  COVER INFORMATION 

 Station:    SHANGHAI  (Code Sh ) 
 Experiment: Multi-phase-centre DEVOS - in-beam ph-refpart
 Exp. Code:  eg057in 


Schedule Version:       1.00
Processed by SCHED version:   9.40  Release Jan. 13, 2011.

PI:       Leonid Gurvits

Address:  JIVE
          Postbus 2
          7990 AA Dwingeloo
           The Netherlands

Phone:    (+31)-521-596514
EMAIL:    lgurvits@jive.nl
Fax:      (+31)-521-596539
Phone during observation: (+31)-521-596523

Observing mode: 1024-16-2

Notes:    Wb - phased array
          See file eg057-noding.key for the nodding ph-ref sub-array of this experimnt
 
 

Schedule for SHANGHAI  (Code Sh )                                   Page   2
               Multi-phase-centre DEVOS - in-beam ph-refpart
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   1 Nov 2011   Day 305 ---

 Next scan frequencies:  1610.49  1610.49  1610.49  1610.49  1642.49  1642.49
                         1642.49  1642.49  1674.49  1674.49  1674.49  1674.49
                         1706.49  1706.49  1706.49  1706.49
 Next BBC frequencies:    689.51   689.51   689.51   689.51   657.51   657.51
                          657.51   657.51   625.51   625.51   625.51   625.51
                          593.51   593.51   593.51   593.51
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00

14 30 00  3C454.3      01 16 55  54.4 253.6  2.4      58.8     0        0   14 29 55
14 32 00  ---          01 18 56  54.0 254.0  2.4      59.0   120       16   14 29 56

14 32 00  P-CENTRE     01 18 56  40.2 241.6  2.8      48.9   -27       16   No stop 
14 35 00  ---          01 21 56  39.6 242.3  2.9      49.3   153       39   14 32 01

14 35 30  P-CENTRE     01 22 26  39.5 242.4  2.9      49.4    28       39   14 35 25
14 37 30  ---          01 24 27  39.1 242.8  2.9      49.6   120       55   14 35 26

14 37 30  P-CENTRE     01 24 27  39.1 242.8  2.9      49.6    -2       55   No stop 
14 40 30  ---          01 27 27  38.6 243.4  3.0      50.0   178       79   14 37 31

14 40 30  P-CENTRE     01 27 27  38.6 243.4  3.0      50.0    -2       79   No stop 
14 42 30  ---          01 29 27  38.2 243.8  3.0      50.2   118       94   14 40 31

14 42 30  P-CENTRE     01 29 27  38.2 243.8  3.0      50.2    -2       94   No stop 
14 45 30  ---          01 32 28  37.6 244.4  3.0      50.6   178      117   14 42 31

14 45 30  J2226+0052   01 32 28  36.9 244.6  3.1      50.7    -5      117   No stop 
14 47 30  =2224+006    01 34 28  36.5 245.0  3.1      50.9   115      133   14 45 31

14 48 00  P-CENTRE     01 34 58  37.1 244.9  3.1      50.9    25      133   14 47 55
14 51 00  ---          01 37 59  36.5 245.5  3.1      51.2   180      157   14 47 56

14 51 00  P-CENTRE     01 37 59  36.5 245.5  3.1      51.2    -2      157   No stop 
14 53 00  ---          01 39 59  36.1 245.9  3.2      51.4   118      172   14 51 01

14 53 00  P-CENTRE     01 39 59  36.1 245.9  3.2      51.4    -2      172   No stop 
14 56 00  ---          01 43 00  35.5 246.5  3.2      51.8   178      195   14 53 01

14 56 30  P-CENTRE     01 43 30  35.4 246.6  3.2      51.8    28      195   14 56 25
14 58 30  ---          01 45 30  35.1 247.0  3.3      52.0   120      212   14 56 26
Schedule for SHANGHAI  (Code Sh )                                   Page   3
               Multi-phase-centre DEVOS - in-beam ph-refpart
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   1 Nov 2011   Day 305 ---

14 58 30  P-CENTRE     01 45 30  35.1 247.0  3.3      52.0    -2      212   No stop 
15 01 30  ---          01 48 31  34.5 247.5  3.3      52.3   178      235   14 58 31

15 01 30  P-CENTRE     01 48 31  34.5 247.5  3.3      52.3    -2      235   No stop 
15 03 30  ---          01 50 31  34.1 247.9  3.3      52.5   118      250   15 01 31

15 03 30  P-CENTRE     01 50 31  34.1 247.9  3.3      52.5    -2      250   No stop 
15 06 30  ---          01 53 31  33.5 248.4  3.4      52.8   178      274   15 03 31

15 06 30  J2226+0052   01 53 31  32.8 248.6  3.4      52.9    -5      274   No stop 
15 08 30  =2224+006    01 55 32  32.4 248.9  3.5      53.0   115      289   15 06 31

15 09 00  P-CENTRE     01 56 02  33.0 248.9  3.4      53.0    25      289   15 08 55
15 12 00  ---          01 59 02  32.4 249.4  3.5      53.3   180      313   15 08 56

15 12 00  P-CENTRE     01 59 02  32.4 249.4  3.5      53.3    -2      313   No stop 
15 14 00  ---          02 01 03  32.0 249.8  3.5      53.5   118      328   15 12 01

15 14 00  P-CENTRE     02 01 03  32.0 249.8  3.5      53.5    -2      328   No stop 
15 17 00  ---          02 04 03  31.4 250.3  3.6      53.7   178      352   15 14 01

15 17 30  P-CENTRE     02 04 33  31.3 250.4  3.6      53.8    28      352   15 17 25
15 19 30  ---          02 06 34  30.8 250.7  3.6      54.0   120      368   15 17 26

15 19 30  P-CENTRE     02 06 34  30.8 250.7  3.6      54.0    -2      368   No stop 
15 22 30  ---          02 09 34  30.2 251.2  3.7      54.2   178      391   15 19 31

15 22 30  P-CENTRE     02 09 34  30.2 251.2  3.7      54.2    -2      391   No stop 
15 24 30  ---          02 11 34  29.8 251.6  3.7      54.4   118      406   15 22 31

15 24 30  P-CENTRE     02 11 34  29.8 251.6  3.7      54.4    -2      406   No stop 
15 27 30  ---          02 14 35  29.2 252.1  3.7      54.6   178      430   15 24 31

15 27 30  J2226+0052   02 14 35  28.5 252.2  3.8      54.6    -5      430   No stop 
15 29 30  =2224+006    02 16 35  28.1 252.5  3.8      54.8   115      445   15 27 31

15 30 00  P-CENTRE     02 17 05  28.7 252.5  3.8      54.8    25      445   15 29 55
15 33 00  ---          02 20 06  28.1 253.0  3.8      55.0   180      469   15 29 56

15 33 00  P-CENTRE     02 20 06  28.1 253.0  3.8      55.0    -2      469   No stop 
15 35 00  ---          02 22 06  27.7 253.3  3.9      55.1   118      484   15 33 01

15 35 00  P-CENTRE     02 22 06  27.7 253.3  3.9      55.1    -2      484   No stop 
15 38 00  ---          02 25 07  27.1 253.8  3.9      55.3   178      508   15 35 01
Schedule for SHANGHAI  (Code Sh )                                   Page   4
               Multi-phase-centre DEVOS - in-beam ph-refpart
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   1 Nov 2011   Day 305 ---

15 38 30  P-CENTRE     02 25 37  27.0 253.9  3.9      55.4    28      508   15 38 25
15 40 30  ---          02 27 37  26.6 254.2  4.0      55.5   120      524   15 38 26

15 40 30  P-CENTRE     02 27 37  26.6 254.2  4.0      55.5    -2      524   No stop 
15 43 30  ---          02 30 37  25.9 254.7  4.0      55.7   178      547   15 40 31

15 43 30  P-CENTRE     02 30 37  25.9 254.7  4.0      55.7    -2      547   No stop 
15 45 30  ---          02 32 38  25.5 255.0  4.0      55.8   118      563   15 43 31

15 45 30  P-CENTRE     02 32 38  25.5 255.0  4.0      55.8    -2      563   No stop 
15 48 30  ---          02 35 38  24.9 255.4  4.1      56.0   178      586   15 45 31

15 48 30  J2226+0052   02 35 38  24.2 255.5  4.1      56.0    -5      586   No stop 
15 50 30  =2224+006    02 37 39  23.8 255.8  4.2      56.1   115      601   15 48 31

15 51 00  P-CENTRE     02 38 09  24.4 255.8  4.1      56.1    25      601   15 50 55
15 54 00  ---          02 41 09  23.7 256.3  4.2      56.3   180      625   15 50 56

15 54 00  P-CENTRE     02 41 09  23.7 256.3  4.2      56.3    -2      625   No stop 
15 56 00  ---          02 43 10  23.3 256.6  4.2      56.4   118      641   15 54 01

15 56 00  P-CENTRE     02 43 10  23.3 256.6  4.2      56.4    -2      641   No stop 
15 59 00  ---          02 46 10  22.7 257.0  4.3      56.6   178      664   15 56 01

15 59 30  P-CENTRE     02 46 40  22.6 257.1  4.3      56.6    28      664   15 59 25
16 01 30  ---          02 48 40  22.2 257.4  4.3      56.7   120      680   15 59 26

16 01 30  P-CENTRE     02 48 40  22.2 257.4  4.3      56.7    -2      680   No stop 
16 04 30  ---          02 51 41  21.6 257.9  4.4      56.9   178      703   16 01 31

16 04 30  P-CENTRE     02 51 41  21.6 257.9  4.4      56.9    -2      703   No stop 
16 06 30  ---          02 53 41  21.1 258.2  4.4      57.0   118      719   16 04 31

16 06 30  P-CENTRE     02 53 41  21.1 258.2  4.4      57.0    -2      719   No stop 
16 09 30  ---          02 56 42  20.5 258.6  4.4      57.1   178      742   16 06 31

16 09 30  J2226+0052   02 56 42  19.8 258.7  4.5      57.1    -5      742   No stop 
16 11 30  =2224+006    02 58 42  19.4 258.9  4.5      57.2   115      757   16 09 31

16 12 00  P-CENTRE     02 59 12  20.0 259.0  4.5      57.2    25      757   16 11 55
16 15 00  ---          03 02 13  19.3 259.4  4.5      57.3   180      781   16 11 56

16 15 00  P-CENTRE     03 02 13  19.3 259.4  4.5      57.3    -2      781   No stop 
16 17 00  ---          03 04 13  18.9 259.7  4.6      57.4   118      797   16 15 01
Schedule for SHANGHAI  (Code Sh )                                   Page   5
               Multi-phase-centre DEVOS - in-beam ph-refpart
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   1 Nov 2011   Day 305 ---

16 17 00  P-CENTRE     03 04 13  18.9 259.7  4.6      57.4    -2      797   No stop 
16 20 00  ---          03 07 13  18.3 260.1  4.6      57.5   178      820   16 17 01

16 20 30  P-CENTRE     03 07 44  18.2 260.2  4.6      57.6    28      820   16 20 25
16 22 30  ---          03 09 44  17.8 260.5  4.7      57.6   120      836   16 20 26

16 22 30  P-CENTRE     03 09 44  17.8 260.5  4.7      57.6    -2      836   No stop 
16 25 30  ---          03 12 44  17.1 260.9  4.7      57.7   178      859   16 22 31

16 25 30  P-CENTRE     03 12 44  17.1 260.9  4.7      57.7    -2      859   No stop 
16 27 30  ---          03 14 45  16.7 261.2  4.7      57.8   118      875   16 25 31

16 27 30  P-CENTRE     03 14 45  16.7 261.2  4.7      57.8    -2      875   No stop 
16 30 30  ---          03 17 45  16.1 261.6  4.8      57.9   178      898   16 27 31

16 30 30  J2226+0052   03 17 45  15.3 261.6  4.8      57.9    -5      898   No stop 
16 32 30  =2224+006    03 19 46  14.9 261.9  4.9      58.0   115      913   16 30 31

16 33 00  P-CENTRE     03 20 16  15.5 261.9  4.8      58.0    25      913   16 32 55
16 36 00  ---          03 23 16  14.9 262.3  4.9      58.1   180      937   16 32 56

16 36 00  P-CENTRE     03 23 16  14.9 262.3  4.9      58.1    -2      937   No stop 
16 38 00  ---          03 25 16  14.5 262.6  4.9      58.1   118      953   16 36 01

16 38 00  P-CENTRE     03 25 16  14.5 262.6  4.9      58.1    -2      953   No stop 
16 41 00  ---          03 28 17  13.8 263.0  5.0      58.2   178      976   16 38 01

16 41 30  P-CENTRE     03 28 47  13.7 263.1  5.0      58.2    28      976   16 41 25
16 43 30  ---          03 30 47  13.3 263.4  5.0      58.3   120      992   16 41 26

16 43 30  P-CENTRE     03 30 47  13.3 263.4  5.0      58.3    -2      992   No stop 
16 46 30  ---          03 33 48  12.7 263.8  5.1      58.4   178     1015   16 43 31

16 46 30  P-CENTRE     03 33 48  12.7 263.8  5.1      58.4    -2     1015   No stop 
16 48 30  ---          03 35 48  12.2 264.0  5.1      58.4   118     1031   16 46 31

16 48 30  P-CENTRE     03 35 48  12.2 264.0  5.1      58.4    -2     1031   No stop 
16 51 30  ---          03 38 49  11.6 264.4  5.1      58.5   178     1054   16 48 31

16 51 30  J2226+0052   03 38 49  10.9 264.5  5.2      58.5    -5     1054   No stop 
16 53 30  =2224+006    03 40 49  10.4 264.7  5.2      58.5   115     1070   16 51 31

16 54 00  P-CENTRE     03 41 19  11.1 264.8  5.2      58.5    25     1070   16 53 55
16 57 00  ---          03 44 20  10.4 265.2  5.2      58.6   180     1093   16 53 56
Schedule for SHANGHAI  (Code Sh )                                   Page   6
               Multi-phase-centre DEVOS - in-beam ph-refpart
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Tue   1 Nov 2011   Day 305 ---

16 57 00  P-CENTRE     03 44 20  10.4 265.2  5.2      58.6    -2     1093   No stop 
16 59 00  ---          03 46 20  10.0 265.4  5.3      58.6   118     1109   16 57 01

16 59 00  P-CENTRE     03 46 20  10.0 265.4  5.3      58.6    -2     1109   No stop 
17 02 00  ---          03 49 20   9.3 265.8  5.3      58.7   178     1132   16 59 01

17 02 30  P-CENTRE     03 49 50   9.2 265.9  5.3      58.7    28     1132   17 02 25
17 04 30  ---          03 51 51   8.8 266.2  5.4      58.7   120     1148   17 02 26

17 04 30  P-CENTRE     03 51 51   8.8 266.2  5.4      58.7    -2     1148   No stop 
17 07 30  ---          03 54 51   8.2 266.5  5.4      58.8   178     1172   17 04 31

17 07 30  P-CENTRE     03 54 51   8.2 266.5  5.4      58.8    -2     1172   No stop 
17 09 30  ---          03 56 52   7.7 266.8  5.4      58.8   118     1187   17 07 31

17 09 30  P-CENTRE     03 56 52   7.7 266.8  5.4      58.8    -2     1187   No stop 
17 12 30  ---          03 59 52   7.1 267.2  5.5      58.8   178     1210   17 09 31

17 12 30  J2226+0052   03 59 52   6.4 267.2  5.5      58.8    -5     1210   No stop 
17 14 30  =2224+006    04 01 52   5.9 267.5  5.6      58.8   115     1226   17 12 31

17 15 00  P-CENTRE     04 02 23   6.6 267.5  5.5      58.8    25     1226   17 14 55
17 18 00  ---          04 05 23   5.9 267.9  5.6      58.9   180     1250   17 14 56

17 18 00  P-CENTRE     04 05 23   5.9 267.9  5.6      58.9    -2     1250   No stop 
17 20 00  ---          04 07 23   5.5 268.2  5.6      58.9   118     1265   17 18 01

17 21 15  3C454.3      04 08 39  17.9 278.5  5.2      61.9    50     1265   17 21 10
17 24 00  ---          04 11 24  17.4 278.8  5.3      61.8   165     1287   17 21 11


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: sess311.EG057
   Matching groups in /aps3/sched9.4/catalogs/freq.dat:
     sh18cm          Huang Xinyong 27Sept05
    ****** Only  244.98 of  256.00 MHz total bandwidth is within the IFs
           in the setup file before any FREQ or DOPPLER shifts.

   Setup group:    5         Station: SHANGHAI          Total bit rate: 1024
   Format: MKIV1:2           Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type:                  Speedup factor:   0.50

   Disk used to record data.

   1st LO=   2300.00   2300.00   2300.00   2300.00   2300.00   2300.00   2300.00   2300.00
             2300.00   2300.00   2300.00   2300.00   2300.00   2300.00   2300.00   2300.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         1         2         1         2         3         4         3         4
                   5         6         5         6         7         8         7         8
   BBC SB=         U         U         L         L         U         U         L         L
                   U         U         L         L         U         U         L         L
   IF    =        C         A         C         A         C         A         C         A 
                  C         A         C         A         C         A         C         A 

  The following frequency sets based on this setup were used.

   Frequency Set:   8  Setup file default.  Used pcal sets:   1
   LO sum=    1610.49   1610.49   1610.49   1610.49   1642.49   1642.49   1642.49   1642.49
              1674.49   1674.49   1674.49   1674.49   1706.49   1706.49   1706.49   1706.49
   BBC fr=     689.51    689.51    689.51    689.51    657.51    657.51    657.51    657.51
               625.51    625.51    625.51    625.51    593.51    593.51    593.51    593.51
   Bandwd=     16.000    16.000    16.000    16.000    16.000    16.000    16.000    16.000
               16.000    16.000    16.000    16.000    16.000    16.000    16.000    16.000

  The following pulse cal sets were used with this setup:

   Pulse cal detection set:   1  PCAL = OFF 
    PCALXB1=   S1    S2    S3    S4    S5    S6    S7    S8 
    PCALXB2=   M1    M2    M3    M4    M5    M6    M7    M8 
    PCALFR1=     0     0     0     0     0     0     0     0
    PCALFR2=     0     0     0     0     0     0     0     0

   Track assignments are: 
    track1=   2, 10, 18, 26,  3, 11, 19, 27, 66, 74, 82, 90, 67, 75, 83, 91
    barrel=roll_off 
 SOURCES USED IN RECORDING SCANS --                         Multi-phase-centre DEVOS - in-beam ph-refpart
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * P-CENTRE          22 26 44.385766   * 22 29 17.670000     22 29 55.443841       0.00
                     00 57 21.98026    * 01 12 44.50000      01 16 36.70005        0.00
                     From catalog imbedded in main SCHED input file.
                     In-beam and J2228+0110 separation 17.6 arcmin; P-Centre in the iddle
                        7.067 scan and    159.191 baseline hours in setup: sess311.EG057

   J0137+3309        01 34 49.826433   * 01 37 41.299499     01 38 24.622630       0.59
   0134+329          32 54 20.25963    * 33 09 35.13381      33 13 24.27572        0.57
 * 3C48              From catalog imbedded in main SCHED input file.
   J0137+33          GSFC 2010a astro solution        99 Observations
                        0.167 scan and      1.989 baseline hours in setup: sess311.EG057

 * 3C454.3           22 51 29.519738   * 22 53 57.747937     22 54 34.512384       0.00
                     15 52 54.34811    * 16 08 53.56094      16 12 58.33142        0.00
                     From catalog imbedded in main SCHED input file.
                     VLBA Calibrators on-line cataloge
                        0.079 scan and      2.850 baseline hours in setup: sess311.EG057

 * J2226+0052        22 24 13.105514   * 22 26 46.537015     22 27 24.331709       0.14
   2224+006          00 36 53.17061    * 00 52 11.33148      00 56 02.40680        0.34
                     From catalog imbedded in main SCHED input file.
                     From SCHED Catalogue http://www.aoc.nrao.edu/~cwalker/sched/catalogs/sources.vlb
                        0.767 scan and     15.675 baseline hours in setup: sess311.EG057



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   P-CENTRE           120.1
   3C48               158.3
   3C454.3            129.0
   J2226+0052         119.4

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

