COVER INFORMATION Station: BADARY (Code Bd ) Experiment: L-band IRAS FSC10214 (Phase Referenced) Exp. Code: ED030A Schedule Version: 2.00 Processed by SCHED version: 9.30 Release near March 23, 2010 PI: Roger Deane Address: Oxford Astrophysics, Denys Wilkinson Building Keble Road Oxford UK Phone: +441865283025 EMAIL: roger.deane@astro.ox.ac.uk Fax: +441865273418 Phone during observation: +447595931511 Observing mode: Phase-referencing of a source at 18cm (1024 Mb/s) Notes: used SCHED version 9.3 v.2: Jb1 replaced with Jb2 Schedule for BADARY (Code Bd ) Page 2 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- ---------- fringe-finder ---------- Next scan frequencies: 1610.49 1610.49 1610.49 1610.49 1642.49 1642.49 1642.49 1642.49 1674.49 1674.49 1674.49 1674.49 1706.49 1706.49 1706.49 1706.49 Next BBC frequencies: 830.39 830.39 830.39 830.39 862.39 862.39 862.39 862.39 894.39 894.39 894.39 894.39 926.39 926.39 926.39 926.39 Next scan bandwidths: 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 16.00 02 00 00 4C39.25 11 33 54 64.7 612.1 2.1 49.3 0 1 1 0 02 00 00 02 07 00 --- 11 40 55 63.7 614.2 2.2 50.0 420 F 1 54 02 00 01 ---------- fringe-finder ---------- 02 07 00 4C39.25 11 40 55 63.7 614.2 2.2 50.0 -5 1 1 54 No stop 02 14 00 --- 11 47 57 62.6 616.1 2.3 50.6 415 F 1 108 02 07 01 02 14 30 PHCAL_CHECK 11 48 27 76.5 621.7 1.3 66.2 -8 1 1 108 02 14 30 02 18 30 --- 11 52 27 75.9 622.8 1.4 66.6 232 F 1 139 02 14 31 02 19 30 PHCAL 11 53 27 75.5 621.5 1.4 65.0 45 1 1 139 02 19 30 02 23 30 --- 11 57 28 74.9 622.6 1.5 65.3 240 F 1 170 02 19 31 02 23 30 IRAS10214 11 57 28 74.4 621.7 1.5 64.1 -13 1 1 170 No stop 02 31 30 --- 12 05 29 73.1 623.8 1.7 64.6 467 F 1 232 02 23 31 02 32 00 PHCAL 12 06 00 73.6 624.8 1.6 65.9 16 1 1 232 02 32 00 02 34 00 --- 12 08 00 73.3 625.3 1.7 66.0 120 F 1 248 02 32 01 02 34 00 IRAS10214 12 08 00 72.8 624.4 1.7 64.8 -13 1 1 248 No stop 02 42 00 --- 12 16 01 71.5 626.3 1.8 65.1 467 F 1 310 02 34 01 02 42 30 PHCAL 12 16 31 72.0 627.2 1.8 66.2 17 1 1 310 02 42 30 02 44 30 --- 12 18 32 71.6 627.6 1.9 66.3 120 F 1 325 02 42 31 02 44 30 IRAS10214 12 18 32 71.1 626.9 1.9 65.2 -13 1 1 325 No stop 02 52 30 --- 12 26 33 69.9 628.6 2.0 65.3 467 F 1 387 02 44 31 02 53 00 PHCAL 12 27 03 70.3 629.4 2.0 66.4 17 1 1 387 02 53 00 02 55 00 --- 12 29 03 70.0 629.8 2.0 66.4 120 F 1 403 02 53 01 Schedule for BADARY (Code Bd ) Page 3 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 02 55 00 IRAS10214 12 29 03 69.5 629.1 2.1 65.3 -12 1 1 403 No stop 03 03 00 --- 12 37 05 68.3 630.7 2.2 65.4 468 F 1 464 02 55 01 03 03 30 PHCAL 12 37 35 68.7 631.4 2.2 66.4 17 1 1 464 03 03 30 03 05 30 --- 12 39 35 68.4 631.8 2.2 66.3 120 F 1 480 03 03 31 03 05 30 IRAS10214 12 39 35 67.9 631.2 2.2 65.3 -12 1 1 480 No stop 03 13 30 --- 12 47 36 66.6 632.7 2.4 65.2 468 F 1 542 03 05 31 03 14 00 PHCAL_CHECK 12 48 06 67.3 634.4 2.3 67.2 13 1 1 542 03 14 00 03 16 00 --- 12 50 07 67.0 634.7 2.4 67.2 120 F 1 557 03 14 01 03 16 30 PHCAL 12 50 37 66.7 633.8 2.4 66.1 16 1 1 557 03 16 30 03 18 30 --- 12 52 37 66.4 634.1 2.4 66.1 120 F 1 573 03 16 31 03 18 30 IRAS10214 12 52 37 65.9 633.5 2.5 65.1 -12 1 1 573 No stop 03 26 30 --- 13 00 38 64.6 634.9 2.6 64.9 468 F 1 635 03 18 31 03 27 00 PHCAL 13 01 09 65.1 635.6 2.6 65.8 18 1 1 635 03 27 00 03 29 00 --- 13 03 09 64.7 635.9 2.6 65.7 120 F 1 650 03 27 01 03 29 00 IRAS10214 13 03 09 64.2 635.3 2.6 64.8 -12 1 1 650 No stop 03 37 00 --- 13 11 10 63.0 636.7 2.8 64.5 468 F 1 712 03 29 01 03 37 30 PHCAL 13 11 40 63.4 637.2 2.7 65.4 18 1 1 712 03 37 30 03 39 30 --- 13 13 41 63.1 637.6 2.8 65.3 120 F 1 728 03 37 31 03 39 30 IRAS10214 13 13 41 62.6 637.1 2.8 64.4 -11 1 1 728 No stop 03 47 30 --- 13 21 42 61.4 638.3 2.9 64.1 469 F 1 790 03 39 31 03 48 00 PHCAL 13 22 12 61.8 638.9 2.9 64.9 18 1 1 790 03 48 00 03 50 00 --- 13 24 12 61.5 639.2 2.9 64.8 120 F 1 805 03 48 01 03 50 00 IRAS10214 13 24 12 61.0 638.7 3.0 64.0 -11 1 1 805 No stop 03 58 00 --- 13 32 14 59.8 639.9 3.1 63.6 469 F 1 867 03 50 01 03 58 30 PHCAL 13 32 44 60.2 640.4 3.1 64.3 19 1 1 867 03 58 30 04 00 30 --- 13 34 44 59.9 640.7 3.1 64.2 120 F 1 883 03 58 31 04 00 30 IRAS10214 13 34 44 59.4 640.3 3.2 63.4 -11 1 1 883 No stop 04 08 30 --- 13 42 45 58.2 641.5 3.3 63.0 469 F 1 944 04 00 31 04 09 00 PHCAL_CHECK 13 43 15 58.9 642.7 3.3 64.4 15 1 1 944 04 09 00 04 11 00 --- 13 45 16 58.6 643.0 3.3 64.3 120 F 1 960 04 09 01 Schedule for BADARY (Code Bd ) Page 4 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 04 11 30 PHCAL 13 45 46 58.2 642.3 3.3 63.5 18 1 1 960 04 11 30 04 13 30 --- 13 47 46 57.9 642.6 3.3 63.4 120 F 1 975 04 11 31 04 13 30 IRAS10214 13 47 46 57.4 642.2 3.4 62.7 -11 1 1 975 No stop 04 21 30 --- 13 55 48 56.2 643.4 3.5 62.2 469 F 1 1037 04 13 31 04 22 00 PHCAL 13 56 18 56.7 643.8 3.5 62.8 19 1 1 1037 04 22 00 04 24 00 --- 13 58 18 56.4 644.1 3.5 62.7 120 F 1 1053 04 22 01 04 24 00 IRAS10214 13 58 18 55.8 643.7 3.6 62.0 -11 1 1 1053 No stop 04 32 00 --- 14 06 19 54.6 644.9 3.7 61.5 469 F 1 1115 04 24 01 04 32 30 PHCAL 14 06 49 55.1 645.3 3.7 62.1 19 1 1 1115 04 32 30 04 34 30 --- 14 08 50 54.8 645.6 3.7 62.0 120 F 1 1130 04 32 31 04 34 30 IRAS10214 14 08 50 54.3 645.2 3.7 61.3 -11 1 1 1130 No stop 04 42 30 --- 14 16 51 53.1 646.3 3.9 60.7 469 F 1 1192 04 34 31 04 43 00 PHCAL 14 17 21 53.5 646.7 3.8 61.3 19 1 1 1192 04 43 00 04 45 00 --- 14 19 21 53.2 647.0 3.9 61.2 120 F 1 1208 04 43 01 04 45 00 IRAS10214 14 19 21 52.7 646.7 3.9 60.5 -12 1 1 1208 No stop 04 53 00 --- 14 27 23 51.5 647.8 4.0 59.9 468 F 1 1270 04 45 01 04 53 30 PHCAL 14 27 53 52.0 648.2 4.0 60.5 19 1 1 1270 04 53 30 04 55 30 --- 14 29 53 51.7 648.4 4.0 60.4 120 F 1 1285 04 53 31 04 55 30 IRAS10214 14 29 53 51.1 648.1 4.1 59.7 -12 1 1 1285 No stop 05 03 30 --- 14 37 54 50.0 649.2 4.2 59.1 468 F 1 1347 04 55 31 05 04 00 PHCAL_CHECK 14 38 24 50.7 650.2 4.2 60.2 16 1 1 1347 05 04 00 05 06 00 --- 14 40 25 50.4 650.4 4.2 60.1 120 F 1 1362 05 04 01 05 06 30 PHCAL 14 40 55 50.1 649.9 4.2 59.5 19 1 1 1362 05 06 30 05 08 30 --- 14 42 55 49.8 650.2 4.3 59.3 120 F 1 1378 05 06 31 05 08 30 IRAS10214 14 42 55 49.2 649.9 4.3 58.7 -12 1 1 1378 No stop 05 16 30 --- 14 50 57 48.1 651.0 4.4 58.1 468 F 1 1440 05 08 31 05 17 00 PHCAL 14 51 27 48.5 651.3 4.4 58.6 19 1 1 1440 05 17 00 05 19 00 --- 14 53 27 48.2 651.6 4.4 58.4 120 F 1 1455 05 17 01 05 19 00 IRAS10214 14 53 27 47.7 651.3 4.5 57.9 -12 1 1 1455 No stop 05 27 00 --- 15 01 28 46.5 652.4 4.6 57.2 468 F 1 1517 05 19 01 Schedule for BADARY (Code Bd ) Page 5 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 05 27 30 PHCAL 15 01 58 47.0 652.7 4.6 57.7 19 1 1 1517 05 27 30 05 29 30 --- 15 03 59 46.7 653.0 4.6 57.5 120 F 1 1533 05 27 31 05 29 30 IRAS10214 15 03 59 46.2 652.7 4.6 57.0 -12 1 1 1533 No stop 05 37 30 --- 15 12 00 45.1 653.8 4.8 56.3 468 F 1 1595 05 29 31 05 38 00 PHCAL 15 12 30 45.5 654.1 4.8 56.8 19 1 1 1595 05 38 00 05 40 00 --- 15 14 30 45.2 654.4 4.8 56.6 120 F 1 1610 05 38 01 05 40 00 IRAS10214 15 14 30 44.7 654.1 4.8 56.0 -12 1 1 1610 No stop 05 48 00 --- 15 22 32 43.6 655.2 5.0 55.3 468 F 1 1672 05 40 01 05 48 30 PHCAL 15 23 02 44.0 655.5 4.9 55.8 19 1 1 1672 05 48 30 05 50 30 --- 15 25 02 43.8 655.8 5.0 55.6 120 F 1 1688 05 48 31 05 50 30 IRAS10214 15 25 02 43.2 655.6 5.0 55.1 -12 1 1 1688 No stop 05 58 30 --- 15 33 03 42.1 656.6 5.1 54.3 468 F 1 1750 05 50 31 05 59 00 PHCAL_CHECK 15 33 34 42.9 657.3 5.1 55.2 17 1 1 1750 05 59 00 06 01 00 --- 15 35 34 42.6 657.6 5.1 55.0 120 F 1 1765 05 59 01 06 01 30 PHCAL 15 36 04 42.2 657.2 5.1 54.6 19 1 1 1765 06 01 30 06 03 30 --- 15 38 04 42.0 657.5 5.2 54.4 120 F 1 1781 06 01 31 ---------- fringe-finder ---------- 06 05 30 4C39.25 15 40 05 27.9 658.5 6.2 44.4 81 1 1 1781 06 05 30 06 13 30 --- 15 48 06 26.8 659.8 6.3 43.7 480 F 1 1842 06 05 31 ---------- fringe-finder ---------- 06 15 30 4C39.25 15 50 06 26.6 660.1 6.4 43.5 110 1 1 1842 06 15 30 06 23 30 --- 15 58 08 25.5 661.4 6.5 42.8 480 F 1 1904 06 15 31 06 23 30 IRAS10214 15 58 08 38.7 660.0 5.5 51.9 -37 1 1 1904 No stop 06 31 30 --- 16 06 09 37.6 661.1 5.7 51.1 443 F 1 1966 06 23 31 06 32 00 PHCAL 16 06 39 38.1 661.3 5.7 51.6 19 1 1 1966 06 32 00 06 34 00 --- 16 08 39 37.8 661.5 5.7 51.4 120 F 1 1982 06 32 01 06 34 00 IRAS10214 16 08 39 37.3 661.4 5.7 50.9 -12 1 1 1982 No stop 06 42 00 --- 16 16 41 36.2 662.5 5.9 50.1 468 F 1 2044 06 34 01 Schedule for BADARY (Code Bd ) Page 6 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 06 42 30 PHCAL 16 17 11 36.7 662.7 5.8 50.5 19 1 1 2044 06 42 30 06 44 30 --- 16 19 11 36.5 662.9 5.9 50.3 120 F 1 2059 06 42 31 06 44 30 IRAS10214 16 19 11 35.9 662.8 5.9 49.8 -12 1 1 2059 No stop 06 52 30 --- 16 27 12 34.9 663.9 6.0 49.0 468 F 1 2121 06 44 31 06 53 00 PHCAL 16 27 42 35.4 664.1 6.0 49.4 19 1 1 2121 06 53 00 06 55 00 --- 16 29 43 35.1 664.4 6.0 49.2 120 F 1 2137 06 53 01 06 55 00 IRAS10214 16 29 43 34.6 664.3 6.1 48.7 -12 1 1 2137 No stop 07 03 00 --- 16 37 44 33.5 665.4 6.2 47.8 468 F 1 2199 06 55 01 07 03 30 PHCAL 16 38 14 34.0 665.5 6.2 48.2 19 1 1 2199 07 03 30 07 05 30 --- 16 40 14 33.8 665.8 6.2 48.0 120 F 1 2214 07 03 31 07 05 30 IRAS10214 16 40 14 33.2 665.7 6.2 47.6 -12 1 1 2214 No stop 07 13 30 --- 16 48 16 32.2 666.8 6.4 46.7 468 F 1 2276 07 05 31 07 14 00 PHCAL_CHECK 16 48 46 33.1 667.3 6.3 47.4 17 1 1 2276 07 14 00 07 16 00 --- 16 50 46 32.8 667.6 6.4 47.1 120 F 1 2291 07 14 01 07 16 30 PHCAL 16 51 16 32.4 667.3 6.4 46.8 19 1 1 2291 07 16 30 07 18 30 --- 16 53 17 32.2 667.6 6.4 46.6 120 F 1 2307 07 16 31 07 18 30 IRAS10214 16 53 17 31.6 667.5 6.5 46.1 -12 1 1 2307 No stop 07 26 30 --- 17 01 18 30.6 668.6 6.6 45.3 468 F 1 2369 07 18 31 07 27 00 PHCAL 17 01 48 31.1 668.7 6.6 45.6 19 1 1 2369 07 27 00 07 29 00 --- 17 03 48 30.9 669.0 6.6 45.4 120 F 1 2384 07 27 01 07 29 00 IRAS10214 17 03 48 30.3 669.0 6.6 45.0 -12 1 1 2384 No stop 07 37 00 --- 17 11 50 29.4 670.1 6.8 44.1 468 F 1 2446 07 29 01 07 37 30 PHCAL 17 12 20 29.9 670.2 6.7 44.4 19 1 1 2446 07 37 30 07 39 30 --- 17 14 20 29.6 670.5 6.8 44.2 120 F 1 2462 07 37 31 07 39 30 IRAS10214 17 14 20 29.1 670.4 6.8 43.8 -12 1 1 2462 No stop 07 47 30 --- 17 22 21 28.1 671.6 7.0 42.8 468 F 1 2524 07 39 31 07 48 00 PHCAL 17 22 51 28.6 671.7 6.9 43.2 19 1 1 2524 07 48 00 07 50 00 --- 17 24 52 28.4 671.9 7.0 43.0 120 F 1 2539 07 48 01 07 50 00 IRAS10214 17 24 52 27.8 671.9 7.0 42.6 -12 1 1 2539 No stop 07 58 00 --- 17 32 53 26.9 673.1 7.1 41.6 468 F 1 2601 07 50 01 Schedule for BADARY (Code Bd ) Page 7 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 07 58 30 PHCAL 17 33 23 27.4 673.1 7.1 42.0 19 1 1 2601 07 58 30 08 00 30 --- 17 35 23 27.2 673.4 7.1 41.7 120 F 1 2617 07 58 31 08 00 30 IRAS10214 17 35 23 26.6 673.4 7.2 41.3 -12 1 1 2617 No stop 08 08 30 --- 17 43 25 25.8 674.6 7.3 40.4 468 F 1 2679 08 00 31 08 09 00 PHCAL_CHECK 17 43 55 26.7 674.9 7.3 40.9 16 1 1 2679 08 09 00 08 11 00 --- 17 45 55 26.5 675.2 7.3 40.7 120 F 1 2694 08 09 01 08 11 30 PHCAL 17 46 25 26.0 675.0 7.3 40.4 19 1 1 2694 08 11 30 08 13 30 --- 17 48 26 25.8 675.3 7.4 40.1 120 F 1 2710 08 11 31 08 13 30 IRAS10214 17 48 26 25.2 675.3 7.4 39.7 -12 1 1 2710 No stop 08 21 30 --- 17 56 27 24.3 676.5 7.5 38.8 468 F 1 2771 08 13 31 08 22 00 PHCAL 17 56 57 24.8 676.5 7.5 39.1 19 1 1 2771 08 22 00 08 24 00 --- 17 58 57 24.6 676.8 7.5 38.8 120 F 1 2787 08 22 01 08 24 00 IRAS10214 17 58 57 24.1 676.8 7.6 38.5 -12 1 1 2787 No stop 08 32 00 --- 18 06 59 23.2 678.0 7.7 37.5 468 F 1 2849 08 24 01 08 32 30 PHCAL 18 07 29 23.7 678.0 7.7 37.8 19 1 1 2849 08 32 30 08 34 30 --- 18 09 29 23.5 678.3 7.7 37.5 120 F 1 2864 08 32 31 08 34 30 IRAS10214 18 09 29 23.0 678.4 7.7 37.1 -12 1 1 2864 No stop 08 42 30 --- 18 17 30 22.2 679.6 7.9 36.1 468 F 1 2926 08 34 31 08 43 00 PHCAL 18 18 00 22.7 679.6 7.8 36.4 19 1 1 2926 08 43 00 08 45 00 --- 18 20 01 22.5 679.9 7.9 36.2 120 F 1 2942 08 43 01 08 45 00 IRAS10214 18 20 01 21.9 679.9 7.9 35.8 -12 1 1 2942 No stop 08 53 00 --- 18 28 02 21.1 681.1 8.0 34.8 468 F 1 3004 08 45 01 08 53 30 PHCAL 18 28 32 21.6 681.1 8.0 35.1 19 1 1 3004 08 53 30 08 55 30 --- 18 30 33 21.4 681.4 8.1 34.8 120 F 1 3019 08 53 31 08 55 30 IRAS10214 18 30 33 20.9 681.5 8.1 34.5 -12 1 1 3019 No stop 09 03 30 --- 18 38 34 20.1 682.7 8.2 33.4 468 F 1 3081 08 55 31 09 04 00 PHCAL_CHECK 18 39 04 21.1 682.9 8.2 33.9 16 1 1 3081 09 04 00 09 06 00 --- 18 41 04 20.9 683.2 8.2 33.6 120 F 1 3097 09 04 01 09 06 30 PHCAL 18 41 34 20.4 683.1 8.2 33.4 19 1 1 3097 09 06 30 09 08 30 --- 18 43 35 20.2 683.4 8.3 33.1 120 F 1 3112 09 06 31 Schedule for BADARY (Code Bd ) Page 8 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 09 08 30 IRAS10214 18 43 35 19.6 683.5 8.3 32.7 -12 1 1 3112 No stop 09 16 30 --- 18 51 36 18.9 684.7 8.4 31.7 468 F 1 3174 09 08 31 09 17 00 PHCAL 18 52 06 19.4 684.7 8.4 32.0 19 1 1 3174 09 17 00 09 19 00 --- 18 54 06 19.3 685.0 8.4 31.7 120 F 1 3189 09 17 01 09 19 00 IRAS10214 18 54 06 18.7 685.1 8.5 31.3 -12 1 1 3189 No stop 09 27 00 --- 19 02 08 18.0 686.3 8.6 30.3 468 F 1 3251 09 19 01 09 27 30 PHCAL 19 02 38 18.5 686.3 8.6 30.6 19 1 1 3251 09 27 30 09 29 30 --- 19 04 38 18.3 686.6 8.6 30.3 120 F 1 3267 09 27 31 09 29 30 IRAS10214 19 04 38 17.8 686.7 8.7 29.9 -12 1 1 3267 No stop 09 37 30 --- 19 12 39 17.1 688.0 8.8 28.8 468 F 1 3329 09 29 31 09 38 00 PHCAL 19 13 10 17.6 687.9 8.8 29.1 19 1 1 3329 09 38 00 09 40 00 --- 19 15 10 17.5 688.2 8.8 28.9 120 F 1 3344 09 38 01 09 40 00 IRAS10214 19 15 10 16.9 688.3 8.8 28.5 -12 1 1 3344 No stop 09 48 00 --- 19 23 11 16.3 689.6 9.0 27.4 468 F 1 3406 09 40 01 09 48 30 PHCAL 19 23 41 16.8 689.5 8.9 27.7 19 1 1 3406 09 48 30 09 50 30 --- 19 25 42 16.6 689.9 9.0 27.4 120 F 1 3422 09 48 31 09 50 30 IRAS10214 19 25 42 16.1 690.0 9.0 27.0 -12 1 1 3422 No stop 09 58 30 --- 19 33 43 15.5 691.3 9.1 25.9 468 F 1 3484 09 50 31 09 59 00 PHCAL_CHECK 19 34 13 16.4 691.3 9.1 26.3 16 1 1 3484 09 59 00 10 01 00 --- 19 36 13 16.3 691.7 9.1 26.0 120 F 1 3499 09 59 01 10 01 30 PHCAL 19 36 43 15.8 691.6 9.2 25.8 19 1 1 3499 10 01 30 10 03 30 --- 19 38 44 15.6 691.9 9.2 25.6 120 F 1 3515 10 01 31 10 03 30 IRAS10214 19 38 44 15.1 692.1 9.2 25.2 -12 1 1 3515 No stop 10 11 30 --- 19 46 45 14.5 693.4 9.4 24.1 468 F 1 3577 10 03 31 10 12 00 PHCAL 19 47 15 15.0 693.3 9.3 24.3 19 1 1 3577 10 12 00 10 14 00 --- 19 49 15 14.9 693.6 9.4 24.1 120 F 1 3592 10 12 01 10 14 00 IRAS10214 19 49 15 14.4 693.8 9.4 23.7 -12 1 1 3592 No stop 10 22 00 --- 19 57 17 13.8 695.0 9.5 22.5 468 F 1 3654 10 14 01 10 22 30 PHCAL 19 57 47 14.3 694.9 9.5 22.8 19 1 1 3654 10 22 30 10 24 30 --- 19 59 47 14.2 695.3 9.5 22.5 120 F 1 3669 10 22 31 Schedule for BADARY (Code Bd ) Page 9 L-band IRAS FSC10214 (Phase Referenced) UP: D => Below limits; H => Below horizon mask. blank => Up. Early: Seconds between end of slew and start. Dwell: On source seconds. Tapes: Drive, Index, Start footage / Direction, Head Group, End footage. For disks, the footages are really the GBytes TPStart: Tape motion start time. Frequencies are LO sum (band edge). SYNC: Time correlator is expected to sync up. ---------------------------------------------------------------------------------------- Start UT Source Start / Stop Early Tapes TPStart Stop UT LST EL AZ HA UP ParA Dwell (see above) SYNC ---------------------------------------------------------------------------------------- --- Tue 2 Nov 2010 Day 306 --- 10 24 30 IRAS10214 19 59 47 13.7 695.5 9.6 22.2 -12 1 1 3669 No stop 10 32 30 --- 20 07 48 13.2 696.8 9.7 21.0 468 F 1 3731 10 24 31 10 33 00 PHCAL 20 08 19 13.7 696.6 9.7 21.3 19 1 1 3731 10 33 00 10 35 00 --- 20 10 19 13.5 697.0 9.7 21.0 120 F 1 3747 10 33 01 10 35 00 IRAS10214 20 10 19 13.0 697.2 9.8 20.7 -12 1 1 3747 No stop 10 43 00 --- 20 18 20 12.5 698.5 9.9 19.5 468 F 1 3809 10 35 01 10 43 30 PHCAL_CHECK 20 18 50 13.5 698.4 9.8 19.9 16 1 1 3809 10 43 30 10 45 30 --- 20 20 51 13.4 698.8 9.9 19.6 120 F 1 3824 10 43 31 10 46 00 PHCAL 20 21 21 12.9 698.8 9.9 19.4 19 1 1 3824 10 46 00 10 48 00 --- 20 23 21 12.8 699.1 9.9 19.1 120 F 1 3840 10 46 01 10 48 00 IRAS10214 20 23 21 12.3 699.3 10.0 18.7 -11 1 1 3840 No stop 10 56 00 --- 20 31 22 11.8 700.6 10.1 17.5 469 F 1 3902 10 48 01 10 56 30 PHCAL 20 31 52 12.3 700.5 10.1 17.8 19 1 1 3902 10 56 30 10 58 30 --- 20 33 53 12.2 700.8 10.1 17.5 120 F 1 3917 10 56 31 SETUP FILE INFORMATION: NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings. Setup file: ed030.18cm --- WARNING --- This group does not match an entry in the frequency catalog. This might be ok because the catalog is not complete. But be very careful to be sure that the setup is correct. Setup group: 10 Station: BADARY Total bit rate: 1024 Format: MKIV1:2 Bits per sample: 2 Sample rate: 32.000 Number of channels: 16 Speedup factor: 0.50 Disk used to record data. 1st LO= 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 780.10 Net SB= L L U U L L U U L L U U L L U U Pol. = RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP RCP LCP BBC = 1 2 1 2 3 6 3 6 4 7 4 7 5 8 5 8 BBC SB= L L U U L L U U L L U U L L U U IF = A C A C A C A C A C A C A C A C The following frequency sets based on this setup were used. Frequency Set: 10 Setup file default. Used pcal sets: 1 LO sum= 1610.49 1610.49 1610.49 1610.49 1642.49 1642.49 1642.49 1642.49 1674.49 1674.49 1674.49 1674.49 1706.49 1706.49 1706.49 1706.49 BBC fr= 830.39 830.39 830.39 830.39 862.39 862.39 862.39 862.39 894.39 894.39 894.39 894.39 926.39 926.39 926.39 926.39 Bandwd= 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 16.000 The following pulse cal sets were used with this setup: Pulse cal detection set: 1 PCAL = 1MHZ PCALXB1= S1 S3 S5 S7 S9 S11 S13 S15 PCALXB2= S2 S4 S6 S8 S10 S12 S14 S16 PCALFR1= 490 510 490 510 490 510 490 510 PCALFR2= 490 510 490 510 490 510 490 510 Track assignments are: track1= 2, 10, 18, 26, 3, 11, 19, 27, 66, 74, 82, 90, 67, 75, 83, 91 barrel=roll_off SOURCE LIST -- L-band IRAS FSC10214 (Phase Referenced) Catalog positions marked with *. Precession of date coordinates is based on stop time of first scan. Names used in schedule marked with *. Short names used in VLA and SNAP files marked with +. Observation date used in B1950/J2000 coordinate conversion (PRECDATE): 1979.900 No adjustments are made for rates (DRA, DDEC). Scan hours are for recording scans only. Baseline hours are only counted for scans above horizon at both ends. Source Source position (RA/Dec) Error (B1950) (J2000) (Date) (mas) * PHCAL_CHECK 10 24 09.465354 * 10 27 13.079936 10 27 53.139249 0.00 48 18 31.77681 * 48 03 13.53507 47 59 39.34258 0.00 From catalog imbedded in main SCHED input file. 0.367 scan hours, 15.340 baseline hours above horizon. * PHCAL 10 23 41.880592 * 10 26 45.139600 10 27 25.131988 0.00 47 50 09.11082 * 47 34 51.67860 47 31 17.79292 0.00 From catalog imbedded in main SCHED input file. 1.567 scan hours, 67.364 baseline hours above horizon. * IRAS10214 10 21 31.104606 * 10 24 34.551600 10 25 14.609705 0.00 47 24 23.24290 * 47 09 09.67650 47 05 36.71729 0.00 From catalog imbedded in main SCHED input file. 6.000 scan hours, 246.792 baseline hours above horizon. J0927+3902 09 23 55.319215 * 09 27 03.013936 09 27 44.533726 0.01 0923+392 39 15 23.56644 * 39 02 20.85184 38 59 18.51598 0.01 * 4C39.25 /aps3/sched9.3/catalogs/sources.vlba J0927+39 GSFC Nov. 2009 Solution 2009a 226075 Observations 0.500 scan hours, 21.517 baseline hours above horizon. The solar corona can cause unstable phases for sources too close to the Sun. SCHED provides warnings at individual scans for distances less than 10 degrees. The distance from the Sun to each source in this schedule is: Source Sun distance (deg) PHCAL_CHECK 82.5 PHCAL 82.3 IRAS10214 82.4 4C39.25 88.3 Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes that the Sun will cause amplitude reductions on the longest VLBA baselines at a solar distance of 60deg F^(-0.6) where F is in GHz. For common VLBI bands, this is: 327 MHz 117. deg 610 MHz 81. deg 1.6 GHz 45. deg 2.3 GHz 36. deg 5.0 GHz 23. deg 8.4 GHz 17. deg 15.0 GHz 12. deg 22.0 GHz 9. deg 43.0 GHz 6. deg