  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: 6cm global VLBI observations of IC860
 Exp. Code:  GV025   


Schedule Version:       3.00
Processed by SCHED version:  11.50  Development version 11.5. Started Apr. 2

PI:       Eskil Varenius

Address:  Jodrell Bank Observatory, The University of Manchester
          Lower Withington, Macclesfield
          Cheshire, SK11 9DL
          UK

Phone:    +46706755341
EMAIL:    eskil.varenius@manchester.ac.uk
Fax:
Phone during observation: +46706755341

Observing mode: 6cm 1Gbps global VLBI (EVN+VLBA+eMERLIN)

Notes:    NB: Key file includes 1h eMERLIN+Jb after (08-09UT) allocation (20-08UT), if antennas are idle.
          Phase calibrator: J1303+2433
          Fringe finder / pol. cal / bandpass cal: J1327+2210
 

Schedule for HART      (Code Hh )                                   Page   2
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon   4 Mar 2019   Day  63 ---

 Next scan frequencies:  4884.00  4884.00  4884.00  4884.00  4916.00  4916.00  4916.00  4916.00
                         4948.00  4948.00  4948.00  4948.00  4980.00  4980.00  4980.00  4980.00
 Next BBC frequencies:    284.00   284.00   284.00   284.00   316.00   316.00   316.00   316.00
                          348.00   348.00   348.00   348.00   380.00   380.00   380.00   380.00
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00

20 06 35  J1314+2348   08 46 31   8.2  58.6 -4.5       0.0     0        0   20 06 35
20 08 35  =1312+240    08 48 31   8.6  58.3 -4.5       0.0   120       15   20 06 36

20 09 02  IC860        08 48 59   8.2  57.6 -4.5       0.0     1       15   20 09 02
20 13 02  ---          08 52 59   8.9  57.1 -4.4       0.0   240       46   20 09 03

20 13 31  J1314+2348   08 53 28   9.5  57.7 -4.4       0.0     2       46   20 13 31
20 15 31  =1312+240    08 55 28   9.9  57.4 -4.3       0.0   120       62   20 13 32

20 15 58  IC860        08 55 56   9.5  56.7 -4.3       0.0     1       62   20 15 58
20 19 58  ---          08 59 56  10.2  56.2 -4.3       0.0   240       93   20 15 59

20 20 27  J1314+2348   09 00 25  10.8  56.8 -4.3       0.0     2       93   20 20 27
20 22 27  =1312+240    09 02 25  11.2  56.5 -4.2       0.0   120      108   20 20 28

20 22 55  IC860        09 02 53  10.8  55.8 -4.2       0.0     1      108   20 22 55
20 26 55  ---          09 06 54  11.5  55.3 -4.2       0.0   240      139   20 22 56

20 27 23  J1314+2348   09 07 22  12.1  55.8 -4.1       0.0     2      139   20 27 23
20 29 23  =1312+240    09 09 22  12.5  55.6 -4.1       0.0   120      155   20 27 24

20 29 51  IC860        09 09 50  12.1  54.9 -4.1       0.0     1      155   20 29 51
20 33 51  ---          09 13 51  12.8  54.3 -4.0       0.0   240      185   20 29 52

20 34 19  J1314+2348   09 14 20  13.4  54.9 -4.0       0.0     2      185   20 34 19
20 36 19  =1312+240    09 16 20  13.8  54.6 -4.0       0.0   120      201   20 34 20

20 36 47  IC860        09 16 48  13.3  53.9 -4.0       0.0     1      201   20 36 47
20 40 47  ---          09 20 48  14.1  53.3 -3.9       0.0   240      232   20 36 48

20 41 16  J1314+2348   09 21 17  14.7  53.9 -3.9       0.0     2      232   20 41 16
20 43 16  =1312+240    09 23 17  15.1  53.6 -3.9       0.0   120      247   20 41 17

20 43 44  IC860        09 23 45  14.6  52.9 -3.9       0.0     1      247   20 43 44
20 47 44  ---          09 27 46  15.3  52.3 -3.8       0.0   240      278   20 43 45

20 48 12  J1314+2348   09 28 15  16.0  52.9 -3.8       0.0     2      278   20 48 12
20 50 12  =1312+240    09 30 15  16.3  52.6 -3.8       0.0   120      294   20 48 13
Schedule for HART      (Code Hh )                                   Page   3
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon   4 Mar 2019   Day  63 ---

20 50 40  IC860        09 30 43  15.8  51.9 -3.8       0.0     1      294   20 50 40
20 54 40  ---          09 34 44  16.5  51.3 -3.7       0.0   240      325   20 50 41

20 55 09  J1314+2348   09 35 13  17.2  51.8 -3.7       0.0     2      325   20 55 09
20 57 09  =1312+240    09 37 13  17.5  51.5 -3.6       0.0   120      340   20 55 10

20 57 37  IC860        09 37 41  17.1  50.8 -3.6       0.0     1      340   20 57 37
21 01 37  ---          09 41 42  17.8  50.2 -3.6       0.0   240      371   20 57 38

21 02 06  J1314+2348   09 42 11  18.4  50.8 -3.6       0.0     2      371   21 02 06
21 04 06  =1312+240    09 44 11  18.8  50.4 -3.5       0.0   120      386   21 02 07

21 04 34  IC860        09 44 39  18.3  49.8 -3.5       0.0     1      386   21 04 34
21 08 34  ---          09 48 40  18.9  49.1 -3.5       0.0   240      417   21 04 35

 ---------- End of block 1 ----------

21 09 18  J1327+2210   09 49 24  18.6  52.9 -3.6       0.0    11      417   21 09 18
21 14 18  =1324+224    09 54 25  19.5  52.1 -3.6       0.0   300      456   21 09 19

21 15 01  J1314+2348   09 55 08  20.6  48.7 -3.3       0.0     9      456   21 15 01
21 17 01  =1312+240    09 57 08  21.0  48.3 -3.3       0.0   120      471   21 15 02

21 17 29  IC860        09 57 37  20.5  47.7 -3.3       0.0     2      471   21 17 29
21 21 29  ---          10 01 37  21.1  47.0 -3.2       0.0   240      502   21 17 30

21 21 58  J1314+2348   10 02 06  21.8  47.5 -3.2       0.0     2      502   21 21 58
21 23 58  =1312+240    10 04 07  22.1  47.2 -3.2       0.0   120      518   21 21 59

21 24 27  IC860        10 04 35  21.6  46.5 -3.2       0.0     2      518   21 24 27
21 28 27  ---          10 08 36  22.3  45.8 -3.1       0.0   240      549   21 24 28

21 28 56  J1314+2348   10 09 05  23.0  46.3 -3.1       0.0     2      549   21 28 56
21 30 56  =1312+240    10 11 05  23.3  45.9 -3.1       0.0   120      564   21 28 57

21 31 24  IC860        10 11 34  22.7  45.3 -3.1       0.0     2      564   21 31 24
21 35 24  ---          10 15 34  23.4  44.6 -3.0       0.0   240      595   21 31 25

21 35 53  J1314+2348   10 16 04  24.1  45.1 -3.0       0.0     2      595   21 35 53
21 37 53  =1312+240    10 18 04  24.4  44.7 -3.0       0.0   120      611   21 35 54

21 38 22  IC860        10 18 33  23.8  44.1 -3.0       0.0     2      611   21 38 22
21 42 22  ---          10 22 33  24.5  43.3 -2.9       0.0   240      642   21 38 23
Schedule for HART      (Code Hh )                                   Page   4
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon   4 Mar 2019   Day  63 ---

21 42 51  J1314+2348   10 23 03  25.2  43.8 -2.9       0.0     3      642   21 42 51
21 44 51  =1312+240    10 25 03  25.5  43.4 -2.8       0.0   120      657   21 42 52

21 45 20  IC860        10 25 32  24.9  42.8 -2.8       0.0     2      657   21 45 20
21 49 20  ---          10 29 32  25.5  42.0 -2.8       0.0   240      688   21 45 21

21 49 49  J1314+2348   10 30 02  26.2  42.5 -2.8       0.0     3      688   21 49 49
21 51 49  =1312+240    10 32 02  26.6  42.1 -2.7       0.0   120      703   21 49 50

21 52 18  IC860        10 32 31  26.0  41.5 -2.7       0.0     2      703   21 52 18
21 56 18  ---          10 36 31  26.6  40.7 -2.7       0.0   240      734   21 52 19

21 56 47  J1314+2348   10 37 01  27.3  41.1 -2.6       0.0     3      734   21 56 47
21 58 47  =1312+240    10 39 01  27.6  40.7 -2.6       0.0   120      750   21 56 48

21 59 16  IC860        10 39 30  27.0  40.1 -2.6       0.0     2      750   21 59 16
22 03 16  ---          10 43 31  27.6  39.3 -2.5       0.0   240      781   21 59 17

22 03 45  J1314+2348   10 44 00  28.3  39.7 -2.5       0.0     3      781   22 03 45
22 05 45  =1312+240    10 46 01  28.6  39.3 -2.5       0.0   120      796   22 03 46

22 06 14  IC860        10 46 30  28.0  38.7 -2.5       0.0     2      796   22 06 14
22 10 14  ---          10 50 30  28.5  37.9 -2.4       0.0   240      827   22 06 15

 ---------- End of block 2 ----------

22 10 58  J1327+2210   10 51 15  28.8  41.9 -2.6       0.0    11      827   22 10 58
22 15 58  =1324+224    10 56 15  29.6  40.9 -2.5       0.0   300      866   22 10 59

22 16 41  J1314+2348   10 56 58  30.1  37.0 -2.3       0.0     9      866   22 16 41
22 18 41  =1312+240    10 58 58  30.4  36.6 -2.3       0.0   120      881   22 16 42

22 19 10  IC860        10 59 27  29.8  36.0 -2.3       0.0     2      881   22 19 10
22 23 10  ---          11 03 28  30.3  35.2 -2.2       0.0   240      912   22 19 11

22 23 40  J1314+2348   11 03 58  31.1  35.5 -2.2       0.0     3      912   22 23 40
22 25 40  =1312+240    11 05 58  31.3  35.1 -2.2       0.0   120      927   22 23 41

22 26 09  IC860        11 06 27  30.7  34.5 -2.2       0.0     2      927   22 26 09
22 30 09  ---          11 10 28  31.2  33.6 -2.1       0.0   240      958   22 26 10

22 30 39  J1314+2348   11 10 58  32.0  34.0 -2.1       0.0     3      958   22 30 39
22 32 39  =1312+240    11 12 58  32.2  33.5 -2.0       0.0   120      974   22 30 40
Schedule for HART      (Code Hh )                                   Page   5
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon   4 Mar 2019   Day  63 ---

22 33 08  IC860        11 13 27  31.5  33.0 -2.0       0.0     2      974   22 33 08
22 37 08  ---          11 17 28  32.0  32.0 -2.0       0.0   240     1005   22 33 09

22 37 38  J1314+2348   11 17 58  32.8  32.4 -2.0       0.0     3     1005   22 37 38
22 39 38  =1312+240    11 19 58  33.1  31.9 -1.9       0.0   120     1020   22 37 39

22 40 07  IC860        11 20 28  32.4  31.4 -1.9       0.0     2     1020   22 40 07
22 44 07  ---          11 24 28  32.8  30.4 -1.9       0.0   240     1051   22 40 08

22 44 37  J1314+2348   11 24 58  33.6  30.7 -1.8       0.0     3     1051   22 44 37
22 46 37  =1312+240    11 26 59  33.9  30.2 -1.8       0.0   120     1067   22 44 38

22 47 06  IC860        11 27 28  33.2  29.7 -1.8       0.0     2     1067   22 47 06
22 51 06  ---          11 31 29  33.6  28.8 -1.7       0.0   240     1098   22 47 07

22 51 36  J1314+2348   11 31 59  34.4  29.0 -1.7       0.0     3     1098   22 51 36
22 53 36  =1312+240    11 33 59  34.6  28.5 -1.7       0.0   120     1113   22 51 37

22 54 05  IC860        11 34 29  33.9  28.0 -1.7       0.0     2     1113   22 54 05
22 58 05  ---          11 38 29  34.4  27.1 -1.6       0.0   240     1144   22 54 06

22 58 36  J1314+2348   11 39 00  35.2  27.3 -1.6       0.0     3     1144   22 58 36
23 00 36  =1312+240    11 41 00  35.4  26.8 -1.6       0.0   120     1159   22 58 37

23 01 05  IC860        11 41 29  34.7  26.3 -1.6       0.0     3     1159   23 01 05
23 05 05  ---          11 45 30  35.1  25.3 -1.5       0.0   240     1190   23 01 06

23 05 35  J1314+2348   11 46 00  35.9  25.5 -1.5       0.0     4     1190   23 05 35
23 07 35  =1312+240    11 48 01  36.1  25.0 -1.5       0.0   120     1206   23 05 36

23 08 05  IC860        11 48 30  35.3  24.5 -1.5       0.0     3     1206   23 08 05
23 12 05  ---          11 52 31  35.7  23.5 -1.4       0.0   240     1237   23 08 06

 ---------- End of block 3 ----------

23 12 49  J1327+2210   11 53 15  36.8  27.7 -1.6       0.0    11     1237   23 12 49
23 17 49  =1324+224    11 58 16  37.3  26.4 -1.5       0.0   300     1275   23 12 50

23 18 31  J1314+2348   11 58 58  37.0  22.1 -1.3       0.0     9     1275   23 18 31
23 20 31  =1312+240    12 00 58  37.2  21.6 -1.2       0.0   120     1291   23 18 32

23 21 00  IC860        12 01 28  36.5  21.2 -1.2       0.0     3     1291   23 21 00
23 25 00  ---          12 05 29  36.8  20.1 -1.2       0.0   240     1322   23 21 01
Schedule for HART      (Code Hh )                                   Page   6
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Mon   4 Mar 2019   Day  63 ---

23 25 31  J1314+2348   12 05 59  37.6  20.2 -1.2       0.0     4     1322   23 25 31
23 27 31  =1312+240    12 08 00  37.8  19.7 -1.1       0.0   120     1337   23 25 32

23 28 00  IC860        12 08 29  37.0  19.3 -1.1       0.0     3     1337   23 28 00
23 32 00  ---          12 12 30  37.3  18.2 -1.1       0.0   240     1368   23 28 01

23 32 31  J1314+2348   12 13 00  38.1  18.3 -1.0       0.0     4     1368   23 32 31
23 34 31  =1312+240    12 15 01  38.3  17.8 -1.0       0.0   120     1384   23 32 32

23 35 00  IC860        12 15 30  37.5  17.4 -1.0       0.0     3     1384   23 35 00
23 39 00  ---          12 19 31  37.8  16.3 -0.9       0.0   240     1414   23 35 01

23 39 31  J1314+2348   12 20 02  38.6  16.4 -0.9       0.0     4     1414   23 39 31
23 41 31  =1312+240    12 22 02  38.7  15.8 -0.9       0.0   120     1430   23 39 32

23 42 00  IC860        12 22 31  38.0  15.5 -0.9       0.0     3     1430   23 42 00
23 46 00  ---          12 26 32  38.2  14.4 -0.8       0.0   240     1461   23 42 01

23 46 31  J1314+2348   12 27 03  39.0  14.4 -0.8       0.0     4     1461   23 46 31
23 48 31  =1312+240    12 29 03  39.1  13.8 -0.8       0.0   120     1476   23 46 32

23 49 00  IC860        12 29 33  38.4  13.5 -0.8       0.0     3     1476   23 49 00
23 53 00  ---          12 33 33  38.6  12.4 -0.7       0.0   240     1507   23 49 01

23 53 31  J1314+2348   12 34 04  39.4  12.3 -0.7       0.0     4     1507   23 53 31
23 55 31  =1312+240    12 36 04  39.5  11.8 -0.7       0.0   120     1523   23 53 32

23 56 00  IC860        12 36 34  38.7  11.5 -0.7       0.0     3     1523   23 56 00
23 59 59  ---          12 40 35  38.9  10.4 -0.6       0.0   239     1554   23 56 01

 --- Tue   5 Mar 2019   Day  64 ---

00 00 31  J1314+2348   12 41 05  39.7  10.3 -0.6       0.0     4     1554   00 00 31
00 02 31  =1312+240    12 43 06  39.8   9.7 -0.5       0.0   120     1569   00 00 32

00 03 01  IC860        12 43 35  39.0   9.5 -0.5       0.0     3     1569   00 03 01
00 07 01  ---          12 47 36  39.1   8.3 -0.5       0.0   240     1600   00 03 02

00 07 31  J1314+2348   12 48 06  40.0   8.2 -0.5       0.0     4     1600   00 07 31
00 09 31  =1312+240    12 50 07  40.0   7.6 -0.4       0.0   120     1615   00 07 32

00 10 00  IC860        12 50 36  39.2   7.5 -0.4       0.0     3     1615   00 10 00
00 14 00  ---          12 54 37  39.3   6.3 -0.4       0.0   240     1646   00 10 01
Schedule for HART      (Code Hh )                                   Page   7
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   5 Mar 2019   Day  64 ---

 ---------- End of block 4 ----------

00 14 44  J1327+2210   12 55 21  41.4  10.1 -0.5       0.0    11     1646   00 14 44
00 19 44  =1324+224    13 00 21  41.6   8.6 -0.5       0.0   300     1685   00 14 45

00 20 26  J1314+2348   13 01 04  40.3   4.4 -0.2       0.0     9     1685   00 20 26
00 22 26  =1312+240    13 03 04  40.3   3.8 -0.2       0.0   120     1700   00 20 27

00 22 46  J1314+2348   13 03 24  40.3   3.7 -0.2       0.0    -1     1700   00 22 46
00 24 46  =1312+240    13 05 24  40.3   3.1 -0.2       0.0   119     1716   00 22 47

00 25 06  J1314+2348   13 05 44  40.3   3.0 -0.2       0.0    -1     1716   00 25 06
00 27 06  =1312+240    13 07 45  40.4   2.4 -0.1       0.0   119     1731   00 25 07

00 27 26  J1314+2348   13 08 05  40.4   2.3 -0.1       0.0    -1     1731   00 27 26
00 29 26  =1312+240    13 10 05  40.4   1.7 -0.1       0.0   119     1747   00 27 27

00 29 46  J1314+2348   13 10 25  40.4   1.6 -0.1       0.0    -1     1747   00 29 46
00 31 46  =1312+240    13 12 25  40.4   1.0 -0.1       0.0   119     1762   00 29 47

00 32 06  J1314+2348   13 12 46  40.4   0.9 -0.0       0.0    -1     1762   00 32 06
00 34 06  =1312+240    13 14 46  40.4   0.3 -0.0       0.0   119     1778   00 32 07

 ---------- T6 leaves ----------

00 34 35  IC860        13 15 15  39.6   0.2 -0.0       0.0     2     1778   00 34 35
00 38 35  ---          13 19 15  39.6 359.0  0.1       0.0   240     1809   00 34 36

00 39 05  J1314+2348   13 19 46  40.4 358.8  0.1       0.0     3     1809   00 39 05
00 41 05  =1312+240    13 21 46  40.4 358.2  0.1       0.0   120     1824   00 39 06

00 41 34  IC860        13 22 15  39.6 358.2  0.1       0.0     2     1824   00 41 34
00 45 34  ---          13 26 15  39.5 357.0  0.2       0.0   240     1855   00 41 35

00 46 04  J1314+2348   13 26 45  40.3 356.7  0.2       0.0     3     1855   00 46 04
00 48 04  =1312+240    13 28 46  40.3 356.1  0.2       0.0   120     1870   00 46 05

00 48 33  IC860        13 29 15  39.5 356.1  0.2       0.0     2     1870   00 48 33
00 52 33  ---          13 33 15  39.4 354.9  0.3       0.0   240     1901   00 48 34

00 53 02  J1314+2348   13 33 45  40.2 354.6  0.3       0.0     3     1901   00 53 02
00 55 02  =1312+240    13 35 45  40.2 354.0  0.3       0.0   120     1917   00 53 03

00 55 31  IC860        13 36 14  39.4 354.0  0.3       0.0     2     1917   00 55 31
00 59 31  ---          13 40 15  39.3 352.9  0.4       0.0   240     1948   00 55 32
Schedule for HART      (Code Hh )                                   Page   8
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   5 Mar 2019   Day  64 ---

01 00 01  J1314+2348   13 40 45  40.0 352.5  0.4       0.0     3     1948   01 00 01
01 02 01  =1312+240    13 42 45  40.0 351.9  0.5       0.0   120     1963   01 00 02

01 02 30  IC860        13 43 14  39.2 352.0  0.5       0.0     2     1963   01 02 30
01 06 30  ---          13 47 15  39.0 350.8  0.5       0.0   240     1994   01 02 31

 ---------- End of block 5 ----------

01 07 13  J1327+2210   13 47 59  41.8 353.8  0.3       0.0    11     1994   01 07 13
01 12 13  =1324+224    13 52 59  41.6 352.2  0.4       0.0   300     2033   01 07 14

01 13 02  J1314+2348   13 53 48  39.6 348.7  0.6       0.0    15     2033   01 13 02
01 15 02  =1312+240    13 55 48  39.5 348.1  0.7       0.0   120     2048   01 13 03

01 15 31  IC860        13 56 18  38.7 348.2  0.7       0.0     2     2048   01 15 31
01 19 31  ---          14 00 18  38.5 347.1  0.7       0.0   240     2079   01 15 32

01 20 00  J1314+2348   14 00 47  39.2 346.6  0.8       0.0     2     2079   01 20 00
01 22 00  =1312+240    14 02 48  39.1 346.1  0.8       0.0   120     2095   01 20 01

01 22 30  IC860        14 03 17  38.3 346.3  0.8       0.0     2     2095   01 22 30
01 26 30  ---          14 07 18  38.1 345.1  0.9       0.0   240     2126   01 22 31

01 26 59  J1314+2348   14 07 47  38.8 344.6  0.9       0.0     2     2126   01 26 59
01 28 59  =1312+240    14 09 47  38.7 344.1  0.9       0.0   120     2141   01 27 00

01 29 28  IC860        14 10 17  37.9 344.3  0.9       0.0     3     2141   01 29 28
01 33 28  ---          14 14 17  37.7 343.2  1.0       0.0   240     2172   01 29 29

01 33 57  J1314+2348   14 14 47  38.4 342.7  1.0       0.0     2     2172   01 33 57
01 35 57  =1312+240    14 16 47  38.2 342.1  1.0       0.0   120     2187   01 33 58

01 36 26  IC860        14 17 16  37.5 342.4  1.0       0.0     3     2187   01 36 26
01 40 26  ---          14 21 17  37.2 341.3  1.1       0.0   240     2218   01 36 27

01 40 56  J1314+2348   14 21 46  37.9 340.7  1.1       0.0     3     2218   01 40 56
01 42 56  =1312+240    14 23 47  37.7 340.2  1.1       0.0   120     2234   01 40 57

01 43 25  IC860        14 24 16  37.0 340.5  1.1       0.0     3     2234   01 43 25
01 47 25  ---          14 28 17  36.7 339.4  1.2       0.0   240     2265   01 43 26

01 47 54  J1314+2348   14 28 46  37.3 338.8  1.2       0.0     3     2265   01 47 54
01 49 54  =1312+240    14 30 46  37.2 338.3  1.3       0.0   120     2280   01 47 55
Schedule for HART      (Code Hh )                                   Page   9
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   5 Mar 2019   Day  64 ---

01 50 24  IC860        14 31 16  36.4 338.6  1.3       0.0     3     2280   01 50 24
01 54 24  ---          14 35 17  36.1 337.6  1.3       0.0   240     2311   01 50 25

01 54 53  J1314+2348   14 35 46  36.8 337.0  1.3       0.0     3     2311   01 54 53
01 56 53  =1312+240    14 37 46  36.6 336.4  1.4       0.0   120     2326   01 54 54

01 57 23  IC860        14 38 16  35.8 336.8  1.4       0.0     3     2326   01 57 23
02 01 23  ---          14 42 17  35.5 335.8  1.4       0.0   240     2357   01 57 24

02 01 52  J1314+2348   14 42 46  36.1 335.1  1.5       0.0     3     2357   02 01 52
02 03 52  =1312+240    14 44 46  35.9 334.6  1.5       0.0   120     2373   02 01 53

 ---------- End of block 6, VLBA_NL, VLBA_SC, VLBA_HN join ----------

02 04 12  J1314+2348   14 45 07  35.9 334.5  1.5       0.0    -1     2373   02 04 12
02 06 12  =1312+240    14 47 07  35.7 334.0  1.5       0.0   119     2388   02 04 13

02 06 42  IC860        14 47 36  34.9 334.4  1.5       0.0     3     2388   02 06 42
02 10 42  ---          14 51 37  34.5 333.4  1.6       0.0   240     2419   02 06 43

 ---------- End of block 6, ----------

02 11 34  J1327+2210   14 52 29  37.8 335.0  1.4       0.0    19     2419   02 11 34
02 16 34  =1324+224    14 57 30  37.3 333.6  1.5       0.0   300     2458   02 11 35

02 17 28  J1314+2348   14 58 25  34.5 331.2  1.7       0.0    21     2458   02 17 28
02 19 28  =1312+240    15 00 25  34.3 330.7  1.7       0.0   120     2473   02 17 29

02 19 58  IC860        15 00 55  33.6 331.1  1.7       0.0     3     2473   02 19 58
02 23 58  ---          15 04 55  33.1 330.2  1.8       0.0   240     2504   02 19 59

02 24 27  J1314+2348   15 05 25  33.7 329.5  1.8       0.0     3     2504   02 24 27
02 26 27  =1312+240    15 07 25  33.5 329.0  1.9       0.0   120     2520   02 24 28

02 26 56  IC860        15 07 55  32.8 329.5  1.9       0.0     3     2520   02 26 56
02 30 56  ---          15 11 55  32.3 328.5  1.9       0.0   240     2551   02 26 57

02 31 26  J1314+2348   15 12 25  32.9 327.9  1.9       0.0     3     2551   02 31 26
02 33 26  =1312+240    15 14 25  32.7 327.4  2.0       0.0   120     2566   02 31 27

 ---------- Bd leaves ----------

02 33 55  IC860        15 14 55  32.0 327.9  2.0       0.0     3     2566   02 33 55
02 37 55  ---          15 18 55  31.5 327.0  2.0       0.0   240     2597   02 33 56
Schedule for HART      (Code Hh )                                   Page  10
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   5 Mar 2019   Day  64 ---

02 38 25  J1314+2348   15 19 25  32.1 326.3  2.1       0.0     3     2597   02 38 25
02 40 25  =1312+240    15 21 25  31.8 325.8  2.1       0.0   120     2612   02 38 26

02 40 54  IC860        15 21 54  31.1 326.3  2.1       0.0     2     2612   02 40 54
02 44 54  ---          15 25 55  30.6 325.4  2.2       0.0   240     2643   02 40 55

02 45 23  J1314+2348   15 26 25  31.2 324.7  2.2       0.0     3     2643   02 45 23
02 47 23  =1312+240    15 28 25  30.9 324.3  2.2       0.0   120     2659   02 45 24

02 47 53  IC860        15 28 54  30.2 324.8  2.2       0.0     2     2659   02 47 53
02 51 53  ---          15 32 55  29.7 323.9  2.3       0.0   240     2690   02 47 54

02 52 22  J1314+2348   15 33 24  30.3 323.2  2.3       0.0     3     2690   02 52 22
02 54 22  =1312+240    15 35 25  30.0 322.7  2.3       0.0   120     2705   02 52 23

02 54 51  IC860        15 35 54  29.3 323.3  2.3       0.0     2     2705   02 54 51
02 58 51  ---          15 39 55  28.8 322.4  2.4       0.0   240     2736   02 54 52

02 59 21  J1314+2348   15 40 24  29.3 321.7  2.4       0.0     3     2736   02 59 21
03 01 21  =1312+240    15 42 24  29.0 321.3  2.4       0.0   120     2752   02 59 22

03 01 50  IC860        15 42 53  28.3 321.8  2.4       0.0     2     2752   03 01 50
03 05 50  ---          15 46 54  27.8 321.0  2.5       0.0   240     2782   03 01 51

 ---------- End of block 7, VLBA_FD, VLBA_LA join ----------

03 06 44  J1327+2210   15 47 48  31.3 321.6  2.3       0.0    21     2782   03 06 44
03 11 44  =1324+224    15 52 49  30.6 320.5  2.4       0.0   300     2821   03 06 45

03 12 38  J1314+2348   15 53 44  27.4 319.0  2.6       0.0    21     2821   03 12 38
03 14 38  =1312+240    15 55 44  27.1 318.6  2.7       0.0   120     2837   03 12 39

03 15 07  IC860        15 56 13  26.4 319.2  2.7       0.0     2     2837   03 15 07
03 19 07  ---          16 00 14  25.8 318.4  2.7       0.0   240     2868   03 15 08

03 19 36  J1314+2348   16 00 43  26.3 317.6  2.8       0.0     2     2868   03 19 36
03 21 36  =1312+240    16 02 43  26.0 317.3  2.8       0.0   120     2883   03 19 37

 ---------- Ur leaves, VLBA_BR, VLBA_PT, VLBA_KP join ----------

03 22 05  IC860        16 03 12  25.4 317.8  2.8       0.0     2     2883   03 22 05
03 26 05  ---          16 07 13  24.8 317.1  2.9       0.0   240     2914   03 22 06

03 26 34  J1314+2348   16 07 42  25.3 316.3  2.9       0.0     2     2914   03 26 34
03 28 34  =1312+240    16 09 42  25.0 315.9  2.9       0.0   120     2929   03 26 35
Schedule for HART      (Code Hh )                                   Page  11
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   5 Mar 2019   Day  64 ---

03 29 03  IC860        16 10 11  24.3 316.5  2.9       0.0     2     2929   03 29 03
03 33 03  ---          16 14 12  23.7 315.8  3.0       0.0   240     2960   03 29 04

03 33 32  J1314+2348   16 14 41  24.2 315.0  3.0       0.0     2     2960   03 33 32
03 35 32  =1312+240    16 16 41  23.8 314.7  3.0       0.0   120     2976   03 33 33

03 36 01  IC860        16 17 10  23.2 315.3  3.0       0.0     2     2976   03 36 01
03 40 01  ---          16 21 11  22.6 314.6  3.1       0.0   240     3007   03 36 02

03 40 30  J1314+2348   16 21 40  23.0 313.8  3.1       0.0     2     3007   03 40 30
03 42 30  =1312+240    16 23 40  22.7 313.4  3.1       0.0   120     3022   03 40 31

03 42 58  IC860        16 24 09  22.1 314.0  3.1       0.0     2     3022   03 42 58
03 46 58  ---          16 28 10  21.5 313.4  3.2       0.0   240     3053   03 42 59

03 47 27  J1314+2348   16 28 39  21.9 312.6  3.2       0.0     2     3053   03 47 27
03 49 27  =1312+240    16 30 39  21.6 312.3  3.2       0.0   120     3068   03 47 28

03 49 56  IC860        16 31 08  21.0 312.9  3.3       0.0     2     3068   03 49 56
03 53 56  ---          16 35 08  20.3 312.2  3.3       0.0   240     3099   03 49 57

03 54 25  J1314+2348   16 35 37  20.7 311.4  3.3       0.0     2     3099   03 54 25
03 56 25  =1312+240    16 37 38  20.4 311.1  3.4       0.0   120     3115   03 54 26

03 56 54  IC860        16 38 07  19.8 311.7  3.4       0.0     2     3115   03 56 54
04 00 54  ---          16 42 07  19.1 311.1  3.4       0.0   240     3146   03 56 55

04 01 22  J1314+2348   16 42 36  19.5 310.3  3.4       0.0     2     3146   04 01 22
04 03 22  =1312+240    16 44 36  19.2 310.0  3.5       0.0   120     3161   04 01 23

04 03 51  IC860        16 45 05  18.6 310.6  3.5       0.0     2     3161   04 03 51
04 07 51  ---          16 49 06  18.0 309.9  3.6       0.0   240     3192   04 03 52

 ---------- End of block 8, VLBA_OV joins ----------

04 08 44  J1327+2210   16 49 59  21.5 309.8  3.4       0.0    19     3192   04 08 44
04 13 44  =1324+224    16 54 59  20.6 309.0  3.5       0.0   300     3231   04 08 45

04 14 35  J1314+2348   16 55 51  17.2 308.2  3.7       0.0    18     3231   04 14 35
04 16 35  =1312+240    16 57 51  16.9 307.9  3.7       0.0   120     3246   04 14 36

04 17 04  IC860        16 58 20  16.3 308.5  3.7       0.0     2     3246   04 17 04
04 21 04  ---          17 02 21  15.6 307.9  3.8       0.0   240     3277   04 17 05
Schedule for HART      (Code Hh )                                   Page  12
               6cm global VLBI observations of IC860
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   5 Mar 2019   Day  64 ---

04 21 32  J1314+2348   17 02 49  16.0 307.2  3.8       0.0     2     3277   04 21 32
04 23 32  =1312+240    17 04 50  15.6 306.9  3.8       0.0   120     3293   04 21 33

04 24 01  IC860        17 05 19  15.1 307.5  3.8       0.0     2     3293   04 24 01
04 28 01  ---          17 09 19  14.4 306.9  3.9       0.0   240     3324   04 24 02

04 28 30  J1314+2348   17 09 48  14.7 306.1  3.9       0.0     2     3324   04 28 30
04 30 30  =1312+240    17 11 48  14.4 305.9  3.9       0.0   120     3339   04 28 31

04 30 59  IC860        17 12 17  13.9 306.5  3.9       0.0     2     3339   04 30 59
04 34 59  ---          17 16 18  13.1 305.9  4.0       0.0   240     3370   04 31 00

04 35 27  J1314+2348   17 16 47  13.5 305.1  4.0       0.0     2     3370   04 35 27
04 37 27  =1312+240    17 18 47  13.1 304.9  4.1       0.0   120     3385   04 35 28

04 37 56  IC860        17 19 16  12.6 305.5  4.1       0.0     2     3385   04 37 56
04 41 56  ---          17 23 17  11.8 305.0  4.1       0.0   240     3416   04 37 57

04 42 25  J1314+2348   17 23 45  12.2 304.2  4.1       0.0     2     3416   04 42 25
04 44 25  =1312+240    17 25 46  11.8 303.9  4.2       0.0   120     3432   04 42 26

04 44 54  IC860        17 26 15  11.3 304.6  4.2       0.0     2     3432   04 44 54
04 48 54  ---          17 30 15  10.6 304.0  4.2       0.0   240     3463   04 44 55

04 49 22  J1314+2348   17 30 44  10.9 303.2  4.3       0.0     2     3463   04 49 22
04 51 22  =1312+240    17 32 44  10.5 303.0  4.3       0.0   120     3478   04 49 23

 ---------- Hh leaves ----------

04 51 51  IC860        17 33 13  10.0 303.6  4.3       0.0     2     3478   04 51 51
04 55 51  ---          17 37 14   9.2 303.1  4.4       0.0   240     3509   04 51 52


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 ======== Setup file: sess119.C2048glob
   Matching groups in /home/guest/rmc/SCHED/sched11.5/catalogs/freq_RDBE.dat:
     hh6cm           Values confirmed by E-mail Jonathan Quick 20140219 (CR)
    ****** Only  128.00 of  256.00 MHz total bandwidth is within the IFs
           in the setup file before any FREQ or DOPPLER shifts.

   Setup group:   18         Station: HART              Total bit rate:  1024
   Format: VDIF              Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type: DBBC_DDC         Speedup factor:   1.00

   Disk used to record data.

   1st LO=   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00
             4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF SB =         U         U         U         U         U         U         U         U
                   U         U         U         U         U         U         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         1         9         1         9         2        10         2        10
                   3        11         3        11         4        12         4        12
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        A1        C1        A1        C1        A1        C1        A1        C1
                  A1        C1        A1        C1        A1        C1        A1        C1

  The following frequency sets based on these setups were used.

   Frequency Set:  21  Setup file default.  Used with PCAL = off
   LO sum=   4884.00  4884.00  4884.00  4884.00  4916.00  4916.00  4916.00  4916.00
             4948.00  4948.00  4948.00  4948.00  4980.00  4980.00  4980.00  4980.00
   BBC fr=    284.00   284.00   284.00   284.00   316.00   316.00   316.00   316.00
              348.00   348.00   348.00   348.00   380.00   380.00   380.00   380.00
   Bandwd=     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
               16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
    Matching frequency sets:  21

   Track assignments are: 
    track1=   1,  2,  3,  4,  5,  6,  7,  8,  9, 10, 11, 12, 13, 14, 15, 16
    barrel=roll_off 

 POSITIONS OF SOURCES USED IN RECORDING SCANS

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * IC860             13 12 39.491919   * 13 15 03.505200     13 15 58.838854       0.00
                     24 52 58.11061    * 24 37 07.73800      24 30 58.85718        0.00
                     From catalog imbedded in main SCHED input file.
                     Position from EVN project EP055.

   1312+240          13 12 19.391286   * 13 14 43.806206     13 15 39.291242       0.35
 * J1314+2348        24 04 17.61682    * 23 48 26.78172      23 42 17.83530        0.41
                     /home/guest/rmc/SCHED/sched11.5/catalogs/sources.gsfc
                     GSFC 2016a X/S astro solution,     56 observations.

   1324+224          13 24 37.118627   * 13 27 00.861311     13 27 56.051955       0.00
 * J1327+2210        22 26 22.70245    * 22 10 50.16289      22 04 48.33664        0.00
   J1327+22          /home/guest/rmc/SCHED/sched11.5/catalogs/sources.gsfc
                     GSFC 2016a X/S astro solution,  46958 observations.



SOURCE SCAN SUMMARY FOR SOURCES LISTED ABOVE

     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.
  Source       Setup file             Frequency sets                  Observing hours
                                   (duplicates not shown)              Scan  Baseline
  IC860      sess119.C2048glob     1 2 8 9 10 11 12 13 14 15 1 +     9.400  1674.500
  J1314+2348 sess119.C2048glob     1 2 8 9 10 11 12 13 14 15 1 +     4.900   880.698
  J1327+2210 sess119.C2048glob     1 2 8 9 10 11 12 13 14 15 1 +     1.617   292.649


EFFECT OF SOLAR CORONA

  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   IC860              143.1
   J1314+2348         143.5
   J1327+2210         141.4

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

