  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: EVN: EM130A
 Exp. Code:  EM130A  


Schedule Version:       2.00
Processed by SCHED version:  11.40  Release 11.4.  March 14, 2015

PI:       Marcote

Address:  JIVE
          Oude Hoogeveensedijk 4
          Dwingeloo
          Netherlands

Phone:    +31 521 596 508
EMAIL:    marcote@jive.eu
Fax:      +31 521 596 508
Phone during observation: +31 521 596 508

Observing mode: vlbi

Notes:    ###########################################################
          ########## Please, make sure PHASE CAL is OFF. ############
          ###########################################################
 

Schedule for HART      (Code Hh )                                   Page   2
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  31 Oct 2017   Day 304 ---

 Next scan frequencies:  1610.49  1610.49  1610.49  1610.49  1642.49  1642.49  1642.49  1642.49
                         1674.49  1674.49  1674.49  1674.49  1706.49  1706.49  1706.49  1706.49
 Next BBC frequencies:    100.49   100.49   100.49   100.49   132.49   132.49   132.49   132.49
                          164.49   164.49   164.49   164.49   196.49   196.49   196.49   196.49
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00

22 00 00  0528+134     02 32 19  31.1  53.3 -3.0       0.0     0        0   22 00 00
22 07 00  ---          02 39 20  32.4  52.0 -2.9       0.0   420       54   22 00 01

22 09 00  J0716-1813   02 41 20  25.9  98.7 -4.6       0.0    29       54   22 09 00
22 12 00  ---          02 44 21  26.6  98.4 -4.6       0.0   180       77   22 09 01

22 12 00  POINT1       02 44 21  27.3  99.1 -4.5       0.0   -27       77   No stop 
22 15 00  ---          02 47 21  27.9  98.8 -4.5       0.0   153      100   22 12 01

22 15 00  J0716-1813   02 47 21  27.3  98.1 -4.5       0.0   -27      100   No stop 
22 16 30  ---          02 48 51  27.6  98.0 -4.5       0.0    63      112   22 15 01

22 16 30  POINT2       02 48 51  28.4  98.8 -4.5       0.0   -27      112   No stop 
22 19 30  ---          02 51 52  29.0  98.5 -4.4       0.0   153      135   22 16 31

22 20 00  J0716-1813   02 52 22  28.4  97.7 -4.4       0.0     3      135   22 20 00
22 21 00  ---          02 53 22  28.6  97.6 -4.4       0.0    60      143   22 20 01

22 21 00  POINT1       02 53 22  29.3  98.2 -4.4       0.0   -27      143   No stop 
22 24 00  ---          02 56 23  29.9  98.0 -4.3       0.0   153      166   22 21 01

22 24 00  J0716-1813   02 56 23  29.3  97.3 -4.4       0.0   -27      166   No stop 
22 25 30  ---          02 57 53  29.6  97.2 -4.4       0.0    63      178   22 24 01

22 25 30  POINT3       02 57 53  30.1  97.6 -4.3       0.0   -26      178   No stop 
22 28 30  ---          03 00 53  30.8  97.3 -4.3       0.0   154      201   22 25 31

22 28 30  J0716-1813   03 00 53  30.3  96.9 -4.3       0.0   -26      201   No stop 
22 30 00  ---          03 02 24  30.6  96.7 -4.3       0.0    64      213   22 28 31

22 30 00  POINT2       03 02 24  31.4  97.6 -4.2       0.0   -27      213   No stop 
22 33 00  ---          03 05 24  32.0  97.3 -4.2       0.0   153      236   22 30 01

22 33 30  J0716-1813   03 05 54  31.4  96.4 -4.2       0.0     3      236   22 33 30
22 34 30  ---          03 06 54  31.6  96.3 -4.2       0.0    60      243   22 33 31

22 34 30  POINT1       03 06 54  32.3  97.0 -4.2       0.0   -27      243   No stop 
22 37 30  ---          03 09 55  32.9  96.7 -4.1       0.0   153      267   22 34 31
Schedule for HART      (Code Hh )                                   Page   3
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  31 Oct 2017   Day 304 ---

22 37 30  J0716-1813   03 09 55  32.3  96.0 -4.2       0.0   -27      267   No stop 
22 39 00  ---          03 11 25  32.6  95.9 -4.1       0.0    63      278   22 37 31

22 39 00  J0712-1847   03 11 25  34.2  96.0 -4.0       0.0   -29      278   No stop 
22 42 00  ---          03 14 26  34.8  95.7 -4.0       0.0   151      301   22 39 01

22 42 40  J0716-1813   03 15 06  33.4  95.5 -4.1       0.0    11      301   22 42 40
22 43 30  ---          03 15 56  33.6  95.5 -4.1       0.0    50      308   22 42 41

22 43 30  POINT1       03 15 56  34.3  96.2 -4.0       0.0   -27      308   No stop 
22 46 30  ---          03 18 56  35.0  95.9 -4.0       0.0   153      331   22 43 31

22 46 30  J0716-1813   03 18 56  34.3  95.2 -4.0       0.0   -27      331   No stop 
22 48 00  ---          03 20 27  34.6  95.0 -4.0       0.0    63      343   22 46 31

22 48 00  POINT2       03 20 27  35.4  95.9 -3.9       0.0   -27      343   No stop 
22 51 00  ---          03 23 27  36.1  95.7 -3.9       0.0   153      366   22 48 01

22 51 30  J0716-1813   03 23 57  35.4  94.7 -3.9       0.0     3      366   22 51 30
22 52 30  ---          03 24 57  35.7  94.6 -3.9       0.0    60      374   22 51 31

22 52 30  POINT1       03 24 57  36.3  95.3 -3.9       0.0   -27      374   No stop 
22 55 30  ---          03 27 58  37.0  95.0 -3.8       0.0   153      397   22 52 31

22 55 30  J0716-1813   03 27 58  36.3  94.3 -3.9       0.0   -27      397   No stop 
22 57 00  ---          03 29 28  36.7  94.2 -3.8       0.0    63      408   22 55 31

22 57 00  POINT3       03 29 28  37.2  94.7 -3.8       0.0   -26      408   No stop 
23 00 00  ---          03 32 29  37.8  94.4 -3.8       0.0   154      432   22 57 01

23 00 00  J0716-1813   03 32 29  37.3  93.9 -3.8       0.0   -26      432   No stop 
23 01 30  ---          03 33 59  37.7  93.7 -3.8       0.0    64      443   23 00 01

23 01 30  POINT2       03 33 59  38.4  94.7 -3.7       0.0   -27      443   No stop 
23 04 30  ---          03 36 59  39.1  94.4 -3.7       0.0   153      466   23 01 31

23 05 00  J0716-1813   03 37 29  38.5  93.4 -3.7       0.0     3      466   23 05 00
23 06 00  ---          03 38 30  38.7  93.3 -3.7       0.0    60      474   23 05 01

23 06 00  POINT1       03 38 30  39.3  94.0 -3.6       0.0   -27      474   No stop 
23 09 00  ---          03 41 30  40.0  93.7 -3.6       0.0   153      497   23 06 01

23 09 00  J0716-1813   03 41 30  39.4  93.0 -3.6       0.0   -27      497   No stop 
23 10 30  ---          03 43 00  39.7  92.8 -3.6       0.0    63      509   23 09 01
Schedule for HART      (Code Hh )                                   Page   4
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  31 Oct 2017   Day 304 ---

23 10 30  J0712-1847   03 43 00  41.2  93.0 -3.5       0.0   -29      509   No stop 
23 13 30  ---          03 46 01  41.9  92.7 -3.5       0.0   151      532   23 10 31

23 14 10  J0716-1813   03 46 41  40.5  92.5 -3.5       0.0    11      532   23 14 10
23 15 00  ---          03 47 31  40.7  92.4 -3.5       0.0    50      538   23 14 11

23 15 00  POINT1       03 47 31  41.4  93.2 -3.5       0.0   -27      538   No stop 
23 18 00  ---          03 50 32  42.0  92.9 -3.4       0.0   153      562   23 15 01

23 18 00  J0716-1813   03 50 32  41.4  92.1 -3.5       0.0   -27      562   No stop 
23 19 30  ---          03 52 02  41.7  91.9 -3.4       0.0    63      573   23 18 01

23 19 30  POINT2       03 52 02  42.5  92.9 -3.4       0.0   -27      573   No stop 
23 22 30  ---          03 55 02  43.2  92.6 -3.4       0.0   153      596   23 19 31

23 23 00  J0716-1813   03 55 32  42.5  91.6 -3.4       0.0     3      596   23 23 00
23 24 00  ---          03 56 33  42.8  91.5 -3.4       0.0    60      604   23 23 01

23 24 00  POINT1       03 56 33  43.4  92.3 -3.3       0.0   -27      604   No stop 
23 27 00  ---          03 59 33  44.1  92.0 -3.3       0.0   153      627   23 24 01

23 27 00  J0716-1813   03 59 33  43.4  91.1 -3.3       0.0   -27      627   No stop 
23 28 30  ---          04 01 03  43.8  91.0 -3.3       0.0    63      639   23 27 01

23 28 30  POINT3       04 01 03  44.3  91.5 -3.3       0.0   -26      639   No stop 
23 31 30  ---          04 04 04  44.9  91.2 -3.2       0.0   154      662   23 28 31

23 31 30  J0716-1813   04 04 04  44.4  90.7 -3.2       0.0   -26      662   No stop 
23 33 00  ---          04 05 34  44.8  90.5 -3.2       0.0    64      674   23 31 31

23 33 00  POINT2       04 05 34  45.5  91.6 -3.2       0.0   -27      674   No stop 
23 36 00  ---          04 08 34  46.2  91.2 -3.1       0.0   153      697   23 33 01

23 36 30  J0716-1813   04 09 05  45.6  90.1 -3.2       0.0     3      697   23 36 30
23 37 30  ---          04 10 05  45.8  90.0 -3.1       0.0    60      705   23 36 31

23 37 30  POINT1       04 10 05  46.4  90.9 -3.1       0.0   -27      705   No stop 
23 40 30  ---          04 13 05  47.1  90.6 -3.1       0.0   153      728   23 37 31

23 40 30  J0716-1813   04 13 05  46.5  89.7 -3.1       0.0   -27      728   No stop 
23 42 00  ---          04 14 35  46.8  89.5 -3.1       0.0    63      739   23 40 31

23 42 00  J0712-1847   04 14 35  48.3  89.7 -3.0       0.0   -29      739   No stop 
23 45 00  ---          04 17 36  49.0  89.3 -2.9       0.0   151      763   23 42 01
Schedule for HART      (Code Hh )                                   Page   5
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue  31 Oct 2017   Day 304 ---

23 45 40  J0716-1813   04 18 16  47.6  89.1 -3.0       0.0    11      763   23 45 40
23 46 30  ---          04 19 06  47.8  89.0 -3.0       0.0    50      769   23 45 41

23 46 30  POINT1       04 19 06  48.5  89.9 -3.0       0.0   -27      769   No stop 
23 49 30  ---          04 22 07  49.1  89.6 -2.9       0.0   153      792   23 46 31

23 49 30  J0716-1813   04 22 07  48.5  88.7 -2.9       0.0   -27      792   No stop 
23 51 00  ---          04 23 37  48.8  88.5 -2.9       0.0    63      804   23 49 31

23 51 00  POINT2       04 23 37  49.6  89.6 -2.9       0.0   -27      804   No stop 
23 54 00  ---          04 26 37  50.3  89.3 -2.8       0.0   153      827   23 51 01

23 54 30  J0716-1813   04 27 08  49.6  88.1 -2.9       0.0     3      827   23 54 30
23 55 30  ---          04 28 08  49.9  88.0 -2.8       0.0    60      835   23 54 31

23 55 30  POINT1       04 28 08  50.5  88.9 -2.8       0.0   -27      835   No stop 
23 58 30  ---          04 31 08  51.2  88.5 -2.8       0.0   153      858   23 55 31

23 58 30  J0716-1813   04 31 08  50.5  87.6 -2.8       0.0   -27      858   No stop 
23 59 59  ---          04 32 38  50.9  87.4 -2.8       0.0    62      870   23 58 31

 --- Wed   1 Nov 2017   Day 305 ---

00 00 00  POINT3       04 32 38  51.4  88.1 -2.7       0.0   -26      870   No stop 
00 03 00  ---          04 35 39  52.0  87.7 -2.7       0.0   154      893   00 00 00

00 03 00  J0716-1813   04 35 39  51.5  87.1 -2.7       0.0   -26      893   No stop 
00 04 30  ---          04 37 09  51.9  86.9 -2.7       0.0    64      904   00 03 01

00 04 30  POINT2       04 37 09  52.6  88.1 -2.7       0.0   -27      904   No stop 
00 07 30  ---          04 40 10  53.3  87.7 -2.6       0.0   153      927   00 04 31

00 08 00  J0716-1813   04 40 40  52.7  86.4 -2.6       0.0     3      927   00 08 00
00 09 00  ---          04 41 40  52.9  86.3 -2.6       0.0    60      935   00 08 01

00 09 00  POINT1       04 41 40  53.5  87.3 -2.6       0.0   -27      935   No stop 
00 12 00  ---          04 44 40  54.2  86.9 -2.5       0.0   153      958   00 09 01

00 12 00  J0716-1813   04 44 40  53.6  85.9 -2.6       0.0   -27      958   No stop 
00 13 30  ---          04 46 11  53.9  85.7 -2.5       0.0    63      970   00 12 01

00 13 30  J0712-1847   04 46 11  55.4  85.9 -2.4       0.0   -29      970   No stop 
00 16 30  ---          04 49 11  56.1  85.5 -2.4       0.0   151      993   00 13 31
Schedule for HART      (Code Hh )                                   Page   6
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

00 17 10  J0716-1813   04 49 51  54.7  85.2 -2.5       0.0    11      993   00 17 10
00 18 00  ---          04 50 41  54.9  85.1 -2.5       0.0    50     1000   00 17 11

00 18 00  POINT1       04 50 41  55.6  86.1 -2.4       0.0   -27     1000   No stop 
00 21 00  ---          04 53 42  56.2  85.7 -2.4       0.0   153     1023   00 18 01

00 21 00  J0716-1813   04 53 42  55.6  84.7 -2.4       0.0   -27     1023   No stop 
00 22 30  ---          04 55 12  55.9  84.5 -2.4       0.0    63     1034   00 21 01

00 22 30  POINT2       04 55 12  56.7  85.8 -2.4       0.0   -27     1034   No stop 
00 25 30  ---          04 58 13  57.4  85.4 -2.3       0.0   153     1058   00 22 31

00 26 00  J0716-1813   04 58 43  56.7  84.0 -2.3       0.0     3     1058   00 26 00
00 27 00  ---          04 59 43  56.9  83.8 -2.3       0.0    60     1065   00 26 01

00 27 00  POINT1       04 59 43  57.6  84.9 -2.3       0.0   -27     1065   No stop 
00 30 00  ---          05 02 43  58.3  84.5 -2.2       0.0   153     1089   00 27 01

00 30 00  J0716-1813   05 02 43  57.6  83.4 -2.3       0.0   -27     1089   No stop 
00 31 30  ---          05 04 14  57.9  83.2 -2.2       0.0    63     1100   00 30 01

00 31 30  POINT3       05 04 14  58.5  83.9 -2.2       0.0   -26     1100   No stop 
00 34 30  ---          05 07 14  59.1  83.4 -2.2       0.0   154     1123   00 31 31

00 34 30  J0716-1813   05 07 14  58.6  82.7 -2.2       0.0   -26     1123   No stop 
00 36 00  ---          05 08 44  59.0  82.5 -2.2       0.0    64     1135   00 34 31

00 36 00  POINT2       05 08 44  59.7  83.9 -2.1       0.0   -27     1135   No stop 
00 39 00  ---          05 11 45  60.4  83.4 -2.1       0.0   153     1158   00 36 01

00 39 30  J0716-1813   05 12 15  59.7  81.9 -2.1       0.0     3     1158   00 39 30
00 40 30  ---          05 13 15  60.0  81.7 -2.1       0.0    60     1166   00 39 31

00 40 30  POINT1       05 13 15  60.6  82.9 -2.1       0.0   -27     1166   No stop 
00 43 30  ---          05 16 16  61.3  82.4 -2.0       0.0   153     1189   00 40 31

00 43 30  J0716-1813   05 16 16  60.6  81.2 -2.0       0.0   -27     1189   No stop 
00 45 00  ---          05 17 46  61.0  81.0 -2.0       0.0    63     1201   00 43 31

00 45 00  J0712-1847   05 17 46  62.5  81.1 -1.9       0.0   -29     1201   No stop 
00 48 00  ---          05 20 46  63.2  80.5 -1.9       0.0   151     1224   00 45 01

00 48 40  J0716-1813   05 21 26  61.8  80.3 -2.0       0.0    11     1224   00 48 40
00 49 30  ---          05 22 17  62.0  80.2 -1.9       0.0    50     1230   00 48 41
Schedule for HART      (Code Hh )                                   Page   7
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

00 49 30  POINT1       05 22 17  62.6  81.4 -1.9       0.0   -27     1230   No stop 
00 52 30  ---          05 25 17  63.3  80.9 -1.9       0.0   153     1253   00 49 31

00 52 30  J0716-1813   05 25 17  62.6  79.6 -1.9       0.0   -27     1253   No stop 
00 54 00  ---          05 26 47  63.0  79.3 -1.9       0.0    63     1265   00 52 31

00 54 00  POINT2       05 26 47  63.7  80.9 -1.8       0.0   -27     1265   No stop 
00 57 00  ---          05 29 48  64.4  80.4 -1.8       0.0   153     1288   00 54 01

00 57 30  J0716-1813   05 30 18  63.7  78.6 -1.8       0.0     3     1288   00 57 30
00 58 30  ---          05 31 18  64.0  78.4 -1.8       0.0    60     1296   00 57 31

00 58 30  POINT1       05 31 18  64.6  79.7 -1.8       0.0   -27     1296   No stop 
01 01 30  ---          05 34 19  65.3  79.1 -1.7       0.0   153     1319   00 58 31

01 01 30  J0716-1813   05 34 19  64.6  77.8 -1.7       0.0   -27     1319   No stop 
01 03 00  ---          05 35 49  64.9  77.5 -1.7       0.0    63     1331   01 01 31

01 03 00  POINT3       05 35 49  65.5  78.4 -1.7       0.0   -26     1331   No stop 
01 06 00  ---          05 38 49  66.1  77.8 -1.6       0.0   154     1354   01 03 01

01 06 00  J0716-1813   05 38 49  65.6  76.8 -1.7       0.0   -26     1354   No stop 
01 07 30  ---          05 40 20  65.9  76.5 -1.6       0.0    64     1365   01 06 01

01 07 30  POINT2       05 40 20  66.7  78.2 -1.6       0.0   -27     1365   No stop 
01 10 30  ---          05 43 20  67.4  77.6 -1.6       0.0   153     1389   01 07 31

01 11 00  J0716-1813   05 43 50  66.7  75.7 -1.6       0.0     3     1389   01 11 00
01 12 00  ---          05 44 50  66.9  75.5 -1.6       0.0    60     1396   01 11 01

01 12 00  POINT1       05 44 50  67.6  76.9 -1.5       0.0   -27     1396   No stop 
01 15 00  ---          05 47 51  68.3  76.1 -1.5       0.0   153     1420   01 12 01

01 15 00  J0716-1813   05 47 51  67.6  74.7 -1.5       0.0   -27     1420   No stop 
01 16 30  ---          05 49 21  67.9  74.3 -1.5       0.0    63     1431   01 15 01

01 17 00  J0712-1847   05 49 51  69.5  74.1 -1.4       0.0     1     1431   01 17 00
01 19 30  ---          05 52 21  70.1  73.3 -1.3       0.0   150     1451   01 17 01

01 19 30  POINT1       05 52 21  69.3  75.0 -1.4       0.0   -28     1451   No stop 
01 22 30  ---          05 55 22  69.9  74.2 -1.4       0.0   152     1474   01 19 31

01 22 30  J0716-1813   05 55 22  69.2  72.7 -1.4       0.0   -27     1474   No stop 
01 24 00  ---          05 56 52  69.5  72.3 -1.4       0.0    63     1485   01 22 31
Schedule for HART      (Code Hh )                                   Page   8
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

01 24 00  POINT2       05 56 52  70.4  74.2 -1.3       0.0   -27     1485   No stop 
01 27 00  ---          05 59 53  71.0  73.3 -1.3       0.0   153     1508   01 24 01

01 27 30  J0716-1813   06 00 23  70.3  71.2 -1.3       0.0     3     1508   01 27 30
01 28 30  ---          06 01 23  70.5  70.9 -1.3       0.0    60     1516   01 27 31

01 28 30  POINT1       06 01 23  71.2  72.4 -1.3       0.0   -27     1516   No stop 
01 31 30  ---          06 04 23  71.8  71.5 -1.2       0.0   153     1539   01 28 31

01 31 30  J0716-1813   06 04 23  71.1  69.9 -1.2       0.0   -27     1539   No stop 
01 33 00  ---          06 05 54  71.4  69.4 -1.2       0.0    63     1551   01 31 31

01 33 00  POINT3       06 05 54  72.0  70.4 -1.2       0.0   -26     1551   No stop 
01 36 00  ---          06 08 54  72.6  69.4 -1.1       0.0   154     1574   01 33 01

01 36 00  J0716-1813   06 08 54  72.1  68.3 -1.2       0.0   -26     1574   No stop 
01 37 30  ---          06 10 24  72.4  67.8 -1.1       0.0    64     1586   01 36 01

01 37 30  POINT2       06 10 24  73.3  69.8 -1.1       0.0   -27     1586   No stop 
01 40 30  ---          06 13 25  73.9  68.7 -1.1       0.0   153     1609   01 37 31

01 41 00  J0716-1813   06 13 55  73.1  66.4 -1.1       0.0     3     1609   01 41 00
01 42 00  ---          06 14 55  73.3  66.0 -1.1       0.0    60     1617   01 41 01

01 42 00  POINT1       06 14 55  74.1  67.6 -1.0       0.0   -27     1617   No stop 
01 45 00  ---          06 17 56  74.7  66.3 -1.0       0.0   153     1640   01 42 01

01 45 00  J0716-1813   06 17 56  73.9  64.7 -1.0       0.0   -27     1640   No stop 
01 46 30  ---          06 19 26  74.2  64.0 -1.0       0.0    63     1651   01 45 01

01 46 30  J0712-1847   06 19 26  75.7  63.0 -0.9       0.0   -29     1651   No stop 
01 49 30  ---          06 22 26  76.3  61.4 -0.8       0.0   151     1675   01 46 31

01 52 10  0528+134     06 25 07  48.5 340.3  0.9       0.0    68     1675   01 52 10
01 56 10  ---          06 29 08  48.2 338.9  1.0       0.0   240     1706   01 52 11

01 56 10  J0716-1813   06 29 08  76.2  59.0 -0.8       0.0   -91     1706   No stop 
02 00 10  ---          06 33 08  76.9  56.6 -0.8       0.0   149     1736   01 56 11

02 00 10  POINT2       06 33 08  77.9  58.7 -0.7       0.0   -27     1736   No stop 
02 03 10  ---          06 36 09  78.4  56.7 -0.7       0.0   153     1760   02 00 11

02 03 40  J0716-1813   06 36 39  77.6  54.2 -0.7       0.0     3     1760   02 03 40
02 04 40  ---          06 37 39  77.8  53.5 -0.7       0.0    60     1767   02 03 41
Schedule for HART      (Code Hh )                                   Page   9
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

02 04 40  POINT1       06 37 39  78.6  55.0 -0.7       0.0   -27     1767   No stop 
02 07 40  ---          06 40 39  79.1  52.7 -0.6       0.0   153     1791   02 04 41

02 07 40  J0716-1813   06 40 39  78.3  51.2 -0.6       0.0   -27     1791   No stop 
02 09 10  ---          06 42 10  78.5  50.0 -0.6       0.0    63     1802   02 07 41

02 09 10  POINT3       06 42 10  79.2  50.8 -0.6       0.0   -26     1802   No stop 
02 12 10  ---          06 45 10  79.7  48.1 -0.5       0.0   154     1825   02 09 11

02 12 10  J0716-1813   06 45 10  79.1  47.4 -0.6       0.0   -26     1825   No stop 
02 13 40  ---          06 46 40  79.3  46.0 -0.5       0.0    64     1837   02 12 11

02 13 40  POINT2       06 46 40  80.3  47.8 -0.5       0.0   -27     1837   No stop 
02 16 40  ---          06 49 41  80.8  44.6 -0.5       0.0   153     1860   02 13 41

02 17 10  J0716-1813   06 50 11  79.9  42.6 -0.5       0.0     3     1860   02 17 10
02 18 10  ---          06 51 11  80.0  41.5 -0.5       0.0    60     1868   02 17 11

02 18 10  POINT1       06 51 11  80.9  42.5 -0.4       0.0   -27     1868   No stop 
02 21 10  ---          06 54 12  81.3  38.9 -0.4       0.0   153     1891   02 18 11

02 21 10  J0716-1813   06 54 12  80.4  38.2 -0.4       0.0   -27     1891   No stop 
02 22 40  ---          06 55 42  80.6  36.4 -0.4       0.0    63     1903   02 21 11

02 22 40  J0712-1847   06 55 42  81.9  30.4 -0.3       0.0   -29     1903   No stop 
02 25 40  ---          06 58 42  82.2  25.8 -0.2       0.0   151     1926   02 22 41

02 26 20  J0716-1813   06 59 22  81.1  31.7 -0.3       0.0    11     1926   02 26 20
02 27 10  ---          07 00 13  81.2  30.6 -0.3       0.0    50     1932   02 26 21

02 27 10  POINT1       07 00 13  82.1  30.6 -0.3       0.0   -27     1932   No stop 
02 30 10  ---          07 03 13  82.4  25.9 -0.2       0.0   153     1955   02 27 11

02 30 10  J0716-1813   07 03 13  81.5  26.4 -0.3       0.0   -27     1955   No stop 
02 31 40  ---          07 04 43  81.7  24.1 -0.2       0.0    63     1967   02 30 11

02 31 40  POINT2       07 04 43  82.7  23.5 -0.2       0.0   -27     1967   No stop 
02 34 40  ---          07 07 44  83.0  18.1 -0.2       0.0   153     1990   02 31 41

02 35 10  J0716-1813   07 08 14  82.0  18.6 -0.2       0.0     3     1990   02 35 10
02 36 10  ---          07 09 14  82.0  17.0 -0.2       0.0    60     1998   02 35 11

02 36 10  POINT1       07 09 14  82.9  15.4 -0.1       0.0   -27     1998   No stop 
02 39 10  ---          07 12 15  83.0   9.7 -0.1       0.0   153     2021   02 36 11
Schedule for HART      (Code Hh )                                   Page  10
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

02 39 10  J0716-1813   07 12 15  82.2  11.9 -0.1       0.0   -27     2021   No stop 
02 40 40  ---          07 13 45  82.3   9.3 -0.1       0.0    63     2033   02 39 11

02 40 40  POINT3       07 13 45  82.8   7.3 -0.1       0.0   -26     2033   No stop 
02 43 40  ---          07 16 45  82.9   1.6 -0.0       0.0   154     2056   02 40 41

02 43 40  J0716-1813   07 16 45  82.3   4.0 -0.0       0.0   -26     2056   No stop 
02 45 10  ---          07 18 16  82.4   1.4 -0.0       0.0    64     2068   02 43 41

02 45 10  POINT2       07 18 16  83.3 357.4  0.0       0.0   -27     2068   No stop 
02 48 10  ---          07 21 16  83.2 351.4  0.1       0.0   153     2091   02 45 11

02 48 40  J0716-1813   07 21 46  82.3 355.1  0.0       0.0     3     2091   02 48 40
02 49 40  ---          07 22 46  82.3 353.3  0.1       0.0    60     2098   02 48 41

02 49 40  POINT1       07 22 46  83.0 349.2  0.1       0.0   -27     2098   No stop 
02 52 40  ---          07 25 47  82.8 343.5  0.1       0.0   153     2122   02 49 41

02 52 40  J0716-1813   07 25 47  82.2 348.1  0.1       0.0   -27     2122   No stop 
02 54 10  ---          07 27 17  82.1 345.5  0.1       0.0    63     2133   02 52 41

02 54 10  J0712-1847   07 27 17  82.2 334.3  0.2       0.0   -29     2133   No stop 
02 57 10  ---          07 30 18  81.9 329.7  0.3       0.0   151     2156   02 54 11

02 57 50  J0716-1813   07 30 58  81.9 339.5  0.2       0.0    11     2156   02 57 50
02 58 40  ---          07 31 48  81.8 338.2  0.2       0.0    50     2163   02 57 51

02 58 40  POINT1       07 31 48  82.3 333.2  0.2       0.0   -27     2163   No stop 
03 01 40  ---          07 34 48  82.0 328.5  0.3       0.0   153     2186   02 58 41

03 01 40  J0716-1813   07 34 48  81.5 333.7  0.3       0.0   -27     2186   No stop 
03 03 10  ---          07 36 19  81.4 331.5  0.3       0.0    63     2198   03 01 41

03 03 10  POINT2       07 36 19  82.0 325.4  0.3       0.0   -27     2198   No stop 
03 06 10  ---          07 39 19  81.6 321.3  0.4       0.0   153     2221   03 03 11

03 06 40  J0716-1813   07 39 49  81.0 326.8  0.3       0.0     3     2221   03 06 40
03 07 40  ---          07 40 49  80.8 325.5  0.4       0.0    60     2229   03 06 41

03 07 40  POINT1       07 40 49  81.2 320.4  0.4       0.0   -27     2229   No stop 
03 10 40  ---          07 43 50  80.8 316.9  0.4       0.0   153     2252   03 07 41

03 10 40  J0716-1813   07 43 50  80.4 321.8  0.4       0.0   -27     2252   No stop 
03 12 10  ---          07 45 20  80.2 320.1  0.4       0.0    63     2263   03 10 41
Schedule for HART      (Code Hh )                                   Page  11
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

03 12 10  POINT3       07 45 20  80.4 316.5  0.5       0.0   -26     2263   No stop 
03 15 10  ---          07 48 20  80.0 313.4  0.5       0.0   154     2287   03 12 11

03 15 10  J0716-1813   07 48 20  79.8 316.9  0.5       0.0   -26     2287   No stop 
03 16 40  ---          07 49 51  79.5 315.4  0.5       0.0    64     2298   03 15 11

03 16 40  POINT2       07 49 51  79.9 309.8  0.5       0.0   -27     2298   No stop 
03 19 40  ---          07 52 51  79.4 307.2  0.6       0.0   153     2321   03 16 41

03 20 10  J0716-1813   07 53 21  79.0 312.2  0.6       0.0     3     2321   03 20 10
03 21 10  ---          07 54 21  78.8 311.3  0.6       0.0    60     2329   03 20 11

03 21 10  POINT1       07 54 21  79.0 306.8  0.6       0.0   -27     2329   No stop 
03 24 10  ---          07 57 22  78.5 304.5  0.7       0.0   153     2352   03 21 11

03 24 10  J0716-1813   07 57 22  78.3 308.8  0.6       0.0   -27     2352   No stop 
03 25 40  ---          07 58 52  78.0 307.6  0.7       0.0    63     2364   03 24 11

03 25 40  J0712-1847   07 58 52  77.3 301.4  0.8       0.0   -29     2364   No stop 
03 28 40  ---          08 01 53  76.7 299.6  0.8       0.0   151     2387   03 25 41

03 29 20  J0716-1813   08 02 33  77.4 305.0  0.7       0.0    11     2387   03 29 20
03 30 10  ---          08 03 23  77.2 304.4  0.7       0.0    50     2393   03 29 21

03 30 10  POINT1       08 03 23  77.3 300.5  0.8       0.0   -27     2393   No stop 
03 33 10  ---          08 06 23  76.7 298.7  0.8       0.0   153     2417   03 30 11

03 33 10  J0716-1813   08 06 23  76.6 302.5  0.8       0.0   -27     2417   No stop 
03 34 40  ---          08 07 54  76.4 301.6  0.8       0.0    63     2428   03 33 11

03 34 40  POINT2       08 07 54  76.5 297.1  0.8       0.0   -27     2428   No stop 
03 37 40  ---          08 10 54  75.9 295.6  0.9       0.0   153     2451   03 34 41

03 38 10  J0716-1813   08 11 24  75.7 299.6  0.9       0.0     3     2451   03 38 10
03 39 10  ---          08 12 24  75.5 299.0  0.9       0.0    60     2459   03 38 11

03 39 10  POINT1       08 12 24  75.5 295.5  0.9       0.0   -27     2459   No stop 
03 42 10  ---          08 15 25  74.9 294.1  1.0       0.0   153     2482   03 39 11

03 42 10  J0716-1813   08 15 25  74.9 297.5  0.9       0.0   -27     2482   No stop 
03 43 40  ---          08 16 55  74.6 296.8  1.0       0.0    63     2494   03 42 11

03 43 40  POINT3       08 16 55  74.6 294.4  1.0       0.0   -26     2494   No stop 
03 46 40  ---          08 19 56  73.9 293.1  1.0       0.0   154     2517   03 43 41
Schedule for HART      (Code Hh )                                   Page  12
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

03 46 40  J0716-1813   08 19 56  74.0 295.4  1.0       0.0   -26     2517   No stop 
03 48 10  ---          08 21 26  73.7 294.7  1.0       0.0    64     2529   03 46 41

03 48 10  POINT2       08 21 26  73.7 291.0  1.1       0.0   -27     2529   No stop 
03 51 10  ---          08 24 26  73.1 289.8  1.1       0.0   153     2552   03 48 11

03 51 40  J0716-1813   08 24 56  72.9 293.3  1.1       0.0     3     2552   03 51 40
03 52 40  ---          08 25 57  72.7 292.9  1.1       0.0    60     2560   03 51 41

03 52 40  POINT1       08 25 57  72.7 289.9  1.1       0.0   -27     2560   No stop 
03 55 40  ---          08 28 57  72.1 288.9  1.2       0.0   153     2583   03 52 41

03 55 40  J0716-1813   08 28 57  72.1 291.7  1.2       0.0   -27     2583   No stop 
03 57 10  ---          08 30 27  71.8 291.2  1.2       0.0    63     2594   03 55 41

03 57 10  J0712-1847   08 30 27  70.8 287.6  1.3       0.0   -29     2594   No stop 
04 00 10  ---          08 33 28  70.1 286.7  1.3       0.0   151     2618   03 57 11

04 00 50  J0716-1813   08 34 08  71.0 289.9  1.3       0.0    11     2618   04 00 50
04 01 40  ---          08 34 58  70.8 289.7  1.3       0.0    50     2624   04 00 51

04 01 40  POINT1       08 34 58  70.8 287.0  1.3       0.0   -27     2624   No stop 
04 04 40  ---          08 37 59  70.1 286.1  1.3       0.0   153     2647   04 01 41

04 04 40  J0716-1813   08 37 59  70.2 288.7  1.3       0.0   -27     2647   No stop 
04 06 10  ---          08 39 29  69.9 288.2  1.3       0.0    63     2659   04 04 41

04 06 10  POINT2       08 39 29  69.8 285.2  1.4       0.0   -27     2659   No stop 
04 09 10  ---          08 42 29  69.2 284.4  1.4       0.0   153     2682   04 06 11

04 09 40  J0716-1813   08 42 59  69.1 287.2  1.4       0.0     3     2682   04 09 40
04 10 40  ---          08 44 00  68.9 286.9  1.4       0.0    60     2690   04 09 41

04 10 40  POINT1       08 44 00  68.8 284.5  1.4       0.0   -27     2690   No stop 
04 13 40  ---          08 47 00  68.2 283.8  1.5       0.0   153     2713   04 10 41

04 13 40  J0716-1813   08 47 00  68.3 286.1  1.5       0.0   -27     2713   No stop 
04 15 10  ---          08 48 30  67.9 285.7  1.5       0.0    63     2725   04 13 41

04 15 10  POINT3       08 48 30  67.8 284.0  1.5       0.0   -26     2725   No stop 
04 18 10  ---          08 51 31  67.2 283.3  1.6       0.0   154     2748   04 15 11

04 18 10  J0716-1813   08 51 31  67.3 285.0  1.5       0.0   -26     2748   No stop 
04 19 40  ---          08 53 01  67.0 284.6  1.6       0.0    64     2759   04 18 11
Schedule for HART      (Code Hh )                                   Page  13
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

04 19 40  POINT2       08 53 01  66.9 281.9  1.6       0.0   -27     2759   No stop 
04 22 40  ---          08 56 02  66.2 281.3  1.7       0.0   153     2782   04 19 41

04 23 10  J0716-1813   08 56 32  66.2 283.8  1.6       0.0     3     2782   04 23 10
04 24 10  ---          08 57 32  66.0 283.5  1.6       0.0    60     2790   04 23 11

04 24 10  POINT1       08 57 32  65.9 281.4  1.7       0.0   -27     2790   No stop 
04 27 10  ---          09 00 32  65.2 280.8  1.7       0.0   153     2813   04 24 11

04 27 10  J0716-1813   09 00 32  65.3 282.9  1.7       0.0   -27     2813   No stop 
04 28 40  ---          09 02 03  65.0 282.5  1.7       0.0    63     2825   04 27 11

04 28 40  J0712-1847   09 02 03  63.9 280.1  1.8       0.0   -29     2825   No stop 
04 31 40  ---          09 05 03  63.2 279.5  1.9       0.0   151     2848   04 28 41

04 32 20  J0716-1813   09 05 43  64.2 281.8  1.8       0.0    11     2848   04 32 20
04 33 10  ---          09 06 33  64.0 281.6  1.8       0.0    50     2855   04 32 21

04 35 40  0528+134     09 09 04  24.1 300.2  3.6       0.0    59     2855   04 35 40
04 39 40  ---          09 13 04  23.3 299.5  3.7       0.0   240     2886   04 35 41

04 39 40  J0716-1813   09 13 04  62.6 280.3  1.9       0.0   -91     2886   No stop 
04 43 40  ---          09 17 05  61.7 279.6  2.0       0.0   149     2916   04 39 41

04 43 40  POINT1       09 17 05  61.5 277.8  2.0       0.0   -27     2916   No stop 
04 46 40  ---          09 20 06  60.9 277.3  2.0       0.0   153     2940   04 43 41

04 47 10  J0716-1813   09 20 36  60.9 279.0  2.0       0.0     3     2940   04 47 10
04 48 10  ---          09 21 36  60.7 278.8  2.0       0.0    60     2947   04 47 11

04 48 10  POINT2       09 21 36  60.5 276.7  2.1       0.0   -27     2947   No stop 
04 51 10  ---          09 24 36  59.9 276.2  2.1       0.0   153     2971   04 48 11

04 51 10  J0716-1813   09 24 36  60.0 278.3  2.1       0.0   -27     2971   No stop 
04 52 40  ---          09 26 07  59.7 278.1  2.1       0.0    63     2982   04 51 11

04 52 40  POINT1       09 26 07  59.5 276.3  2.1       0.0   -27     2982   No stop 
04 55 40  ---          09 29 07  58.8 275.9  2.2       0.0   153     3005   04 52 41

04 55 40  J0716-1813   09 29 07  59.0 277.6  2.2       0.0   -27     3005   No stop 
04 57 10  ---          09 30 37  58.7 277.3  2.2       0.0    63     3017   04 55 41

04 57 10  POINT3       09 30 37  58.5 276.1  2.2       0.0   -26     3017   No stop 
05 00 10  ---          09 33 38  57.8 275.7  2.3       0.0   154     3040   04 57 11
Schedule for HART      (Code Hh )                                   Page  14
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

05 00 40  J0716-1813   09 34 08  57.9 276.8  2.3       0.0     4     3040   05 00 40
05 01 40  ---          09 35 08  57.7 276.6  2.3       0.0    60     3048   05 00 41

05 01 40  POINT2       09 35 08  57.5 274.7  2.3       0.0   -27     3048   No stop 
05 04 40  ---          09 38 08  56.8 274.3  2.4       0.0   153     3071   05 01 41

05 04 40  J0716-1813   09 38 08  57.0 276.2  2.3       0.0   -27     3071   No stop 
05 06 10  ---          09 39 39  56.6 276.0  2.3       0.0    63     3083   05 04 41

05 06 10  POINT1       09 39 39  56.5 274.4  2.4       0.0   -27     3083   No stop 
05 09 10  ---          09 42 39  55.8 274.0  2.4       0.0   153     3106   05 06 11

05 09 10  J0716-1813   09 42 39  56.0 275.6  2.4       0.0   -27     3106   No stop 
05 10 40  ---          09 44 09  55.6 275.3  2.4       0.0    63     3117   05 09 11

05 10 40  J0712-1847   09 44 09  54.5 273.6  2.5       0.0   -29     3117   No stop 
05 13 40  ---          09 47 10  53.8 273.2  2.6       0.0   151     3141   05 10 41

05 14 20  J0716-1813   09 47 50  54.8 274.8  2.5       0.0    11     3141   05 14 20
05 15 10  ---          09 48 40  54.6 274.7  2.5       0.0    50     3147   05 14 21

05 15 10  POINT1       09 48 40  54.5 273.2  2.5       0.0   -27     3147   No stop 
05 18 10  ---          09 51 41  53.8 272.9  2.6       0.0   153     3170   05 15 11

05 18 10  J0716-1813   09 51 41  53.9 274.3  2.5       0.0   -27     3170   No stop 
05 19 40  ---          09 53 11  53.6 274.1  2.6       0.0    63     3182   05 18 11

05 19 40  POINT2       09 53 11  53.5 272.4  2.6       0.0   -27     3182   No stop 
05 22 40  ---          09 56 11  52.8 272.0  2.7       0.0   153     3205   05 19 41

05 23 10  J0716-1813   09 56 42  52.8 273.7  2.6       0.0     3     3205   05 23 10
05 24 10  ---          09 57 42  52.6 273.5  2.6       0.0    60     3213   05 23 11

05 24 10  POINT1       09 57 42  52.4 272.1  2.7       0.0   -27     3213   No stop 
05 27 10  ---          10 00 42  51.8 271.8  2.7       0.0   153     3236   05 24 11

05 27 10  J0716-1813   10 00 42  51.9 273.2  2.7       0.0   -27     3236   No stop 
05 28 40  ---          10 02 12  51.6 273.0  2.7       0.0    63     3248   05 27 11

05 28 40  POINT3       10 02 12  51.4 272.0  2.7       0.0   -26     3248   No stop 
05 31 40  ---          10 05 13  50.8 271.6  2.8       0.0   154     3271   05 28 41

05 31 40  J0716-1813   10 05 13  50.9 272.6  2.8       0.0   -26     3271   No stop 
05 33 10  ---          10 06 43  50.6 272.4  2.8       0.0    64     3282   05 31 41
Schedule for HART      (Code Hh )                                   Page  15
               EVN: EM130A
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed   1 Nov 2017   Day 305 ---

05 33 10  POINT2       10 06 43  50.4 270.8  2.8       0.0   -27     3282   No stop 
05 36 10  ---          10 09 44  49.7 270.4  2.9       0.0   153     3306   05 33 11

05 36 40  J0716-1813   10 10 14  49.8 272.0  2.9       0.0     3     3306   05 36 40
05 37 40  ---          10 11 14  49.6 271.9  2.9       0.0    60     3313   05 36 41

05 37 40  POINT1       10 11 14  49.4 270.6  2.9       0.0   -27     3313   No stop 
05 40 40  ---          10 14 14  48.7 270.2  3.0       0.0   153     3336   05 37 41

05 40 40  J0716-1813   10 14 14  48.9 271.5  2.9       0.0   -27     3336   No stop 
05 42 10  ---          10 15 45  48.5 271.4  2.9       0.0    63     3348   05 40 41

05 42 10  POINT2       10 15 45  48.4 269.8  3.0       0.0   -27     3348   No stop 
05 45 10  ---          10 18 45  47.7 269.5  3.0       0.0   153     3371   05 42 11

05 45 40  J0716-1813   10 19 15  47.8 271.0  3.0       0.0     3     3371   05 45 40
05 46 40  ---          10 20 15  47.5 270.8  3.0       0.0    60     3379   05 45 41

05 46 40  J0712-1847   10 20 15  46.4 269.4  3.1       0.0   -29     3379   No stop 
05 49 40  ---          10 23 16  45.7 269.1  3.2       0.0   151     3402   05 46 41

05 50 20  J0716-1813   10 23 56  46.7 270.4  3.1       0.0    11     3402   05 50 20
05 51 10  ---          10 24 46  46.5 270.3  3.1       0.0    50     3409   05 50 21


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 ======== Setup file: sess317.L1024
   Matching groups in /home/guest/rmc/SCHED/sched11.4/catalogs/freq_RDBE.dat:
     hh18cm          Values confirmed by E-mail Jonathan Quick 20140219 (CR)
    ****** Only  122.49 of  256.00 MHz total bandwidth is within the IFs
           in the setup file before any FREQ or DOPPLER shifts.

   Setup group:    8         Station: HART              Total bit rate:  1024
   Format: VDIF              Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type: DBBC_DDC         Speedup factor:   1.00

   Disk used to record data.

   1st LO=   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00
             1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00   1510.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF SB =         U         U         U         U         U         U         U         U
                   U         U         U         U         U         U         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         1         9         1         9         3        11         3        11
                   5        13         5        13         7        15         7        15
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        A1        C1        A1        C1        A1        C1        A1        C1
                  B2        C1        B2        C1        B2        C1        B2        C1

  The following frequency sets based on these setups were used.

   Frequency Set:  13  Setup file default.  Used with PCAL = off
   LO sum=   1610.49  1610.49  1610.49  1610.49  1642.49  1642.49  1642.49  1642.49
             1674.49  1674.49  1674.49  1674.49  1706.49  1706.49  1706.49  1706.49
   BBC fr=    100.49   100.49   100.49   100.49   132.49   132.49   132.49   132.49
              164.49   164.49   164.49   164.49   196.49   196.49   196.49   196.49
   Bandwd=     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
               16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
    Matching frequency sets:  13

   Track assignments are: 
    track1=   1,  2,  3,  4,  5,  6,  7,  8,  9, 10, 11, 12, 13, 14, 15, 16
    barrel=roll_off 

 POSITIONS OF SOURCES USED IN RECORDING SCANS

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * POINT1            07 14 13.957992   * 07 16 26.000000     07 17 13.003847       0.00
                    -18 53 44.91123    *-18 59 08.40000     -19 00 58.90632        0.00
                     From catalog imbedded in main SCHED input file.

 * POINT2            07 14 00.283144   * 07 16 12.100000     07 16 59.027042       0.00
                    -19 04 19.86234    *-19 09 42.40000     -19 11 32.52757        0.00
                     From catalog imbedded in main SCHED input file.

 * POINT3            07 14 34.864810   * 07 16 47.200000     07 17 34.303611       0.00
                    -18 40 00.27948    *-18 45 25.22000     -18 47 16.29329        0.00
                     From catalog imbedded in main SCHED input file.

 * J0716-1813        07 16 01.115592   * 07 18 14.158000     07 19 01.499376       0.00
                    -18 07 33.15134    *-18 13 04.05600     -18 14 57.34611        0.00
                     From catalog imbedded in main SCHED input file.

 * J0712-1847        07 10 03.093712   * 07 12 15.233900     07 13 02.291850       0.00
                    -18 42 46.88233    *-18 47 53.01600     -18 49 37.57229        0.00
                     From catalog imbedded in main SCHED input file.

 * 0528+134          05 28 06.759216   * 05 30 56.416747     05 31 57.114374       0.21
   J0530+1331        13 29 42.28885    * 13 31 55.14952      13 32 35.24023        0.24
   J0530+13          /home/guest/rmc/SCHED/sched11.4/catalogs/sources.gsfc
                     GSFC 2015a astro solution, unpublished 135789 observations.



SOURCE SCAN SUMMARY FOR SOURCES LISTED ABOVE

     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.
  Source       Setup file             Frequency sets                  Observing hours
                                   (duplicates not shown)              Scan  Baseline
  POINT1     sess317.L1024         1 2 3 4 5 6 7 8 9 12 13 14        2.050    63.280
  POINT2     sess317.L1024         1 2 3 4 5 6 7 8 9 12 13 14        1.450    44.904
  POINT3     sess317.L1024         1 2 3 4 5 6 7 8 9 12 13 14        0.700    22.816
  J0716-1813 sess317.L1024         1 2 3 4 5 6 7 8 9 12 13 14        2.208    65.570
  J0712-1847 sess317.L1024         1 2 3 4 5 6 7 8 9 12 13 14        0.692    21.092
  0528+134   sess317.L1024         1 2 3 4 5 6 7 8 9 12 13 14        0.361    20.270


EFFECT OF SOLAR CORONA

  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   POINT1             100.9
   POINT2             100.9
   POINT3             100.9
   J0716-1813         100.7
   J0712-1847         101.9
   0528+134           134.9

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

