  COVER INFORMATION 

 Station:    SHANGHAI  (Code Sh ) 
 Experiment: ED023, 1.3cm, MERLIN/EVN on NML Cyg
 Exp. Code:  ED023   


Schedule Version:       1.00                                              
Processed by SCHED version: Release of 02 July 2002                       

PI:       P. Diamond                                                      

Address:  MERLIN/VLBI National Facility                                   
          Jodrell Bank, Macclesfield                                      
          Cheshire, SK11 9DL                                              
          England                                                         

Phone:    (+44) (0)1477 572625                                            
EMAIL:    pdiamond@jb.man.ac.uk                                           
Fax:      (+44) (0)1477 571618                                            
Phone during observation: (+44) (0)1477 572625                            

Observing mode:                                                           

Notes:    BE SURE PULSE CAL IS OFF ON PROGRAM SOURCE.                     
                                                                          
                                                                          
                                                                          

Schedule for SHANGHAI  (Code Sh )                                   Page   2
               ED023, 1.3cm, MERLIN/EVN on NML Cyg
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  21 Nov 2002   Day 325 ---

 Next scan frequencies: 22236.61 22236.61
 Next BBC frequencies:    636.61   636.61
 Next scan bandwidths:      4.00     4.00

09 00 00  3C345        21 05 35  37.0 298.8  4.4      77.7     0   1  1      0  09 00 00
09 11 00  ---          21 16 37  35.0 299.4  4.6      76.2   660   F  1   4400

09 15 00  47UMA        21 20 37 -14.9 340.7 10.4  D   21.8   138   1  1   4400  09 15 00
09 26 00  ---          21 31 39 -15.6 342.8 10.5  D   19.4     0   F  1   8800

09 30 00  47UMA        21 35 40 -15.9 343.5 10.6  D   18.6   237   1  1   8800  09 30 00
09 52 00  ---          21 57 43 -17.1 347.7 11.0  D   13.8     0   F  1  17600

 Next scan frequencies: 22233.39 22233.39
 Next BBC frequencies:    633.39   633.39

10 00 00  3C345        22 05 45  25.9 302.6  5.4      70.0   388   1  2  17600  10 00 00
10 11 00  ---          22 16 46  23.9 303.4  5.6      68.6   660   R  1  13200

10 15 00  NMLCYG       22 20 47  68.9 301.8  1.6     108.0    88   1  2  13200  10 15 00
10 26 00  ---          22 31 49  66.9 300.3  1.8     104.7   660   R  1   8800

10 30 00  J2002        22 35 50  56.5 310.3  2.6     105.2   204   1  2   8800  10 30 00
10 32 00  ---          22 37 50  56.2 310.2  2.6     104.7   120   R  1   8000

10 32 00  NMLCYG       22 37 50  65.8 299.6  1.9     103.1   -34   1  2   8000  10 32 00
10 52 00  ---          22 57 53  62.0 298.0  2.2      98.4  1166   R  1      0

10 55 00  J2002        23 00 54  52.4 308.8  3.0      99.4   146   1  1      0  10 55 00
10 57 00  ---          23 02 54  52.1 308.7  3.0      98.9   120   F  2    800

10 57 00  NMLCYG       23 02 54  61.1 297.7  2.3      97.4   -32   1  1    800  10 57 00
11 17 00  ---          23 22 57  57.2 297.0  2.6      93.5  1168   F  2   8800

11 20 00  J2002        23 25 58  48.2 308.0  3.4      94.1   148   1  1   8800  11 20 00
11 22 00  ---          23 27 58  47.9 308.0  3.4      93.7   120   F  2   9600

11 22 00  NMLCYG       23 27 58  56.3 296.9  2.7      92.6   -30   1  1   9600  11 22 00
11 42 00  ---          23 48 01  52.4 296.8  3.0      89.3  1170   F  2  17600

11 45 00  J2002        23 51 02  44.0 307.8  3.8      89.4   150   1  2  17600  11 45 00
11 47 00  ---          23 53 02  43.6 307.8  3.8      89.0   120   R  2  16800
Schedule for SHANGHAI  (Code Sh )                                   Page   3
               ED023, 1.3cm, MERLIN/EVN on NML Cyg
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  21 Nov 2002   Day 325 ---

11 47 00  NMLCYG       23 53 02  51.5 296.8  3.1      88.5   -28   1  2  16800  11 47 00
12 07 00  ---          00 13 06  47.7 297.1  3.4      85.5  1172   R  2   8800

12 10 00  3C345        00 16 06   4.1 315.0  7.6  D   52.1    36   1  2   8800  12 10 00
12 21 00  ---          00 27 08   2.4 316.3  7.7  D   50.4     0   R  2   4400

12 25 00  NMLCYG       00 31 08  44.2 297.6  3.7      83.0   107   1  2   4400  12 25 00
12 36 00  ---          00 42 10  42.1 298.0  3.9      81.5   660   R  2      0

12 40 00  J2002        00 46 11  34.7 308.9  4.7      79.9   213   1  1      0  12 40 00
12 42 00  ---          00 48 11  34.4 309.0  4.8      79.6   120   F  3    800

12 42 00  NMLCYG       00 48 11  41.0 298.2  4.0      80.7   -24   1  1    800  12 42 00
13 02 00  ---          01 08 15  37.2 299.1  4.4      78.0  1176   F  3   8800

13 05 00  J2002        01 11 15  30.5 310.0  5.2      75.9   156   1  1   8800  13 05 00
13 07 00  ---          01 13 15  30.2 310.1  5.2      75.5   120   F  3   9600

13 07 00  NMLCYG       01 13 15  36.3 299.4  4.4      77.3   -23   1  1   9600  13 07 00
13 27 00  ---          01 33 19  32.6 300.5  4.8      74.7  1177   F  3  17600

13 30 00  J2002        01 36 19  26.5 311.3  5.6      71.9   156   1  2  17600  13 30 00
13 32 00  ---          01 38 19  26.2 311.5  5.6      71.6   120   R  3  16800

13 32 00  NMLCYG       01 38 19  31.7 300.8  4.9      74.1   -23   1  2  16800  13 32 00
13 52 00  ---          01 58 23  28.0 302.1  5.2      71.5  1177   R  3   8800

13 55 00  J2002        02 01 23  22.5 312.9  6.0      67.9   156   1  2   8800  13 55 00
13 57 00  ---          02 03 24  22.2 313.1  6.0      67.6   120   R  3   8000

13 57 00  NMLCYG       02 03 24  27.1 302.5  5.3      70.9   -23   1  2   8000  13 57 00
14 17 00  ---          02 23 27  23.5 304.0  5.6      68.3  1177   R  3      0

14 20 00  3C345        02 26 27 -12.3 333.8  9.7  D   29.5   116   1  1      0  14 20 00
14 31 00  ---          02 37 29 -13.3 335.7  9.9  D   27.3     0   F  4   4400

14 45 00  NMLCYG       02 51 31  18.6 306.3  6.1      64.6   779   1  1   4400  14 45 00
14 56 00  ---          03 02 33  16.7 307.2  6.3      63.1   660   F  4   8800

15 00 00  J2002        03 06 34  12.7 318.2  7.1      57.5   216   1  1   8800  15 00 00
15 02 00  ---          03 08 34  12.4 318.4  7.1      57.2   120   F  4   9600

15 02 00  NMLCYG       03 08 34  15.7 307.8  6.4      62.3   -23   1  1   9600  15 02 00
15 22 00  ---          03 28 38  12.3 309.7  6.7      59.5  1177   F  4  17600
Schedule for SHANGHAI  (Code Sh )                                   Page   4
               ED023, 1.3cm, MERLIN/EVN on NML Cyg
  UP:  D => Below limits;  H => Below horizon mask.  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Tapes: Drive, Index, Start footage / Direction, Head Group, End footage.
  TPStart:  Tape motion start time.  Frequencies are LO sum (band edge).
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Tapes      TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell  (see above)
----------------------------------------------------------------------------------------

 --- Thu  21 Nov 2002   Day 325 ---

15 25 00  J2002        03 31 38   9.2 320.7  7.5      53.4   156   1  2  17600  15 25 00
15 27 00  ---          03 33 38   8.9 320.9  7.5      53.0   120   R  4  16800

15 27 00  NMLCYG       03 33 38  11.5 310.2  6.8      58.8   -23   1  2  16800  15 27 00
15 47 00  ---          03 53 42   8.3 312.3  7.1      55.9  1177   R  4   8800

15 50 00  J2002        03 56 42   5.9 323.3  7.9      49.1   156   1  2   8800  15 50 00
15 52 00  ---          03 58 42   5.7 323.6  7.9      48.7   120   R  4   8000

15 52 00  NMLCYG       03 58 42   7.5 312.8  7.2      55.2   -23   1  2   8000  15 52 00
16 12 00  ---          04 18 46   4.4 315.1  7.5  D   52.2     0   R  4      0


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: ed023.set
   Matches group sh1cm in /usr/local/vlbi_sched/catalogs/freq.dat
    From Porcas, from Huang Xinyong 231198

   Setup group:    8         Station: SHANGHAI          Total bit rate:   32
   Format: MKIV1:2           Bits per sample: 2         Sample rate:  8.000
   Number of channels:  2    Passes/head pos:   4       Speedup factor:   2.00

   Tape speeds: Low density - 135.000 ips,  High density -  80.00 ips
   Time per pass for  17600 ft, High density tapes is: 00:44:00

   1st LO=  21600.00  21600.00
   Net SB=         U         U
   Pol.  =      RCP       LCP 
   BBC   =         1         2
   BBC SB=         U         U
   IF    =        C         A 

  The following frequency sets based on this setup were used.

  Frequency Set:   8  Based on FREQ, BW, and/or DOPPLER in schedule.  Used pcal sets:   1
   LO sum=   22236.61  22236.61
   BBC fr=     636.61    636.61
   Bandwd=      4.000     4.000

  Frequency Set:  16  Based on FREQ, BW, and/or DOPPLER in schedule.  Used pcal sets:   1
   LO sum=   22233.39  22233.39
   BBC fr=     633.39    633.39
   Bandwd=      4.000     4.000

  The following pulse cal sets were used with this setup:

   Pulse cal detection set:   1  PCAL = OFF 
    PCALXB1=   S1    S2    OFF   OFF   OFF   OFF   OFF   OFF
    PCALXB2=   M1    M2    OFF   OFF   OFF   OFF   OFF   OFF
    PCALFR1=     0     0     0     0     0     0     0     0
    PCALFR2=     0     0     0     0     0     0     0     0

   Track assignments are: 
    track1=   2, 10
    track2=  18, 26
    track3=   3, 11
    track4=  19, 27
    barrel=roll_off 
 SOURCE LIST -- ED023, 1.3cm, MERLIN/EVN on NML Cyg
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).

   Source                         Source position (RA/Dec) 
                        (B1950)           (J2000)           (Date) 

 * NMLCYG          * 20 44 33.870000     20 46 25.556902     20 46 30.516281 
                   * 39 55 56.90000      40 06 59.19147      40 07 46.30657 
                     From catalog imbedded in main SCHED input file.

 * UPSAND            01 33 50.346506   * 01 36 47.800000     01 36 58.119544 
                     41 09 03.19564    * 41 24 19.70000      41 25 18.68875 
                     From catalog imbedded in main SCHED input file.

 * 47UMA             10 56 38.948749   * 10 59 27.970000     10 59 36.295014 
                     40 41 54.43095    * 40 25 48.90000      40 24 50.85473 
                     From catalog imbedded in main SCHED input file.

 * 4C39.25           09 23 55.319079   * 09 27 03.013800     09 27 12.957006 
                     39 15 23.56559    * 39 02 20.85100      39 01 33.30849 
                     From catalog imbedded in main SCHED input file.

 * 3C345             16 41 17.606162   * 16 42 58.809900     16 43 02.267768 
                     39 54 10.81394    * 39 48 36.99300      39 48 22.66877 
                     From catalog imbedded in main SCHED input file.

 * J2002             20 00 39.216114   * 20 02 10.418300     20 02 13.907380 
                     47 17 02.42379    * 47 25 28.77300      47 26 07.75281 
                     From catalog imbedded in main SCHED input file.



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   NMLCYG              91.7
   UPSAND             145.0
   47UMA               90.0
   4C39.25            106.3
   3C345               61.2
   J2002               88.2

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

