  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: 6.7GHz masers toward G23.01-0.41: magnetic field vs. velocity field
 Exp. Code:  ES067   


Schedule Version:       2.00
Processed by SCHED version:   9.40  Development version after Mar. 23, 2010.

PI:       A. Sanna

Address:  Max-Planck-Institut fuer Radioastronomie
          Auf dem Huegel 69
          53121, Bonn
          Germany

Phone:    +49 (0)228 525304
EMAIL:    asanna@mpifr-bonn.mpg.de
Fax:
Phone during observation: +49 (0)228 525304

Observing mode: Polarization observations of 1 source at 6.7 GHz (32 Mb/s)

Notes:
          phase-cal OFF
 
 

Schedule for HART      (Code Hh )                                   Page   2
               6.7GHz masers toward G23.01-0.41: magnetic field vs. velocity field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Sun  29 May 2011   Day 149 ---

 Next scan frequencies:  6666.48  6666.48  6666.48  6666.48
 Next BBC frequencies:    156.48   156.48   156.48   156.48
 Next scan bandwidths:      2.00     2.00     2.00     2.00

22 16 00  J1331+3030   16 35 06  18.6 319.3  3.1       0.0     0   1  1      0  22 16 00
22 26 00  =3C286       16 45 08  17.1 317.6  3.2       0.0   600   F  1      2  22 16 04

22 31 00  G23.01       16 50 08  59.9  60.7 -1.8       0.0   124   1  1      2  22 31 00
22 42 30  ---          17 01 40  62.1  57.0 -1.6       0.0   690   F  1      5  22 31 04

22 43 00  G23.01       17 02 10  62.2  56.8 -1.6       0.0     7   1  1      5  22 43 00
22 54 30  ---          17 13 42  64.3  52.6 -1.4       0.0   690   F  1      8  22 43 04

22 55 00  G23.01       17 14 12  64.4  52.4 -1.4       0.0     7   1  1      8  22 55 00
23 06 30  ---          17 25 44  66.4  47.5 -1.2       0.0   690   F  1     11  22 55 04

23 07 00  G23.01       17 26 14  66.5  47.3 -1.2       0.0     7   1  1     11  23 07 00
23 18 30  ---          17 37 46  68.3  41.5 -1.0       0.0   690   F  1     14  23 07 04

23 36 30  G23.01       17 55 49  70.7  30.8 -0.7       0.0  1044   1  1     14  23 36 30
23 48 00  ---          18 07 21  71.9  22.7 -0.5       0.0   690   F  1     16  23 36 34

23 48 30  G23.01       18 07 51  71.9  22.3 -0.5       0.0     7   1  1     16  23 48 30
23 59 59  ---          18 19 23  72.7  13.3 -0.3       0.0   689   F  1     19  23 48 34

 --- Mon  30 May 2011   Day 150 ---

00 00 30  G23.01       18 19 53  72.7  12.9 -0.3       0.0     7   1  1     19  00 00 30
00 12 00  ---          18 31 25  73.1   3.3 -0.1       0.0   690   F  1     22  00 00 34

00 12 30  G23.01       18 31 55  73.1   2.9 -0.1       0.0     7   1  1     22  00 12 30
00 24 00  ---          18 43 27  73.0 353.1  0.1       0.0   690   F  1     25  00 12 34

00 29 00  J2202+4216   18 48 28   8.3  34.1 -3.2       0.0   170   1  1     25  00 29 00
00 37 00  =BLLAC       18 56 29   9.3  33.0 -3.1       0.0   480   F  1     27  00 29 04

00 42 00  G23.01       19 01 30  72.0 338.6  0.4       0.0   167   1  1     27  00 42 00
00 53 30  ---          19 13 02  70.9 330.4  0.6       0.0   690   F  1     29  00 42 04

00 54 00  G23.01       19 13 32  70.8 330.1  0.6       0.0     7   1  1     29  00 54 00
01 05 30  ---          19 25 04  69.4 322.8  0.8       0.0   690   F  1     32  00 54 04
Schedule for HART      (Code Hh )                                   Page   3
               6.7GHz masers toward G23.01-0.41: magnetic field vs. velocity field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Mon  30 May 2011   Day 150 ---

01 06 00  G23.01       19 25 34  69.3 322.5  0.8       0.0     7   1  1     32  01 06 00
01 17 30  ---          19 37 06  67.6 316.3  1.0       0.0   690   F  1     35  01 06 04

01 18 00  G23.01       19 37 36  67.6 316.0  1.0       0.0     7   1  1     35  01 18 00
01 29 30  ---          19 49 08  65.7 310.6  1.2       0.0   690   F  1     38  01 18 04

01 34 30  J2202+4216   19 54 09  15.6  24.2 -2.2       0.0   170   1  1     38  01 34 30
01 42 30  =BLLAC       20 02 10  16.3  22.8 -2.0       0.0   480   F  1     40  01 34 34

01 47 30  G23.01       20 07 11  62.4 303.6  1.5       0.0   167   1  1     40  01 47 30
01 59 00  ---          20 18 43  60.2 299.9  1.7       0.0   690   F  1     42  01 47 34

01 59 30  G23.01       20 19 13  60.1 299.7  1.7       0.0     7   1  1     42  01 59 30
02 11 00  ---          20 30 45  57.8 296.4  1.9       0.0   690   F  1     45  01 59 34

02 11 30  G23.01       20 31 15  57.7 296.3  1.9       0.0     7   1  1     45  02 11 30
02 23 00  ---          20 42 46  55.4 293.4  2.1       0.0   690   F  1     48  02 11 34

02 23 30  G23.01       20 43 17  55.3 293.3  2.1       0.0     7   1  1     48  02 23 30
02 35 00  ---          20 54 48  52.9 290.7  2.3       0.0   690   F  1     51  02 23 34

02 40 00  J2202+4216   20 59 49  20.2  12.4 -1.1       0.0   170   1  1     51  02 40 00
02 48 00  =BLLAC       21 07 51  20.6  10.9 -0.9       0.0   480   F  1     53  02 40 04

02 53 00  G23.01       21 12 51  49.0 287.1  2.6       0.0   167   1  1     53  02 53 00
03 04 30  ---          21 24 23  46.5 285.0  2.8       0.0   690   F  1     56  02 53 04

03 05 00  G23.01       21 24 53  46.4 284.9  2.8       0.0     7   1  1     56  03 05 00
03 16 30  ---          21 36 25  43.9 283.1  3.0       0.0   690   F  1     58  03 05 04

03 17 00  G23.01       21 36 55  43.8 283.0  3.0       0.0     7   1  1     58  03 17 00
03 28 30  ---          21 48 27  41.3 281.2  3.2       0.0   690   F  1     61  03 17 04

03 29 00  G23.01       21 48 57  41.2 281.1  3.2       0.0     7   1  1     61  03 29 00
03 40 30  ---          22 00 29  38.6 279.5  3.4       0.0   690   F  1     64  03 29 04

03 45 30  J2202+4216   22 05 30  21.8 359.5  0.0       0.0   170   1  1     64  03 45 30
03 53 30  =BLLAC       22 13 31  21.7 357.9  0.2       0.0   480   F  1     66  03 45 34

03 58 30  G23.01       22 18 32  34.6 277.1  3.7       0.0   167   1  1     66  03 58 30
04 10 00  ---          22 30 04  32.0 275.6  3.9       0.0   690   F  1     69  03 58 34

04 10 30  G23.01       22 30 34  31.9 275.6  3.9       0.0     7   1  1     69  04 10 30
04 22 00  ---          22 42 06  29.3 274.2  4.1       0.0   690   F  1     71  04 10 34
Schedule for HART      (Code Hh )                                   Page   4
               6.7GHz masers toward G23.01-0.41: magnetic field vs. velocity field
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
         For disks, the footages are really the GBytes
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)   SYNC
----------------------------------------------------------------------------------------

 --- Mon  30 May 2011   Day 150 ---

04 22 30  G23.01       22 42 36  29.2 274.1  4.1       0.0     7   1  1     71  04 22 30
04 34 00  ---          22 54 08  26.6 272.8  4.3       0.0   690   F  1     74  04 22 34

04 34 30  G23.01       22 54 38  26.5 272.7  4.3       0.0     7   1  1     74  04 34 30
04 46 00  ---          23 06 10  23.9 271.4  4.5       0.0   690   F  1     77  04 34 34

04 51 00  J2202+4216   23 11 11  20.0 346.7  1.1       0.0   170   1  1     77  04 51 00
04 59 00  =BLLAC       23 19 12  19.6 345.2  1.3       0.0   480   F  1     79  04 51 04


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: sess211.M32
   Matching groups in :
     hh4.5cm_S2      Values confirmed by E-mail Jonathan Quick 291100 (CR)

   Setup group:    6         Station: HART              Total bit rate:   32
   Format: MKIV1:1           Bits per sample: 2         Sample rate:  4.000
   Number of channels:  4                               Speedup factor:   2.00

   Disk used to record data.

   1st LO=   6510.00   6510.00   6510.00   6510.00
   Net SB=         U         U         U         U
   Pol.  =      RCP       LCP       RCP       LCP 
   BBC   =         2         1         4         3
   BBC SB=         U         U         U         U
   IF    =        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

  Frequency Set:   7  Based on FREQ, BW, and/or DOPPLER in schedule.
   LO sum=    6666.48   6666.48   6666.48   6666.48
   BBC fr=     156.48    156.48    156.48    156.48
   Bandwd=      2.000     2.000     2.000     2.000

   Track assignments are: 
    track1=   2,  6, 10, 14
    barrel=roll_off 
 SOURCES USED IN RECORDING SCANS --                         6.7GHz masers toward G23.01-0.41: magnetic field vs. velocity field
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * G23.01            18 31 55.995307   * 18 34 40.290000     18 35 19.979215       0.00
                    -09 03 03.43237    *-09 00 38.30000     -09 00 02.85528        0.00
                     From catalog imbedded in main SCHED input file.
                     maser target position
                     Doppler based on LSR frame and radio definition.  Velocities:
                         77.00    77.00    77.00    77.00
                        4.600 scan and     96.594 baseline hours in setup: sess211.M32

 * J1331+3030        13 28 49.657776   * 13 31 08.288068     13 31 41.792851       0.21
   3C286             30 45 58.64077    * 30 30 32.95941      30 27 01.53314        0.19
   1328+307          /home/Alberto/SCHED09/catalogs/sources.vlba
   J1331+30          GSFC Nov. 2009 Solution 2009a       243 Observations
                     Doppler based on other sources.
                        0.167 scan and      3.500 baseline hours in setup: sess211.M32

 * J2202+4216        22 00 39.362506   * 22 02 43.291373     22 03 12.713403       0.01
   BLLAC             42 02 08.59082    * 42 16 39.97996      42 19 50.02785        0.01
   2200+420          /home/Alberto/SCHED09/catalogs/sources.vlba
   J2202+42          GSFC Nov. 2009 Solution 2009a     50280 Observations
   VR422201          Doppler based on other sources.
                        0.933 scan and     17.333 baseline hours in setup: sess211.M32



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   G23.01             146.5
   J1331+3030         113.1
   J2202+4216          79.6

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

