 29 00  ---          02 27 28  16.3 -52.1  6.3      62.7    46   F  1    291  07 28 11

07 29 00  IRAS2012     02 27 28  17.7 -52.0  6.2      63.8    -4   1  1    291  07 29 00
07 29 50  ---          02 28 18  17.6 -51.9  6.2      63.7    46   F  1    292  07 29 01

07 29 50  2007+402     02 28 18  16.1 -52.0  6.3      62.6    -4   1  1    292  07 29 50
07 30 40  ---          02 29 09  16.0 -52.0  6.4      62.5    46   F  1    293  07 29 51

07 30 40  IRAS2012     02 29 09  17.5 -51.9  6.2      63.6    -4   1  1    293  07 30 40
07 31 30  ---          02 29 59  17.3 -51.8  6.3      63.5    46   F  1    293  07 30 41

07 31 30  2007+402     02 29 59  15.9 -51.9  6.4      62.4    -4   1  1    293  07 31 30
07 32 20  ---          02 30 49  15.7 -51.8  6.4      62.3    46   F  1    294  07 31 31

07 32 20  IRAS2012     02 30 49  17.2 -51.7  6.3      63.4    -4   1  1    294  07 32 20
07 33 10  ---          02 31 39  17.0 -51.7  6.3      63.3    46   F  1    295  07 32 21

07 33 10  2007+402     02 31 39  15.6 -51.7  6.4      62.2    -4   1  1    295  07 33 10
07 34 00  ---          02 32 29  15.4 -51.6  6.4      62.0    46   F  1    296  07 33 11

07 34 00  IRAS2012     02 32 29  16.9 -51.6  6.3      63.2    -4   1  1    296  07 34 00
07 34 50  ---          02 33 19  16.8 -51.5  6.3      63.0    46   F  1    297  07 34 01

07 34 50  2007+402     02 33 19  15.3 -51.6  6.4      61.9    -4   1  1    297  07 34 50
07 35 40  ---          02 34 09  15.2 -51.5  6.4      61.8    46   F  1    297  07 34 51

07 35 40  IRAS2012     02 34 09  16.6 -51.4  6.3      62.9    -4   1  1    297  07 35 40
07 36 30  ---          02 35 00  16.5 -51.4  6.3      62.8    46   F  1    298  07 35 41

07 36 30  2007+402     02 35 00  15.0 -51.4  6.4      61.7    -4   1  1    298  07 36 30
07 37 20  ---          02 35 50  14.9 -51.3  6.5      61.6    46   F  1    299  07 36 31

07 37 20  IRAS2012     02 35 50  16.3 -51.3  6.4      62.7    -4   1  1    299  07 37 20
07 38 10  ---          02 36 40  16.2 -51.2  6.4      62.6    46   F  1    300  07 37 21
Schedule for SHANGHAI  (Code Sh )                                   Page  30
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

07 38 10  2007+402     02 36 40  14.7 -51.3  6.5      61.5    -4   1  1    300  07 38 10
07 39 00  ---          02 37 30  14.6 -51.2  6.5      61.3    46   F  1    301  07 38 11

07 39 00  IRAS2012     02 37 30  16.1 -51.1  6.4      62.5    -4   1  1    301  07 39 00
07 39 50  ---          02 38 20  15.9 -51.1  6.4      62.3    46   F  1    301  07 39 01

07 39 50  2007+402     02 38 20  14.5 -51.1  6.5      61.2    -4   1  1    301  07 39 50
07 40 40  ---          02 39 10  14.3 -51.0  6.5      61.1    46   F  1    302  07 39 51

07 40 40  IRAS2012     02 39 10  15.8 -51.0  6.4      62.2    -4   1  1    302  07 40 40
07 41 30  ---          02 40 00  15.6 -50.9  6.4      62.1    46   F  1    303  07 40 41

07 41 30  2007+402     02 40 00  14.2 -50.9  6.5      61.0    -4   1  1    303  07 41 30
07 42 20  ---          02 40 50  14.0 -50.9  6.5      60.9    46   F  1    304  07 41 31

07 42 20  IRAS2012     02 40 50  15.5 -50.8  6.4      62.0    -4   1  1    304  07 42 20
07 43 10  ---          02 41 41  15.4 -50.7  6.4      61.9    46   F  1    305  07 42 21

07 43 10  2007+402     02 41 41  13.9 -50.8  6.6      60.8    -4   1  1    305  07 43 10
07 44 00  ---          02 42 31  13.8 -50.7  6.6      60.6    46   F  1    305  07 43 11

07 45 00  2007+402     02 43 31  13.6 -50.6  6.6      60.5    58   1  1    305  07 45 00
07 46 00  ---          02 44 31  13.4 -50.5  6.6      60.4    60   F  1    306  07 45 01

07 46 00  IRAS2012     02 44 31  14.9 -50.5  6.5      61.5    -4   1  1    306  07 46 00
07 46 55  ---          02 45 26  14.7 -50.4  6.5      61.3    51   F  1    307  07 46 01

07 46 55  2007+402     02 45 26  13.3 -50.4  6.6      60.2    -4   1  1    307  07 46 55
07 47 50  ---          02 46 21  13.1 -50.3  6.6      60.1    51   F  1    308  07 46 56

07 47 50  IRAS2012     02 46 21  14.6 -50.3  6.5      61.2    -4   1  1    308  07 47 50
07 48 45  ---          02 47 17  14.4 -50.2  6.5      61.1    51   F  1    309  07 47 51

07 48 45  2007+402     02 47 17  13.0 -50.2  6.7      60.0    -4   1  1    309  07 48 45
07 49 40  ---          02 48 12  12.8 -50.2  6.7      59.9    51   F  1    310  07 48 46

07 49 40  IRAS2012     02 48 12  14.3 -50.1  6.6      60.9    -4   1  1    310  07 49 40
07 50 35  ---          02 49 07  14.1 -50.1  6.6      60.8    51   F  1    311  07 49 41

07 50 35  2007+402     02 49 07  12.7 -50.1  6.7      59.7    -4   1  1    311  07 50 35
07 51 30  ---          02 50 02  12.5 -50.0  6.7      59.6    51   F  1    312  07 50 36

07 51 30  IRAS2012     02 50 02  14.0 -50.0  6.6      60.7    -4   1  1    312  07 51 30
07 52 25  ---          02 50 57  13.8 -49.9  6.6      60.6    51   F  1    313  07 51 31
Schedule for SHANGHAI  (Code Sh )                                   Page  31
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

07 52 25  2007+402     02 50 57  12.4 -49.9  6.7      59.5    -4   1  1    313  07 52 25
07 53 20  ---          02 51 52  12.2 -49.8  6.7      59.3    51   F  1    314  07 52 26

07 53 20  IRAS2012     02 51 52  13.7 -49.8  6.6      60.4    -4   1  1    314  07 53 20
07 54 15  ---          02 52 47  13.5 -49.7  6.6      60.3    51   F  1    314  07 53 21

07 54 15  2007+402     02 52 47  12.1 -49.7  6.7      59.2    -4   1  1    314  07 54 15
07 55 10  ---          02 53 43  11.9 -49.6  6.8      59.1    51   F  1    315  07 54 16

07 55 10  IRAS2012     02 53 43  13.4 -49.6  6.7      60.2    -4   1  1    315  07 55 10
07 56 05  ---          02 54 38  13.2 -49.5  6.7      60.0    51   F  1    316  07 55 11

07 56 05  2007+402     02 54 38  11.8 -49.5  6.8      58.9    -4   1  1    316  07 56 05
07 57 00  ---          02 55 33  11.6 -49.4  6.8      58.8    51   F  1    317  07 56 06

07 57 00  IRAS2012     02 55 33  13.1 -49.4  6.7      59.9    -4   1  1    317  07 57 00
07 57 55  ---          02 56 28  12.9 -49.3  6.7      59.8    51   F  1    318  07 57 01

07 57 55  2007+402     02 56 28  11.5 -49.3  6.8      58.7    -4   1  1    318  07 57 55
07 58 50  ---          02 57 23  11.3 -49.2  6.8      58.6    51   F  1    319  07 57 56

07 58 50  IRAS2012     02 57 23  12.8 -49.3  6.7      59.6    -4   1  1    319  07 58 50
07 59 45  ---          02 58 18  12.6 -49.2  6.7      59.5    51   F  1    320  07 58 51

07 59 45  2007+402     02 58 18  11.2 -49.1  6.8      58.4    -4   1  1    320  07 59 45
08 00 40  ---          02 59 13  11.0 -49.1  6.9      58.3    51   F  1    321  07 59 46

08 00 40  IRAS2012     02 59 13  12.5 -49.1  6.7      59.4    -4   1  1    321  08 00 40
08 01 35  ---          03 00 09  12.3 -49.0  6.8      59.2    51   F  1    322  08 00 41

08 01 35  2007+402     03 00 09  10.9 -49.0  6.9      58.2    -4   1  1    322  08 01 35
08 02 30  ---          03 01 04  10.7 -48.9  6.9      58.0    51   F  1    322  08 01 36

08 02 30  IRAS2012     03 01 04  12.2 -48.9  6.8      59.1    -4   1  1    322  08 02 30
08 03 25  ---          03 01 59  12.0 -48.8  6.8      59.0    51   F  1    323  08 02 31

08 03 25  2007+402     03 01 59  10.6 -48.8  6.9      57.9    -4   1  1    323  08 03 25
08 04 20  ---          03 02 54  10.4 -48.7  6.9      57.8    51   F  1    324  08 03 26

08 04 20  IRAS2012     03 02 54  11.9 -48.7  6.8      58.8    -4   1  1    324  08 04 20
08 05 15  ---          03 03 49  11.7 -48.6  6.8      58.7    51   F  1    325  08 04 21

08 05 15  2007+402     03 03 49  10.3 -48.6  6.9      57.6    -4   1  1    325  08 05 15
08 06 10  ---          03 04 44  10.1 -48.5  6.9      57.5    51   F  1    326  08 05 16
Schedule for SHANGHAI  (Code Sh )                                   Page  32
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

08 06 10  IRAS2012     03 04 44  11.6 -48.5  6.8      58.6    -4   1  1    326  08 06 10
08 07 05  ---          03 05 40  11.5 -48.4  6.8      58.4    51   F  1    327  08 06 11

08 07 05  2007+402     03 05 40  10.0 -48.4  7.0      57.4    -4   1  1    327  08 07 05
08 08 00  ---          03 06 35   9.8 -48.3  7.0      57.2    51   F  1    328  08 07 06

08 08 00  IRAS2012     03 06 35  11.3 -48.3  6.9      58.3    -4   1  1    328  08 08 00
08 08 55  ---          03 07 30  11.2 -48.3  6.9      58.2    51   F  1    329  08 08 01

08 08 55  2007+402     03 07 30   9.7 -48.2  7.0      57.1    -4   1  1    329  08 08 55
08 09 50  ---          03 08 25   9.6 -48.1  7.0      57.0    51   F  1    329  08 08 56

08 09 50  IRAS2012     03 08 25  11.0 -48.2  6.9      58.0    -4   1  1    329  08 09 50
08 10 45  ---          03 09 20  10.9 -48.1  6.9      57.9    51   F  1    330  08 09 51

08 10 45  2007+402     03 09 20   9.4 -48.0  7.0      56.8    -4   1  1    330  08 10 45
08 11 40  ---          03 10 15   9.3 -47.9  7.0      56.7    51   F  1    331  08 10 46

08 11 40  IRAS2012     03 10 15  10.7 -48.0  6.9      57.8    -4   1  1    331  08 11 40
08 12 35  ---          03 11 10  10.6 -47.9  6.9      57.6    51   F  1    332  08 11 41

08 12 35  2007+402     03 11 10   9.1 -47.8  7.1      56.6    -4   1  1    332  08 12 35
08 13 30  ---          03 12 06   9.0 -47.7  7.1      56.4    51   F  1    333  08 12 36

08 14 30  2007+402     03 13 06   8.8 -47.6  7.1      56.3    58   1  1    333  08 14 30
08 15 30  ---          03 14 06   8.7 -47.5  7.1      56.1    60   F  1    334  08 14 31

08 15 30  IRAS2012     03 14 06  10.1 -47.6  7.0      57.2    -4   1  1    334  08 15 30
08 16 25  ---          03 15 01  10.0 -47.5  7.0      57.1    51   F  1    335  08 15 31

08 16 25  2007+402     03 15 01   8.5 -47.4  7.1      56.0    -4   1  1    335  08 16 25
08 17 20  ---          03 15 56   8.4 -47.3  7.1      55.9    51   F  1    336  08 16 26

08 17 20  IRAS2012     03 15 56   9.8 -47.4  7.0      56.9    -4   1  1    336  08 17 20
08 18 15  ---          03 16 51   9.7 -47.3  7.0      56.8    51   F  1    337  08 17 21

08 18 15  2007+402     03 16 51   8.2 -47.2  7.1      55.7    -4   1  1    337  08 18 15
08 19 10  ---          03 17 47   8.1 -47.1  7.2      55.6    51   F  1    338  08 18 16

08 19 10  IRAS2012     03 17 47   9.5 -47.2  7.1      56.7    -4   1  1    338  08 19 10
08 20 05  ---          03 18 42   9.4 -47.1  7.1      56.5    51   F  1    338  08 19 11

08 20 05  2007+402     03 18 42   7.9 -47.0  7.2      55.5    -4   1  1    338  08 20 05
08 21 00  ---          03 19 37   7.8 -46.9  7.2      55.3    51   F  1    339  08 20 06
Schedule for SHANGHAI  (Code Sh )                                   Page  33
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

08 21 00  IRAS2012     03 19 37   9.2 -47.0  7.1      56.4    -4   1  1    339  08 21 00
08 21 55  ---          03 20 32   9.1 -46.9  7.1      56.3    51   F  1    340  08 21 01

08 21 55  2007+402     03 20 32   7.6 -46.8  7.2      55.2    -4   1  1    340  08 21 55
08 22 50  ---          03 21 27   7.5 -46.7  7.2      55.1    51   F  1    341  08 21 56

08 22 50  IRAS2012     03 21 27   9.0 -46.8  7.1      56.1    -4   1  1    341  08 22 50
08 23 45  ---          03 22 22   8.8 -46.7  7.1      56.0    51   F  1    342  08 22 51

08 23 45  2007+402     03 22 22   7.4 -46.6  7.2      54.9    -4   1  1    342  08 23 45
08 24 40  ---          03 23 17   7.2 -46.5  7.3      54.8    51   F  1    343  08 23 46

08 24 40  IRAS2012     03 23 17   8.7 -46.6  7.1      55.9    -4   1  1    343  08 24 40
08 25 35  ---          03 24 13   8.5 -46.5  7.2      55.7    51   F  1    344  08 24 41

08 25 35  2007+402     03 24 13   7.1 -46.4  7.3      54.6    -4   1  1    344  08 25 35
08 26 30  ---          03 25 08   6.9 -46.3  7.3      54.5    51   F  1    345  08 25 36

08 26 30  IRAS2012     03 25 08   8.4 -46.4  7.2      55.6    -4   1  1    345  08 26 30
08 27 25  ---          03 26 03   8.2 -46.3  7.2      55.4    51   F  1    346  08 26 31

08 27 25  2007+402     03 26 03   6.8 -46.2  7.3      54.4    -4   1  1    346  08 27 25
08 28 20  ---          03 26 58   6.6 -46.1  7.3      54.2    51   F  1    346  08 27 26

08 28 20  IRAS2012     03 26 58   8.1 -46.2  7.2      55.3    -4   1  1    346  08 28 20
08 29 15  ---          03 27 53   8.0 -46.1  7.2      55.2    51   F  1    347  08 28 21

08 29 15  2007+402     03 27 53   6.5 -46.0  7.3      54.1    -4   1  1    347  08 29 15
08 30 10  ---          03 28 48   6.4 -45.9  7.3      54.0    51   F  1    348  08 29 16

08 30 10  IRAS2012     03 28 48   7.8 -46.0  7.2      55.0    -4   1  1    348  08 30 10
08 31 05  ---          03 29 43   7.7 -45.9  7.3      54.9    51   F  1    349  08 30 11

08 31 05  2007+402     03 29 43   6.2 -45.8  7.4      53.8    -4   1  1    349  08 31 05
08 32 00  ---          03 30 39   6.1 -45.7  7.4      53.7    51   F  1    350  08 31 06

08 32 00  IRAS2012     03 30 39   7.5 -45.8  7.3      54.8    -4   1  1    350  08 32 00
08 32 55  ---          03 31 34   7.4 -45.7  7.3      54.6    51   F  1    351  08 32 01

08 32 55  2007+402     03 31 34   5.9 -45.6  7.4      53.5    -4   1  1    351  08 32 55
08 33 50  ---          03 32 29   5.8 -45.5  7.4      53.4    51   F  1    352  08 32 56

08 33 50  IRAS2012     03 32 29   7.3 -45.6  7.3      54.5    -4   1  1    352  08 33 50
08 34 45  ---          03 33 24   7.1 -45.5  7.3      54.3    51   F  1    353  08 33 51
Schedule for SHANGHAI  (Code Sh )                                   Page  34
               Ejection and deceleration of the H2O masers in IRAS 20126+4104
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Wed   5 Mar 2008   Day  65 ---

08 34 45  2007+402     03 33 24   5.7 -45.4  7.4      53.3    -4   1  1    353  08 34 45
08 35 40  ---          03 34 19   5.5 -45.3  7.4      53.1    51   F  1    354  08 34 46

08 35 40  IRAS2012     03 34 19   7.0 -45.4  7.3      54.2    -4   1  1    354  08 35 40
08 36 35  ---          03 35 14   6.8 -45.3  7.3      54.1    51   F  1    354  08 35 41

08 36 35  2007+402     03 35 14   5.4 -45.2  7.5      53.0    -4   1  1    354  08 36 35
08 37 30  ---          03 36 10   5.2 -45.0  7.5      52.9    51   F  1    355  08 36 36

08 37 30  IRAS2012     03 36 10   6.7 -45.2  7.4      53.9    -4   1  1    355  08 37 30
08 38 25  ---          03 37 05   6.6 -45.1  7.4      53.8    51   F  1    356  08 37 31

08 38 25  2007+402     03 37 05   5.1 -44.9  7.5      52.7    -4   1  1    356  08 38 25
08 39 20  ---          03 38 00   5.0 -44.8  7.5  D   52.6     0   F  1    357  08 38 26

08 39 20  IRAS2012     03 38 00   6.4 -45.0  7.4      53.6    -4   1  1    357  08 39 20
08 40 15  ---          03 38 55   6.3 -44.9  7.4      53.5    51   F  1    358  08 39 21

08 41 10  IRAS2012     03 39 50   6.1 -44.8  7.4      53.4    53   1  1    358  08 41 10
08 42 05  ---          03 40 45   6.0 -44.7  7.4      53.2    55   F  1    359  08 41 11

08 44 00  2002+472     03 42 41   7.8 -38.2  7.7      51.5   106   1  1    359  08 44 00
08 47 00  ---          03 45 41   7.4 -37.9  7.7      51.0   180   F  1    362  08 44 01

10 10 55  2007+777     05 09 50  22.1  -9.0  9.1      39.8  5004   1  1    362  10 10 55
10 13 55  ---          05 12 50  22.0  -8.9  9.1      39.1   180   F  1    365  10 10 56

12 39 35  2007+777     07 38 54  19.1  -1.5 11.6       5.9  8731   1  1    365  12 39 35
12 42 35  ---          07 41 55  19.1  -1.3 11.6       5.3   180   F  1    368  12 39 36

14 22 35  2007+777     09 22 11  19.6   4.2-10.7     -17.5  5993   1  1    368  14 22 35
14 25 35  ---          09 25 12  19.7   4.4-10.7     -18.1   180   F  1    370  14 22 36


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: em059c.set
   Matches group sh1cm in /home/luca/SCHED/catalogs/freq.dat
    From Porcas, from Huang Xinyong 231198

   Setup group:    5         Station: SHANGHAI          Total bit rate:  128
   Format: MKIV1:4           Bits per sample: 2         Sample rate: 32.000
   Number of channels:  2                               Speedup factor:   1.00

   Disk used to record data.

   1st LO=  21600.00  21600.00
   Net SB=         U         U
   Pol.  =      RCP       LCP 
   BBC   =         1         2
   BBC SB=         U         U
   IF    =        C         A 

  The following frequency sets based on this setup were used.

  Frequency Set:   5  Based on FREQ, BW, and/or DOPPLER in schedule.  Used pcal sets:   1
   LO sum=   22229.06  22229.06
   BBC fr=     629.06    629.06
   Bandwd=     16.000    16.000

  The following pulse cal sets were used with this setup:

   Pulse cal detection set:   1  PCAL = OFF 
    PCALXB1=   S1    S2    OFF   OFF   OFF   OFF   OFF   OFF
    PCALXB2=   M1    M2    OFF   OFF   OFF   OFF   OFF   OFF
    PCALFR1=     0     0     0     0     0     0     0     0
    PCALFR2=     0     0     0     0     0     0     0     0

   Track assignments are: 
    track1=   2, 18
    barrel=roll_off 
 SOURCE LIST -- Ejection and deceleration of the H2O masers in IRAS 20126+4104
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

   2012+410        * 20 12 40.983000     20 14 26.030317     20 14 42.039325       0.00
 * IRAS2012        * 41 04 21.19600      41 13 32.63748      41 14 44.98856        0.00
                     From catalog imbedded in main SCHED input file.
                     Doppler based on LSR frame and radio definition.  Velocities:
                         -3.50    -3.50
                        5.300 scan hours,     72.445 baseline hours above horizon.

 * 2007+402          20 05 59.559049   * 20 07 44.945000     20 08 01.074249       0.00
                     40 21 01.80214    * 40 29 48.60400      40 30 56.48218        0.00
                     From catalog imbedded in main SCHED input file.
                     Doppler based on other sources.
                        5.151 scan hours,     69.097 baseline hours above horizon.

 * 2007+777          20 07 20.429674   * 20 05 30.998000     20 05 06.321414       0.00
                     77 43 58.12250    * 77 52 43.24700      77 53 49.58216        0.00
                     From catalog imbedded in main SCHED input file.
                     Doppler based on other sources.
                        0.951 scan hours,      6.326 baseline hours above horizon.

 * 2002+472          20 00 39.216117   * 20 02 10.418300     20 02 23.983900       0.00
                     47 17 02.42779    * 47 25 28.77700      47 26 32.37046        0.00
                     From catalog imbedded in main SCHED input file.
                     Doppler based on other sources.
                        0.750 scan hours,     16.918 baseline hours above horizon.

 * 2015+3710         20 13 37.014506   * 20 15 28.729792     20 15 45.960146       0.00
                     37 01 44.45891    * 37 10 59.51479      37 12 12.87467        0.00
                     From catalog imbedded in main SCHED input file.
                     Doppler based on other sources.
                        0.489 scan hours,      6.129 baseline hours above horizon.



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   IRAS2012            61.1
   2007+402            61.7
   2007+777            87.3
   2002+472            66.8
   2015+3710           58.4

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

