  COVER INFORMATION 

 Station:    HART      (Code Hh ) 
 Experiment: e-EVN runs ET017A (Tudose), RP018B (Paragi)
 Exp. Code:  et017a  


Schedule Version:       1.00
Processed by SCHED version:   9.40  Release Jan. 13, 2011.

PI:       Z. Paragi

Address:  JIVE
          Postbus 2
          7990 AA Dwingeloo
          The Netherlands

Phone:    +31 (0)521 596 536
EMAIL:    zparagi@jive.nl
Fax:
Phone during observation: +31 (0)521 596 500

Observing mode:

Notes:    ###########################################################
          ########## Please, make sure PHASE CAL is OFF. ############
          ###########################################################
 

Schedule for HART      (Code Hh )                                   Page   2
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

 Next scan frequencies:  4942.49  4942.49  4942.49  4942.49  4974.49  4974.49
                         4974.49  4974.49  5006.49  5006.49  5006.49  5006.49
                         5038.49  5038.49  5038.49  5038.49
 Next BBC frequencies:    342.49   342.49   342.49   342.49   374.49   374.49
                          374.49   374.49   406.49   406.49   406.49   406.49
                          438.49   438.49   438.49   438.49
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00

09 00 00  3C345        14 58 42  19.9  21.1 -1.7       0.0     0        0   08 59 55
09 15 00  ---          15 13 44  21.1  18.3 -1.5       0.0   900      117   08 59 59

09 15 40  3C345        15 14 25  21.1  18.2 -1.5       0.0    19      117   09 15 35
09 30 00  ---          15 28 47  22.1  15.4 -1.2       0.0   860      228   09 15 39

09 30 40  3C345        15 29 27  22.1  15.2 -1.2       0.0    19      228   09 30 35
09 45 00  ---          15 43 49  22.9  12.4 -1.0       0.0   860      340   09 30 39

09 45 40  3C345        15 44 29  22.9  12.2 -1.0       0.0    19      340   09 45 35
10 00 00  ---          15 58 52  23.5   9.3 -0.7       0.0   860      452   09 45 39

10 00 40  3C345        15 59 32  23.5   9.2 -0.7       0.0    19      452   10 00 35
10 15 00  ---          16 13 54  24.0   6.2 -0.5       0.0   860      563   10 00 39

10 15 40  3C345        16 14 34  24.0   6.0 -0.5       0.0    19      563   10 15 35
10 30 00  ---          16 28 57  24.2   3.0 -0.2       0.0   860      675   10 15 39

10 30 40  3C345        16 29 37  24.2   2.9 -0.2       0.0    19      675   10 30 35
10 45 00  ---          16 43 59  24.3 359.9  0.0       0.0   860      786   10 30 39

10 45 40  J1907+0127   16 44 39  45.9  57.2 -2.4       0.0   -64      786   10 45 35
11 00 00  =1904+013    16 59 02  48.6  53.6 -2.1       0.0   796      898   10 45 39

11 02 00  J1907+0127   17 01 02  48.9  53.1 -2.1       0.0    99      898   11 01 55
11 05 00  =1904+013    17 04 03  49.5  52.3 -2.1       0.0   180      922   11 01 59

11 05 00  AQLX-1       17 04 03  49.3  54.3 -2.1       0.0   -27      922   No stop 
11 09 30  ---          17 08 33  50.2  53.1 -2.1       0.0   243      957   11 05 04

11 10 10  J1907+0127   17 09 13  50.4  50.9 -2.0       0.0    12      957   11 10 05
11 11 40  =1904+013    17 10 44  50.7  50.4 -2.0       0.0    90      969   11 10 09
Schedule for HART      (Code Hh )                                   Page   3
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

11 11 40  AQLX-1       17 10 44  50.5  52.5 -2.0       0.0   -27      969   No stop 
11 16 10  ---          17 15 14  51.3  51.3 -1.9       0.0   243     1004   11 11 44

11 16 50  J1907+0127   17 15 54  51.5  48.9 -1.9       0.0    12     1004   11 16 45
11 17 50  =1904+013    17 16 55  51.7  48.6 -1.8       0.0    60     1012   11 16 49

11 17 50  AQLX-1       17 16 55  51.6  50.8 -1.9       0.0   -27     1012   No stop 
11 22 20  ---          17 21 25  52.4  49.5 -1.8       0.0   243     1047   11 17 54

11 23 00  J1907+0127   17 22 05  52.6  47.1 -1.8       0.0    12     1047   11 22 55
11 24 30  =1904+013    17 23 36  52.8  46.6 -1.7       0.0    90     1059   11 22 59

11 24 30  AQLX-1       17 23 36  52.8  48.8 -1.8       0.0   -27     1059   No stop 
11 29 00  ---          17 28 06  53.5  47.4 -1.7       0.0   243     1094   11 24 34

11 29 40  J1907+0127   17 28 47  53.7  44.9 -1.7       0.0    12     1094   11 29 35
11 30 40  =1904+013    17 29 47  53.8  44.6 -1.6       0.0    60     1103   11 29 39

11 30 40  AQLX-1       17 29 47  53.8  46.9 -1.7       0.0   -27     1103   No stop 
11 35 10  ---          17 34 17  54.6  45.4 -1.6       0.0   243     1137   11 30 44

11 35 50  J1907+0127   17 34 58  54.6  42.9 -1.5       0.0    12     1137   11 35 45
11 37 20  =1904+013    17 36 28  54.8  42.4 -1.5       0.0    90     1150   11 35 49

11 37 20  AQLX-1       17 36 28  54.9  44.7 -1.6       0.0   -27     1150   No stop 
11 41 50  ---          17 40 59  55.6  43.1 -1.5       0.0   243     1184   11 37 24

11 42 30  J1907+0127   17 41 39  55.6  40.5 -1.4       0.0    12     1184   11 42 25
11 43 30  =1904+013    17 42 39  55.8  40.2 -1.4       0.0    60     1193   11 42 29

11 43 30  AQLX-1       17 42 39  55.9  42.5 -1.5       0.0   -27     1193   No stop 
11 48 00  ---          17 47 10  56.5  40.9 -1.4       0.0   243     1228   11 43 34

11 48 40  J1907+0127   17 47 50  56.5  38.3 -1.3       0.0    12     1228   11 48 35
11 50 10  =1904+013    17 49 20  56.7  37.7 -1.3       0.0    90     1240   11 48 39

11 50 10  AQLX-1       17 49 20  56.8  40.1 -1.4       0.0   -27     1240   No stop 
11 54 40  ---          17 53 51  57.5  38.4 -1.3       0.0   243     1275   11 50 14

11 55 20  J1907+0127   17 54 31  57.4  35.7 -1.2       0.0    12     1275   11 55 15
11 56 20  =1904+013    17 55 31  57.5  35.3 -1.2       0.0    60     1283   11 55 19

11 56 20  AQLX-1       17 55 31  57.7  37.8 -1.3       0.0   -27     1283   No stop 
12 00 50  ---          18 00 02  58.3  36.0 -1.2       0.0   243     1318   11 56 24
Schedule for HART      (Code Hh )                                   Page   4
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

12 01 30  J1907+0127   18 00 42  58.2  33.2 -1.1       0.0    12     1318   12 01 25
12 03 00  =1904+013    18 02 12  58.4  32.6 -1.1       0.0    90     1330   12 01 29

12 03 00  AQLX-1       18 02 12  58.6  35.1 -1.2       0.0   -27     1330   No stop 
12 07 30  ---          18 06 43  59.2  33.2 -1.1       0.0   243     1365   12 03 04

12 08 10  J1907+0127   18 07 23  59.0  30.4 -1.0       0.0    12     1365   12 08 05
12 09 10  =1904+013    18 08 23  59.1  29.9 -1.0       0.0    60     1373   12 08 09

12 09 10  AQLX-1       18 08 23  59.4  32.5 -1.1       0.0   -27     1373   No stop 
12 13 40  ---          18 12 54  59.9  30.5 -1.0       0.0   243     1408   12 09 14

12 14 20  J1907+0127   18 13 34  59.7  27.6 -0.9       0.0    12     1408   12 14 15
12 15 50  =1904+013    18 15 04  59.8  27.0 -0.9       0.0    90     1421   12 14 19

12 15 50  AQLX-1       18 15 04  60.2  29.5 -0.9       0.0   -27     1421   No stop 
12 20 20  ---          18 19 35  60.6  27.5 -0.9       0.0   243     1455   12 15 54

12 21 00  J1907+0127   18 20 15  60.3  24.6 -0.8       0.0    12     1455   12 20 55
12 22 00  =1904+013    18 21 15  60.4  24.1 -0.8       0.0    60     1464   12 20 59

12 24 00  1749+096     18 23 16  53.7 347.0  0.5       0.0    55     1464   12 23 55
12 29 00  ---          18 28 16  53.4 344.9  0.6       0.0   300     1503   12 23 59

12 31 00  J1907+0127   18 30 17  61.2  19.8 -0.6       0.0    55     1503   12 30 55
12 32 00  =1904+013    18 31 17  61.2  19.3 -0.6       0.0    60     1512   12 30 59

12 32 00  AQLX-1       18 31 17  61.7  21.9 -0.7       0.0   -27     1512   No stop 
12 36 30  ---          18 35 48  62.1  19.6 -0.6       0.0   243     1546   12 32 04

12 37 10  J1907+0127   18 36 28  61.6  16.7 -0.5       0.0    12     1546   12 37 05
12 38 40  =1904+013    18 37 58  61.7  15.9 -0.5       0.0    90     1559   12 37 09

12 38 40  AQLX-1       18 37 58  62.3  18.5 -0.6       0.0   -27     1559   No stop 
12 43 10  ---          18 42 29  62.6  16.1 -0.5       0.0   243     1593   12 38 44

12 43 50  J1907+0127   18 43 09  62.0  13.2 -0.4       0.0    12     1593   12 43 45
12 44 50  =1904+013    18 44 09  62.0  12.7 -0.4       0.0    60     1602   12 43 49

12 44 50  AQLX-1       18 44 09  62.7  15.2 -0.5       0.0   -27     1602   No stop 
12 49 20  ---          18 48 40  62.9  12.8 -0.4       0.0   243     1637   12 44 54

12 50 00  J1907+0127   18 49 20  62.3  10.0 -0.3       0.0    12     1637   12 49 55
12 51 30  =1904+013    18 50 50  62.3   9.2 -0.3       0.0    90     1649   12 49 59
Schedule for HART      (Code Hh )                                   Page   5
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

12 51 30  AQLX-1       18 50 50  63.0  11.7 -0.4       0.0   -27     1649   No stop 
12 56 00  ---          18 55 21  63.2   9.2 -0.3       0.0   243     1684   12 51 34

12 56 40  J1907+0127   18 56 01  62.5   6.4 -0.2       0.0    12     1684   12 56 35
12 57 40  =1904+013    18 57 01  62.5   5.8 -0.2       0.0    60     1692   12 56 39

12 57 40  AQLX-1       18 57 01  63.3   8.3 -0.2       0.0   -27     1692   No stop 
13 02 10  ---          19 01 32  63.4   5.8 -0.2       0.0   243     1727   12 57 44

13 02 50  J1907+0127   19 02 12  62.6   3.0 -0.1       0.0    12     1727   13 02 45
13 04 20  =1904+013    19 03 42  62.6   2.2 -0.1       0.0    90     1739   13 02 49

13 04 20  AQLX-1       19 03 42  63.4   4.6 -0.1       0.0   -27     1739   No stop 
13 08 50  ---          19 08 13  63.5   2.0 -0.1       0.0   243     1774   13 04 24

13 09 30  J1907+0127   19 08 53  62.6 359.4  0.0       0.0    12     1774   13 09 25
13 10 30  =1904+013    19 09 53  62.6 358.9  0.0       0.0    60     1782   13 09 29

13 10 30  AQLX-1       19 09 53  63.5   1.1 -0.0       0.0   -27     1782   No stop 
13 15 00  ---          19 14 24  63.5 358.6  0.0       0.0   243     1817   13 10 34

13 15 40  J1907+0127   19 15 04  62.6 356.1  0.1       0.0    12     1817   13 15 35
13 17 10  =1904+013    19 16 34  62.6 355.2  0.1       0.0    90     1830   13 15 39

13 17 10  AQLX-1       19 16 34  63.5 357.4  0.1       0.0   -27     1830   No stop 
13 21 40  ---          19 21 05  63.4 354.9  0.2       0.0   243     1864   13 17 14

13 22 20  J1907+0127   19 21 45  62.4 352.5  0.2       0.0    12     1864   13 22 15
13 23 20  =1904+013    19 22 45  62.4 351.9  0.2       0.0    60     1873   13 22 19

13 23 20  AQLX-1       19 22 45  63.4 353.9  0.2       0.0   -27     1873   No stop 
13 27 50  ---          19 27 16  63.2 351.4  0.3       0.0   243     1908   13 23 24

13 28 30  J1907+0127   19 27 56  62.2 349.2  0.3       0.0    12     1908   13 28 25
13 30 00  =1904+013    19 29 26  62.1 348.4  0.4       0.0    90     1920   13 28 29

13 30 00  AQLX-1       19 29 26  63.2 350.2  0.3       0.0   -27     1920   No stop 
13 34 30  ---          19 33 57  63.0 347.8  0.4       0.0   243     1955   13 30 04

13 35 10  J1907+0127   19 34 37  61.9 345.7  0.4       0.0    12     1955   13 35 05
13 36 10  =1904+013    19 35 37  61.8 345.1  0.5       0.0    60     1963   13 35 09

13 36 10  AQLX-1       19 35 37  62.9 346.9  0.4       0.0   -27     1963   No stop 
13 40 40  ---          19 40 08  62.6 344.5  0.5       0.0   243     1998   13 36 14
Schedule for HART      (Code Hh )                                   Page   6
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

13 41 20  J1907+0127   19 40 48  61.5 342.5  0.6       0.0    12     1998   13 41 15
13 42 50  =1904+013    19 42 18  61.4 341.7  0.6       0.0    90     2010   13 41 19

13 42 50  AQLX-1       19 42 18  62.5 343.3  0.5       0.0   -27     2010   No stop 
13 47 20  ---          19 46 49  62.2 341.0  0.6       0.0   243     2045   13 42 54

13 48 00  J1907+0127   19 47 29  61.0 339.2  0.7       0.0    12     2045   13 47 55
13 49 00  =1904+013    19 48 29  60.9 338.7  0.7       0.0    60     2053   13 47 59

13 51 00  1749+096     19 50 30  44.3 317.2  2.0       0.0    55     2053   13 50 55
13 56 00  ---          19 55 31  43.5 315.8  2.1       0.0   300     2093   13 50 59

13 58 00  J1907+0127   19 57 31  60.1 334.4  0.8       0.0    55     2093   13 57 55
13 59 00  =1904+013    19 58 31  60.0 334.0  0.8       0.0    60     2101   13 57 59

13 59 00  AQLX-1       19 58 31  61.2 335.2  0.8       0.0   -27     2101   No stop 
14 03 30  ---          20 03 02  60.8 333.0  0.9       0.0   243     2136   13 59 04

14 04 10  J1907+0127   20 03 42  59.5 331.6  0.9       0.0    12     2136   14 04 05
14 05 40  =1904+013    20 05 12  59.3 330.9  1.0       0.0    90     2148   14 04 09

14 05 40  AQLX-1       20 05 12  60.5 332.0  0.9       0.0   -27     2148   No stop 
14 10 10  ---          20 09 43  60.0 330.0  1.0       0.0   243     2183   14 05 44

14 10 50  J1907+0127   20 10 23  58.7 328.7  1.0       0.0    12     2183   14 10 45
14 11 50  =1904+013    20 11 23  58.6 328.3  1.1       0.0    60     2191   14 10 49

14 11 50  AQLX-1       20 11 23  59.9 329.2  1.0       0.0   -27     2191   No stop 
14 16 20  ---          20 15 54  59.3 327.3  1.1       0.0   243     2226   14 11 54

14 17 00  J1907+0127   20 16 34  58.0 326.1  1.1       0.0    12     2226   14 16 55
14 18 30  =1904+013    20 18 04  57.8 325.5  1.2       0.0    90     2239   14 16 59

14 18 30  AQLX-1       20 18 04  59.1 326.4  1.1       0.0   -27     2239   No stop 
14 23 00  ---          20 22 35  58.5 324.5  1.2       0.0   243     2273   14 18 34

14 23 40  J1907+0127   20 23 15  57.1 323.5  1.3       0.0    12     2273   14 23 35
14 24 40  =1904+013    20 24 15  57.0 323.1  1.3       0.0    60     2282   14 23 39

14 24 40  AQLX-1       20 24 15  58.3 323.8  1.2       0.0   -27     2282   No stop 
14 29 10  ---          20 28 46  57.6 322.0  1.3       0.0   243     2317   14 24 44

14 29 50  J1907+0127   20 29 26  56.3 321.1  1.4       0.0    12     2317   14 29 45
14 31 20  =1904+013    20 30 56  56.1 320.6  1.4       0.0    90     2329   14 29 49
Schedule for HART      (Code Hh )                                   Page   7
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

14 31 20  AQLX-1       20 30 56  57.3 321.2  1.3       0.0   -27     2329   No stop 
14 35 50  ---          20 35 27  56.7 319.5  1.4       0.0   243     2364   14 31 24

14 36 30  J1907+0127   20 36 07  55.3 318.7  1.5       0.0    12     2364   14 36 25
14 37 30  =1904+013    20 37 07  55.2 318.3  1.5       0.0    60     2372   14 36 29

14 37 30  AQLX-1       20 37 07  56.5 318.9  1.4       0.0   -27     2372   No stop 
14 42 00  ---          20 41 38  55.8 317.3  1.5       0.0   243     2407   14 37 34

14 42 40  J1907+0127   20 42 18  54.4 316.6  1.6       0.0    12     2407   14 42 35
14 44 10  =1904+013    20 43 49  54.1 316.1  1.6       0.0    90     2419   14 42 39

14 44 10  AQLX-1       20 43 49  55.4 316.5  1.5       0.0   -27     2419   No stop 
14 48 40  ---          20 48 19  54.7 315.0  1.6       0.0   243     2454   14 44 14

14 49 20  J1907+0127   20 48 59  53.3 314.4  1.7       0.0    12     2454   14 49 15
14 50 20  =1904+013    20 50 00  53.1 314.0  1.7       0.0    60     2462   14 49 19

14 50 20  AQLX-1       20 50 00  54.5 314.4  1.6       0.0   -27     2462   No stop 
14 54 50  ---          20 54 30  53.7 313.0  1.7       0.0   243     2497   14 50 24

14 55 30  J1907+0127   20 55 10  52.3 312.4  1.8       0.0    12     2497   14 55 25
14 57 00  =1904+013    20 56 41  52.0 312.0  1.8       0.0    90     2510   14 55 29

14 57 00  AQLX-1       20 56 41  53.4 312.3  1.7       0.0   -27     2510   No stop 
15 01 30  ---          21 01 11  52.6 310.9  1.8       0.0   243     2544   14 57 04

15 02 10  J1907+0127   21 01 51  51.2 310.4  1.9       0.0    12     2544   15 02 05
15 03 10  =1904+013    21 02 52  51.0 310.1  1.9       0.0    60     2553   15 02 09

15 03 10  AQLX-1       21 02 52  52.3 310.4  1.8       0.0   -27     2553   No stop 
15 07 40  ---          21 07 22  51.5 309.1  1.9       0.0   243     2588   15 03 14

15 08 20  J1907+0127   21 08 03  50.1 308.7  2.0       0.0    12     2588   15 08 15
15 09 50  =1904+013    21 09 33  49.8 308.3  2.0       0.0    90     2600   15 08 19

15 09 50  AQLX-1       21 09 33  51.2 308.4  2.0       0.0   -27     2600   No stop 
15 14 20  ---          21 14 03  50.4 307.2  2.0       0.0   243     2635   15 09 54

15 15 00  J1907+0127   21 14 44  48.9 306.9  2.1       0.0    12     2635   15 14 55
15 16 00  =1904+013    21 15 44  48.7 306.6  2.1       0.0    60     2643   15 14 59

15 18 00  1749+096     21 17 44  28.7 298.6  3.4       0.0    55     2643   15 17 55
15 23 00  ---          21 22 45  27.7 297.7  3.5       0.0   300     2682   15 17 59
Schedule for HART      (Code Hh )                                   Page   8
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

15 25 00  J1907+0127   21 24 45  47.1 304.3  2.3       0.0    55     2682   15 24 55
15 26 00  =1904+013    21 25 45  46.9 304.1  2.3       0.0    60     2691   15 24 59

15 26 00  AQLX-1       21 25 45  48.2 304.1  2.2       0.0   -27     2691   No stop 
15 30 30  ---          21 30 16  47.4 303.0  2.3       0.0   243     2726   15 26 04

15 31 10  J1907+0127   21 30 56  45.9 302.8  2.4       0.0    12     2726   15 31 05
15 32 40  =1904+013    21 32 26  45.6 302.5  2.4       0.0    90     2738   15 31 09

15 32 40  AQLX-1       21 32 26  47.0 302.5  2.3       0.0   -27     2738   No stop 
15 37 10  ---          21 36 57  46.1 301.4  2.4       0.0   243     2773   15 32 44

15 37 50  J1907+0127   21 37 37  44.6 301.3  2.5       0.0    12     2773   15 37 45
15 38 50  =1904+013    21 38 38  44.5 301.1  2.5       0.0    60     2781   15 37 49

15 38 50  AQLX-1       21 38 38  45.8 301.0  2.4       0.0   -27     2781   No stop 
15 43 20  ---          21 43 08  44.9 300.0  2.5       0.0   243     2816   15 38 54

15 44 00  J1907+0127   21 43 48  43.4 299.9  2.6       0.0    12     2816   15 43 55
15 45 30  =1904+013    21 45 19  43.2 299.6  2.6       0.0    90     2828   15 43 59

15 45 30  AQLX-1       21 45 19  44.5 299.6  2.6       0.0   -27     2828   No stop 
15 50 00  ---          21 49 49  43.6 298.6  2.6       0.0   243     2863   15 45 34

15 50 40  J1907+0127   21 50 29  42.1 298.5  2.7       0.0    12     2863   15 50 35
15 51 40  =1904+013    21 51 30  41.9 298.3  2.7       0.0    60     2871   15 50 39

15 51 40  AQLX-1       21 51 30  43.3 298.2  2.7       0.0   -27     2871   No stop 
15 56 10  ---          21 56 00  42.4 297.3  2.7       0.0   243     2906   15 51 44

15 56 50  J1907+0127   21 56 40  40.9 297.3  2.8       0.0    12     2906   15 56 45
15 58 20  =1904+013    21 58 11  40.6 297.0  2.8       0.0    90     2919   15 56 49

15 58 20  AQLX-1       21 58 11  41.9 296.9  2.8       0.0   -27     2919   No stop 
16 02 50  ---          22 02 41  41.0 296.0  2.8       0.0   243     2953   15 58 24

16 03 30  J1907+0127   22 03 22  39.6 296.0  2.9       0.0    12     2953   16 03 25
16 04 30  =1904+013    22 04 22  39.4 295.8  2.9       0.0    60     2962   16 03 29

16 04 30  AQLX-1       22 04 22  40.7 295.7  2.9       0.0   -27     2962   No stop 
16 09 00  ---          22 08 52  39.8 294.8  3.0       0.0   243     2997   16 04 34

16 09 40  J1907+0127   22 09 33  38.3 294.8  3.0       0.0    12     2997   16 09 35
16 11 10  =1904+013    22 11 03  38.0 294.5  3.1       0.0    90     3009   16 09 39
Schedule for HART      (Code Hh )                                   Page   9
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

16 11 10  AQLX-1       22 11 03  39.3 294.4  3.0       0.0   -27     3009   No stop 
16 15 40  ---          22 15 34  38.4 293.6  3.1       0.0   243     3044   16 11 14

16 16 20  J1907+0127   22 16 14  36.9 293.6  3.1       0.0    12     3044   16 16 15
16 17 20  =1904+013    22 17 14  36.7 293.4  3.2       0.0    60     3052   16 16 19

16 17 20  AQLX-1       22 17 14  38.1 293.3  3.1       0.0   -27     3052   No stop 
16 21 50  ---          22 21 45  37.1 292.5  3.2       0.0   243     3087   16 17 24

16 22 30  J1907+0127   22 22 25  35.7 292.5  3.2       0.0    12     3087   16 22 25
16 24 00  =1904+013    22 23 55  35.3 292.3  3.3       0.0    90     3099   16 22 29

16 24 00  AQLX-1       22 23 55  36.7 292.1  3.2       0.0   -27     3099   No stop 
16 28 30  ---          22 28 26  35.7 291.3  3.3       0.0   243     3134   16 24 04

16 29 10  J1907+0127   22 29 06  34.3 291.4  3.4       0.0    12     3134   16 29 05
16 30 10  =1904+013    22 30 06  34.1 291.3  3.4       0.0    60     3142   16 29 09

16 30 10  AQLX-1       22 30 06  35.4 291.0  3.3       0.0   -27     3142   No stop 
16 34 40  ---          22 34 37  34.4 290.3  3.4       0.0   243     3177   16 30 14

16 35 20  J1907+0127   22 35 17  33.0 290.4  3.5       0.0    12     3177   16 35 15
16 36 50  =1904+013    22 36 47  32.6 290.2  3.5       0.0    90     3189   16 35 19

16 36 50  AQLX-1       22 36 47  34.0 289.9  3.4       0.0   -27     3189   No stop 
16 41 20  ---          22 41 18  33.0 289.2  3.5       0.0   243     3224   16 36 54

16 42 00  J1907+0127   22 41 58  31.5 289.4  3.6       0.0    12     3224   16 41 55
16 43 00  =1904+013    22 42 58  31.3 289.2  3.6       0.0    60     3233   16 41 59

16 45 00  1749+096     22 44 58  10.5 286.2  4.9       0.0    55     3233   16 44 55
16 50 00  ---          22 49 59   9.5 285.6  5.0       0.0   300     3272   16 44 59

16 52 00  J1907+0127   22 52 00  29.4 287.8  3.7       0.0    55     3272   16 51 55
16 53 00  =1904+013    22 53 00  29.2 287.7  3.8       0.0    60     3280   16 51 59

16 53 00  AQLX-1       22 53 00  30.5 287.4  3.7       0.0   -27     3280   No stop 
16 57 30  ---          22 57 30  29.5 286.8  3.8       0.0   243     3315   16 53 04

16 58 10  J1907+0127   22 58 11  28.1 286.9  3.8       0.0    12     3315   16 58 05
16 59 40  =1904+013    22 59 41  27.8 286.7  3.9       0.0    90     3328   16 58 09

16 59 40  AQLX-1       22 59 41  29.1 286.5  3.8       0.0   -27     3328   No stop 
17 04 10  ---          23 04 12  28.1 285.8  3.9       0.0   243     3362   16 59 44
Schedule for HART      (Code Hh )                                   Page  10
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

17 04 50  J1907+0127   23 04 52  26.6 286.0  4.0       0.0    12     3362   17 04 45
17 05 50  =1904+013    23 05 52  26.4 285.8  4.0       0.0    60     3371   17 04 49

17 05 50  AQLX-1       23 05 52  27.7 285.6  3.9       0.0   -27     3371   No stop 
17 10 20  ---          23 10 23  26.8 284.9  4.0       0.0   243     3406   17 05 54

17 11 00  J1907+0127   23 11 03  25.3 285.1  4.1       0.0    12     3406   17 10 55
17 12 30  =1904+013    23 12 33  25.0 284.9  4.1       0.0    90     3418   17 10 59

17 12 30  AQLX-1       23 12 33  26.3 284.6  4.0       0.0   -27     3418   No stop 
17 17 00  ---          23 17 04  25.3 284.0  4.1       0.0   243     3453   17 12 34

17 17 40  J1907+0127   23 17 44  23.8 284.2  4.2       0.0    12     3453   17 17 35
17 18 40  =1904+013    23 18 44  23.6 284.1  4.2       0.0    60     3461   17 17 39

17 18 40  AQLX-1       23 18 44  24.9 283.8  4.1       0.0   -27     3461   No stop 
17 23 10  ---          23 23 15  24.0 283.2  4.2       0.0   243     3496   17 18 44

17 23 50  J1907+0127   23 23 55  22.5 283.4  4.3       0.0    12     3496   17 23 45
17 25 20  =1904+013    23 25 25  22.2 283.2  4.3       0.0    90     3508   17 23 49

17 25 20  AQLX-1       23 25 25  23.5 282.9  4.2       0.0   -27     3508   No stop 
17 29 50  ---          23 29 56  22.5 282.3  4.3       0.0   243     3543   17 25 24

17 30 30  J1907+0127   23 30 36  21.0 282.5  4.4       0.0    12     3543   17 30 25
17 31 30  =1904+013    23 31 36  20.8 282.4  4.4       0.0    60     3551   17 30 29

17 31 30  AQLX-1       23 31 36  22.1 282.1  4.3       0.0   -27     3551   No stop 
17 36 00  ---          23 36 07  21.1 281.5  4.4       0.0   243     3586   17 31 34

17 36 40  J1907+0127   23 36 47  19.7 281.8  4.5       0.0    12     3586   17 36 35
17 38 10  =1904+013    23 38 17  19.3 281.6  4.5       0.0    90     3598   17 36 39

17 38 10  AQLX-1       23 38 17  20.6 281.3  4.4       0.0   -27     3598   No stop 
17 42 40  ---          23 42 48  19.6 280.7  4.5       0.0   243     3633   17 38 14

17 43 20  J1907+0127   23 43 28  18.2 280.9  4.6       0.0    12     3633   17 43 15
17 44 20  =1904+013    23 44 28  18.0 280.8  4.6       0.0    60     3642   17 43 19

17 44 20  AQLX-1       23 44 28  19.3 280.5  4.5       0.0   -27     3642   No stop 
17 48 50  ---          23 48 59  18.3 279.9  4.6       0.0   243     3677   17 44 24

17 49 30  J1907+0127   23 49 39  16.8 280.2  4.7       0.0    12     3677   17 49 25
17 51 00  =1904+013    23 51 09  16.5 280.0  4.7       0.0    90     3689   17 49 29
Schedule for HART      (Code Hh )                                   Page  11
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

17 51 00  AQLX-1       23 51 09  17.8 279.7  4.7       0.0   -27     3689   No stop 
17 55 30  ---          23 55 40  16.8 279.1  4.7       0.0   243     3724   17 51 04

17 56 10  J1907+0127   23 56 20  15.3 279.4  4.8       0.0    12     3724   17 56 05
18 00 00  =1904+013    00 00 11  14.5 278.9  4.9       0.0   230     3754   17 56 09

18 02 00  3C454.3      00 02 11  44.8 336.8  1.1       0.0   -19     3754   18 01 55
18 15 00  ---          00 15 13  43.5 332.8  1.3       0.0   761     3855   18 01 59

18 17 00  3C48         00 17 13  27.8  19.2 -1.4       0.0    12     3855   18 16 55
18 30 00  ---          00 30 16  28.7  16.2 -1.1       0.0   780     3957   18 16 59

18 32 00  3C84         00 32 16  12.1  30.9 -2.8       0.0    42     3957   18 31 55
18 45 00  ---          00 45 18  13.6  28.9 -2.6       0.0   780     4058   18 31 59

18 45 40  3C84         00 45 58  13.6  28.8 -2.6       0.0    19     4058   18 45 35
19 00 00  ---          01 00 21  15.1  26.5 -2.3       0.0   860     4169   18 45 39

19 02 00  0234+285     01 02 21  30.6  24.5 -1.6       0.0    68     4169   19 01 55
19 15 00  ---          01 15 23  31.7  21.5 -1.4       0.0   780     4271   19 01 59

19 15 40  0234+285     01 16 03  31.8  21.3 -1.4       0.0    19     4271   19 15 35
19 30 00  ---          01 30 25  32.9  17.8 -1.1       0.0   860     4382   19 15 39

19 30 40  0234+285     01 31 06  32.9  17.6 -1.1       0.0    19     4382   19 30 35
19 45 00  ---          01 45 28  33.8  14.0 -0.9       0.0   860     4494   19 30 39

19 45 40  0234+285     01 46 08  33.8  13.8 -0.9       0.0    19     4494   19 45 35
20 00 00  ---          02 00 30  34.5  10.1 -0.6       0.0   860     4606   19 45 39

20 00 40  0234+285     02 01 11  34.5  10.0 -0.6       0.0    19     4606   20 00 35
20 15 00  ---          02 15 33  35.0   6.2 -0.4       0.0   860     4717   20 00 39

20 15 40  0234+285     02 16 13  35.0   6.0 -0.4       0.0    19     4717   20 15 35
20 30 00  ---          02 30 35  35.2   2.2 -0.1       0.0   860     4829   20 15 39

20 30 40  0234+285     02 31 15  35.2   2.0 -0.1       0.0    19     4829   20 30 35
20 45 00  ---          02 45 38  35.2 358.1  0.1       0.0   860     4940   20 30 39

20 45 40  0234+285     02 46 18  35.2 357.9  0.1       0.0    19     4940   20 45 35
21 00 00  ---          03 00 40  35.0 354.1  0.4       0.0   860     5052   20 45 39

21 00 40  0234+285     03 01 20  35.0 353.9  0.4       0.0    19     5052   21 00 35
21 15 00  ---          03 15 43  34.5 350.1  0.6       0.0   860     5164   21 00 39
Schedule for HART      (Code Hh )                                   Page  12
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Nov 2011   Day 327 ---

21 15 40  0234+285     03 16 23  34.5 350.0  0.6       0.0    19     5164   21 15 35
21 30 00  ---          03 30 45  33.8 346.2  0.9       0.0   860     5275   21 15 39

21 30 40  0234+285     03 31 25  33.8 346.1  0.9       0.0    19     5275   21 30 35
21 45 00  ---          03 45 48  32.9 342.5  1.1       0.0   860     5387   21 30 39

21 45 40  0234+285     03 46 28  32.9 342.3  1.1       0.0    19     5387   21 45 35
22 00 00  ---          04 00 50  31.8 338.8  1.4       0.0   860     5498   21 45 39

22 00 40  0234+285     04 01 30  31.8 338.6  1.4       0.0    19     5498   22 00 35
22 15 00  ---          04 15 53  30.5 335.3  1.6       0.0   860     5610   22 00 39

22 15 40  0234+285     04 16 33  30.4 335.1  1.6       0.0    19     5610   22 15 35
22 30 00  ---          04 30 55  29.0 331.9  1.9       0.0   860     5722   22 15 39

22 30 40  0234+285     04 31 35  28.9 331.7  1.9       0.0    19     5722   22 30 35
22 45 00  ---          04 45 58  27.3 328.7  2.1       0.0   860     5833   22 30 39

22 45 40  0234+285     04 46 38  27.2 328.5  2.1       0.0    19     5833   22 45 35
23 00 00  ---          05 01 00  25.5 325.6  2.4       0.0   860     5945   22 45 39

23 00 40  0234+285     05 01 40  25.4 325.5  2.4       0.0    19     5945   23 00 35
23 15 00  ---          05 16 02  23.5 322.7  2.6       0.0   860     6056   23 00 39

23 15 40  0234+285     05 16 43  23.4 322.6  2.6       0.0    19     6056   23 15 35
23 30 00  ---          05 31 05  21.4 320.0  2.9       0.0   860     6168   23 15 39

23 30 40  0234+285     05 31 45  21.3 319.9  2.9       0.0    19     6168   23 30 35
23 45 00  ---          05 46 07  19.1 317.4  3.1       0.0   860     6280   23 30 39

23 45 40  0234+285     05 46 47  19.0 317.3  3.1       0.0    19     6280   23 45 35
23 59 59  ---          06 01 10  16.8 315.0  3.4       0.0   859     6391   23 45 39

 --- Thu  24 Nov 2011   Day 328 ---

00 02 00  DA193        06 03 10  24.3 358.6  0.1       0.0    -5     6391   00 01 55
00 15 00  ---          06 16 12  24.1 355.8  0.3       0.0   775     6492   00 01 59

00 15 40  DA193        06 16 52  24.1 355.7  0.3       0.0    19     6492   00 15 35
00 30 00  ---          06 31 15  23.8 352.7  0.6       0.0   860     6604   00 15 39

00 30 40  DA193        06 31 55  23.8 352.6  0.6       0.0    19     6604   00 30 35
00 45 00  ---          06 46 17  23.3 349.6  0.8       0.0   860     6716   00 30 39
Schedule for HART      (Code Hh )                                   Page  13
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

00 45 40  DA193        06 46 57  23.2 349.5  0.8       0.0    19     6716   00 45 35
01 00 00  ---          07 01 20  22.6 346.6  1.1       0.0   860     6827   00 45 39

01 00 40  DA193        07 02 00  22.5 346.4  1.1       0.0    19     6827   01 00 35
01 15 00  ---          07 16 22  21.7 343.6  1.3       0.0   860     6939   01 00 39

01 15 40  DA193        07 17 02  21.7 343.4  1.3       0.0    19     6939   01 15 35
01 30 00  ---          07 31 25  20.7 340.7  1.6       0.0   860     7051   01 15 39

01 30 40  DA193        07 32 05  20.6 340.6  1.6       0.0    19     7051   01 30 35
01 45 00  ---          07 46 27  19.5 337.9  1.8       0.0   860     7162   01 30 39

01 45 40  DA193        07 47 07  19.4 337.8  1.8       0.0    19     7162   01 45 35
02 00 00  ---          08 01 30  18.1 335.2  2.1       0.0   860     7274   01 45 39

02 00 40  DA193        08 02 10  18.1 335.1  2.1       0.0    19     7274   02 00 35
02 15 00  ---          08 16 32  16.6 332.6  2.3       0.0   860     7385   02 00 39

02 15 40  DA193        08 17 12  16.6 332.5  2.3       0.0    19     7385   02 15 35
02 30 00  ---          08 31 34  15.0 330.1  2.6       0.0   860     7497   02 15 39

02 30 40  DA193        08 32 15  14.9 330.0  2.6       0.0    19     7497   02 30 35
02 45 00  ---          08 46 37  13.3 327.7  2.8       0.0   860     7609   02 30 39

02 45 40  DA193        08 47 17  13.2 327.6  2.8       0.0    19     7609   02 45 35
03 00 00  ---          09 01 39  11.4 325.5  3.1       0.0   860     7720   02 45 39

03 02 00  1156+295     09 03 40  20.6  40.5 -2.9       0.0   -87     7720   03 01 55
03 15 00  ---          09 16 42  22.4  38.2 -2.7       0.0   693     7821   03 01 59

03 15 40  1156+295     09 17 22  22.5  38.0 -2.7       0.0    19     7821   03 15 35
03 30 00  ---          09 31 44  24.4  35.3 -2.5       0.0   860     7933   03 15 39

03 30 40  1156+295     09 32 24  24.5  35.2 -2.5       0.0    19     7933   03 30 35
03 45 00  ---          09 46 47  26.3  32.4 -2.2       0.0   860     8045   03 30 39

03 45 40  1156+295     09 47 27  26.4  32.2 -2.2       0.0    19     8045   03 45 35
04 00 00  ---          10 01 49  28.1  29.2 -2.0       0.0   860     8156   03 45 39

04 00 40  1156+295     10 02 29  28.1  29.1 -2.0       0.0    19     8156   04 00 35
04 15 00  ---          10 16 52  29.6  25.9 -1.7       0.0   860     8268   04 00 39

04 15 40  1156+295     10 17 32  29.7  25.8 -1.7       0.0    19     8268   04 15 35
04 30 00  ---          10 31 54  31.0  22.5 -1.5       0.0   860     8379   04 15 39
Schedule for HART      (Code Hh )                                   Page  14
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

04 30 40  1156+295     10 32 34  31.1  22.3 -1.5       0.0    19     8379   04 30 35
04 45 00  ---          10 46 57  32.2  18.9 -1.2       0.0   860     8491   04 30 39

04 45 40  1156+295     10 47 37  32.3  18.7 -1.2       0.0    19     8491   04 45 35
05 00 00  ---          11 01 59  33.2  15.2 -1.0       0.0   860     8603   04 45 39

05 00 40  1156+295     11 02 39  33.2  15.0 -1.0       0.0    19     8603   05 00 35
05 15 00  ---          11 17 02  34.0  11.4 -0.7       0.0   860     8714   05 00 39

05 15 40  1156+295     11 17 42  34.0  11.2 -0.7       0.0    19     8714   05 15 35
05 30 00  ---          11 32 04  34.5   7.4 -0.5       0.0   860     8826   05 15 39

05 30 40  1156+295     11 32 44  34.5   7.3 -0.5       0.0    19     8826   05 30 35
05 45 00  ---          11 47 07  34.8   3.5 -0.2       0.0   860     8937   05 30 39

05 45 40  1156+295     11 47 47  34.9   3.3 -0.2       0.0    19     8937   05 45 35
06 00 00  ---          12 02 09  34.9 359.5  0.0       0.0   860     9049   05 45 39

06 00 40  1156+295     12 02 49  34.9 359.3  0.0       0.0    19     9049   06 00 35
06 15 00  ---          12 17 11  34.8 355.5  0.3       0.0   860     9161   06 00 39

06 15 40  1156+295     12 17 52  34.8 355.3  0.3       0.0    19     9161   06 15 35
06 30 00  ---          12 32 14  34.4 351.5  0.5       0.0   860     9272   06 15 39

06 30 40  1156+295     12 32 54  34.4 351.3  0.5       0.0    19     9272   06 30 35
06 45 00  ---          12 47 16  33.8 347.6  0.8       0.0   860     9384   06 30 39

06 45 40  1156+295     12 47 56  33.8 347.4  0.8       0.0    19     9384   06 45 35
07 00 00  ---          13 02 19  33.0 343.8  1.0       0.0   860     9496   06 45 39

07 02 00  3C273B       13 04 19  60.9 342.0  0.6       0.0    39     9496   07 01 55
07 15 00  ---          13 17 21  59.8 335.8  0.8       0.0   780     9597   07 01 59

07 15 40  3C273B       13 18 01  59.8 335.5  0.8       0.0    19     9597   07 15 35
07 30 00  ---          13 32 24  58.3 329.1  1.0       0.0   860     9708   07 15 39

07 31 00  3C279        13 33 24  68.1 334.9  0.6       0.0    17     9708   07 30 55
07 45 00  ---          13 47 26  66.6 326.7  0.8       0.0   840     9817   07 30 59

07 45 40  3C279        13 48 06  66.5 326.4  0.9       0.0    19     9817   07 45 35
08 00 00  ---          14 02 29  64.6 319.1  1.1       0.0   860     9929   07 45 39

08 02 00  J1448-1620   14 04 29  76.0  49.6 -0.7       0.0    37     9929   08 01 55
08 08 00  =1445-161    14 10 30  77.0  45.1 -0.6       0.0   360     9976   08 01 59
Schedule for HART      (Code Hh )                                   Page  15
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

08 09 00  J1445-1629   14 11 30  77.6  42.8 -0.6       0.0    34     9976   08 08 55
08 15 00  =1443-162    14 17 31  78.5  37.3 -0.5       0.0   360    10023   08 08 59

08 15 30  J1459-1810   14 18 01  77.6  53.9 -0.7       0.0    -4    10023   08 15 25
08 16 30  =1456-179    14 19 01  77.8  53.2 -0.7       0.0    56    10032   08 15 29

08 16 30  J1455-1700   14 19 01  77.7  45.8 -0.6       0.0   -28    10032   No stop 
08 18 00  =1452-168    14 20 32  78.0  44.5 -0.6       0.0    62    10043   08 16 34

08 18 00  J1459-1810   14 20 32  78.1  52.1 -0.7       0.0   -28    10043   No stop 
08 19 30  =1456-179    14 22 02  78.3  50.9 -0.6       0.0    62    10055   08 18 04

08 19 30  J1455-1700   14 22 02  78.2  43.2 -0.6       0.0   -28    10055   No stop 
08 21 00  =1452-168    14 23 32  78.4  41.8 -0.5       0.0    62    10066   08 19 34

08 21 00  J1459-1810   14 23 32  78.6  49.7 -0.6       0.0   -28    10066   No stop 
08 22 30  =1456-179    14 25 02  78.8  48.4 -0.6       0.0    62    10078   08 21 04

08 23 10  VLA2         14 25 42  81.1  42.5 -0.4       0.0     9    10078   08 23 05
08 24 10  ---          14 26 43  81.3  41.3 -0.4       0.0    60    10086   08 23 09

08 24 10  VLA1         14 26 43  81.4  45.7 -0.4       0.0   -26    10086   No stop 
08 25 30  ---          14 28 03  81.6  44.1 -0.4       0.0    54    10097   08 24 14

08 25 30  GRB          14 28 03  81.5  45.5 -0.4       0.0   -24    10097   No stop 
08 28 00  ---          14 30 33  81.9  42.4 -0.4       0.0   126    10116   08 25 34

08 28 00  VLA1         14 30 33  82.0  41.0 -0.4       0.0   -24    10116   No stop 
08 29 20  ---          14 31 54  82.2  39.1 -0.3       0.0    56    10126   08 28 04

08 29 20  GRB          14 31 54  82.1  40.7 -0.4       0.0   -24    10126   No stop 
08 31 50  ---          14 34 24  82.4  37.2 -0.3       0.0   126    10146   08 29 24

08 31 50  VLA1         14 34 24  82.6  35.5 -0.3       0.0   -24    10146   No stop 
08 33 10  ---          14 35 44  82.7  33.4 -0.3       0.0    56    10156   08 31 54

08 33 10  GRB          14 35 44  82.6  35.2 -0.3       0.0   -24    10156   No stop 
08 35 40  ---          14 38 15  82.9  31.2 -0.3       0.0   126    10175   08 33 14

08 35 40  VLA1         14 38 15  83.0  29.3 -0.2       0.0   -24    10175   No stop 
08 37 00  ---          14 39 35  83.2  27.0 -0.2       0.0    56    10186   08 35 44

08 37 00  GRB          14 39 35  83.1  28.9 -0.2       0.0   -24    10186   No stop 
08 39 30  ---          14 42 05  83.3  24.4 -0.2       0.0   126    10205   08 37 04
Schedule for HART      (Code Hh )                                   Page  16
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

08 40 10  VLA2         14 42 45  83.0  16.5 -0.1       0.0    14    10205   08 40 05
08 41 10  ---          14 43 45  83.1  14.6 -0.1       0.0    60    10214   08 40 09

08 41 10  VLA1         14 43 45  83.5  19.1 -0.1       0.0   -26    10214   No stop 
08 42 30  ---          14 45 06  83.6  16.4 -0.1       0.0    54    10224   08 41 14

08 42 30  GRB          14 45 06  83.6  18.6 -0.1       0.0   -24    10224   No stop 
08 45 00  ---          14 47 36  83.7  13.5 -0.1       0.0   126    10243   08 42 34

08 45 00  VLA1         14 47 36  83.8  11.2 -0.1       0.0   -24    10243   No stop 
08 46 20  ---          14 48 56  83.8   8.3 -0.1       0.0    56    10254   08 45 04

08 46 20  GRB          14 48 56  83.8  10.6 -0.1       0.0   -24    10254   No stop 
08 48 50  ---          14 51 27  83.9   5.2 -0.0       0.0   126    10273   08 46 24

08 48 50  VLA1         14 51 27  83.9   2.8 -0.0       0.0   -24    10273   No stop 
08 50 10  ---          14 52 47  83.9 359.9  0.0       0.0    56    10283   08 48 54

08 50 10  GRB          14 52 47  83.9   2.2 -0.0       0.0   -24    10283   No stop 
08 52 40  ---          14 55 17  83.9 356.7  0.0       0.0   126    10303   08 50 14

08 52 40  VLA1         14 55 17  83.8 354.4  0.0       0.0   -24    10303   No stop 
08 54 00  ---          14 56 38  83.8 351.5  0.1       0.0    56    10313   08 52 44

08 54 00  GRB          14 56 38  83.9 353.8  0.0       0.0   -24    10313   No stop 
08 56 30  ---          14 59 08  83.8 348.4  0.1       0.0   126    10332   08 54 04

08 57 10  VLA2         14 59 48  83.0 342.8  0.1       0.0    14    10332   08 57 05
08 58 10  ---          15 00 48  82.9 341.0  0.2       0.0    60    10341   08 57 09

08 58 10  VLA1         15 00 48  83.6 342.7  0.1       0.0   -26    10341   No stop 
08 59 30  ---          15 02 08  83.5 340.0  0.2       0.0    54    10351   08 58 14

08 59 30  GRB          15 02 08  83.6 342.1  0.1       0.0   -24    10351   No stop 
09 02 00  ---          15 04 39  83.4 337.2  0.2       0.0   126    10370   08 59 34

09 02 00  VLA1         15 04 39  83.3 335.3  0.2       0.0   -24    10370   No stop 
09 03 20  ---          15 05 59  83.2 332.8  0.2       0.0    56    10381   09 02 04

09 03 20  GRB          15 05 59  83.3 334.7  0.2       0.0   -24    10381   No stop 
09 05 50  ---          15 08 30  83.0 330.3  0.2       0.0   126    10400   09 03 24

09 05 50  VLA1         15 08 30  82.9 328.5  0.3       0.0   -24    10400   No stop 
09 07 10  ---          15 09 50  82.7 326.4  0.3       0.0    56    10410   09 05 54
Schedule for HART      (Code Hh )                                   Page  17
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

09 07 10  GRB          15 09 50  82.9 328.0  0.3       0.0   -24    10410   No stop 
09 09 40  ---          15 12 20  82.6 324.1  0.3       0.0   126    10430   09 07 14

09 09 40  VLA1         15 12 20  82.4 322.6  0.3       0.0   -24    10430   No stop 
09 11 00  ---          15 13 40  82.2 320.7  0.3       0.0    56    10440   09 09 44

09 11 00  GRB          15 13 40  82.4 322.1  0.3       0.0   -24    10440   No stop 
09 13 30  ---          15 16 11  82.0 318.7  0.4       0.0   126    10459   09 11 04

09 14 10  VLA2         15 16 51  81.1 317.1  0.4       0.0    14    10459   09 14 05
09 15 10  ---          15 17 51  80.9 315.9  0.4       0.0    60    10468   09 14 09

09 15 10  VLA1         15 17 51  81.6 315.3  0.4       0.0   -26    10468   No stop 
09 16 30  ---          15 19 11  81.4 313.8  0.4       0.0    54    10478   09 15 14

09 16 30  GRB          15 19 11  81.5 315.0  0.4       0.0   -24    10478   No stop 
09 19 00  ---          15 21 42  81.1 312.1  0.5       0.0   126    10497   09 16 34

09 19 00  VLA1         15 21 42  80.9 311.1  0.5       0.0   -24    10497   No stop 
09 20 20  ---          15 23 02  80.7 309.7  0.5       0.0    56    10508   09 19 04

09 20 20  GRB          15 23 02  80.9 310.7  0.5       0.0   -24    10508   No stop 
09 22 50  ---          15 25 32  80.5 308.3  0.5       0.0   126    10527   09 20 24

09 22 50  VLA1         15 25 32  80.3 307.4  0.5       0.0   -24    10527   No stop 
09 24 10  ---          15 26 53  80.0 306.2  0.6       0.0    56    10537   09 22 54

09 24 10  GRB          15 26 53  80.2 307.0  0.6       0.0   -24    10537   No stop 
09 26 40  ---          15 29 23  79.8 304.9  0.6       0.0   126    10557   09 24 14

09 26 40  VLA1         15 29 23  79.6 304.1  0.6       0.0   -24    10557   No stop 
09 28 00  ---          15 30 43  79.3 303.1  0.6       0.0    56    10567   09 26 44

09 28 00  GRB          15 30 43  79.5 303.8  0.6       0.0   -24    10567   No stop 
09 30 30  ---          15 33 14  79.1 301.9  0.7       0.0   126    10586   09 28 04

09 31 10  VLA2         15 33 54  78.1 301.9  0.7       0.0    14    10586   09 31 05
09 32 10  ---          15 34 54  77.9 301.3  0.7       0.0    60    10595   09 31 09

09 32 10  VLA1         15 34 54  78.5 300.1  0.7       0.0   -26    10595   No stop 
09 33 30  ---          15 36 14  78.3 299.2  0.7       0.0    54    10605   09 32 14

09 33 30  GRB          15 36 14  78.5 299.8  0.7       0.0   -24    10605   No stop 
09 36 00  ---          15 38 44  78.0 298.2  0.7       0.0   126    10624   09 33 34
Schedule for HART      (Code Hh )                                   Page  18
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

09 36 00  VLA1         15 38 44  77.8 297.7  0.8       0.0   -24    10624   No stop 
09 37 20  ---          15 40 05  77.5 296.9  0.8       0.0    56    10635   09 36 04

09 37 20  GRB          15 40 05  77.7 297.4  0.8       0.0   -24    10635   No stop 
09 39 50  ---          15 42 35  77.2 296.0  0.8       0.0   126    10654   09 37 24

09 39 50  VLA1         15 42 35  77.0 295.5  0.8       0.0   -24    10654   No stop 
09 41 10  ---          15 43 55  76.7 294.8  0.9       0.0    56    10664   09 39 54

09 41 10  GRB          15 43 55  76.9 295.3  0.8       0.0   -24    10664   No stop 
09 43 40  ---          15 46 26  76.4 294.0  0.9       0.0   126    10684   09 41 14

09 43 40  VLA1         15 46 26  76.2 293.6  0.9       0.0   -24    10684   No stop 
09 45 00  ---          15 47 46  75.9 293.0  0.9       0.0    56    10694   09 43 44

09 45 00  GRB          15 47 46  76.2 293.4  0.9       0.0   -24    10694   No stop 
09 47 30  ---          15 50 16  75.6 292.3  0.9       0.0   126    10714   09 45 04

09 48 00  J1459-1810   15 50 46  76.0 300.6  0.8       0.0     1    10714   09 47 55
09 49 00  =1456-179    15 51 47  75.8 300.1  0.9       0.0    60    10722   09 47 59

09 49 00  J1455-1700   15 51 47  74.3 301.4  0.9       0.0   -28    10722   No stop 
09 50 30  =1452-168    15 53 17  74.0 300.6  1.0       0.0    62    10734   09 49 04

09 50 30  J1459-1810   15 53 17  75.5 299.3  0.9       0.0   -28    10734   No stop 
09 52 00  =1456-179    15 54 47  75.2 298.5  0.9       0.0    62    10745   09 50 34

09 52 00  J1455-1700   15 54 47  73.7 299.9  1.0       0.0   -28    10745   No stop 
09 53 30  =1452-168    15 56 17  73.4 299.1  1.0       0.0    62    10757   09 52 04

09 53 30  J1459-1810   15 56 17  74.9 297.7  0.9       0.0   -28    10757   No stop 
09 55 00  =1456-179    15 57 48  74.6 297.0  1.0       0.0    62    10768   09 53 34

09 55 40  VLA2         15 58 28  73.1 289.8  1.1       0.0     9    10768   09 55 35
09 56 40  ---          15 59 28  72.9 289.5  1.1       0.0    60    10777   09 55 39

09 56 40  VLA1         15 59 28  73.5 288.3  1.1       0.0   -26    10777   No stop 
09 58 00  ---          16 00 48  73.2 287.8  1.1       0.0    54    10787   09 56 44

09 58 00  GRB          16 00 48  73.4 288.2  1.1       0.0   -24    10787   No stop 
10 00 30  ---          16 03 18  72.9 287.3  1.2       0.0   126    10806   09 58 04

10 00 30  VLA1         16 03 18  72.6 287.0  1.2       0.0   -24    10806   No stop 
10 01 50  ---          16 04 39  72.4 286.6  1.2       0.0    56    10817   10 00 34
Schedule for HART      (Code Hh )                                   Page  19
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

10 01 50  GRB          16 04 39  72.6 286.9  1.2       0.0   -24    10817   No stop 
10 04 20  ---          16 07 09  72.1 286.1  1.2       0.0   126    10836   10 01 54

10 04 20  VLA1         16 07 09  71.8 285.8  1.2       0.0   -24    10836   No stop 
10 05 40  ---          16 08 29  71.5 285.5  1.3       0.0    56    10846   10 04 24

10 05 40  GRB          16 08 29  71.8 285.7  1.2       0.0   -24    10846   No stop 
10 08 10  ---          16 11 00  71.2 285.0  1.3       0.0   126    10866   10 05 44

10 08 10  VLA1         16 11 00  71.0 284.7  1.3       0.0   -24    10866   No stop 
10 09 30  ---          16 12 20  70.7 284.4  1.3       0.0    56    10876   10 08 14

10 09 30  GRB          16 12 20  70.9 284.6  1.3       0.0   -24    10876   No stop 
10 12 00  ---          16 14 50  70.4 284.0  1.4       0.0   126    10895   10 09 34

10 12 40  VLA2         16 15 30  69.4 284.6  1.4       0.0    14    10895   10 12 35
10 13 40  ---          16 16 31  69.2 284.4  1.4       0.0    60    10904   10 12 39

10 13 40  VLA1         16 16 31  69.8 283.3  1.4       0.0   -26    10904   No stop 
10 15 00  ---          16 17 51  69.5 283.0  1.4       0.0    54    10914   10 13 44

10 15 00  GRB          16 17 51  69.7 283.2  1.4       0.0   -24    10914   No stop 
10 17 30  ---          16 20 21  69.2 282.6  1.4       0.0   126    10934   10 15 04

10 17 30  VLA1         16 20 21  68.9 282.4  1.5       0.0   -24    10934   No stop 
10 18 50  ---          16 21 41  68.6 282.1  1.5       0.0    56    10944   10 17 34

10 18 50  GRB          16 21 41  68.9 282.3  1.5       0.0   -24    10944   No stop 
10 21 20  ---          16 24 12  68.3 281.7  1.5       0.0   126    10963   10 18 54

10 21 20  VLA1         16 24 12  68.1 281.5  1.5       0.0   -24    10963   No stop 
10 22 40  ---          16 25 32  67.8 281.2  1.5       0.0    56    10974   10 21 24

10 22 40  GRB          16 25 32  68.0 281.4  1.5       0.0   -24    10974   No stop 
10 25 10  ---          16 28 03  67.5 280.9  1.6       0.0   126    10993   10 22 44

10 25 10  VLA1         16 28 03  67.2 280.7  1.6       0.0   -24    10993   No stop 
10 26 30  ---          16 29 23  66.9 280.4  1.6       0.0    56    11003   10 25 14

10 26 30  GRB          16 29 23  67.2 280.6  1.6       0.0   -24    11003   No stop 
10 29 00  ---          16 31 53  66.6 280.1  1.6       0.0   126    11023   10 26 34

10 29 40  VLA2         16 32 33  65.7 280.7  1.7       0.0    14    11023   10 29 35
10 30 40  ---          16 33 33  65.5 280.5  1.7       0.0    60    11031   10 29 39
Schedule for HART      (Code Hh )                                   Page  20
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

10 30 40  VLA1         16 33 33  66.0 279.6  1.7       0.0   -26    11031   No stop 
10 32 00  ---          16 34 54  65.7 279.3  1.7       0.0    54    11041   10 30 44

10 32 00  GRB          16 34 54  66.0 279.5  1.7       0.0   -24    11041   No stop 
10 34 30  ---          16 37 24  65.4 279.0  1.7       0.0   126    11061   10 32 04

10 34 30  VLA1         16 37 24  65.2 278.8  1.7       0.0   -24    11061   No stop 
10 35 50  ---          16 38 44  64.9 278.6  1.8       0.0    56    11071   10 34 34

10 35 50  GRB          16 38 44  65.1 278.8  1.7       0.0   -24    11071   No stop 
10 38 20  ---          16 41 15  64.6 278.3  1.8       0.0   126    11090   10 35 54

10 38 20  VLA1         16 41 15  64.3 278.2  1.8       0.0   -24    11090   No stop 
10 39 40  ---          16 42 35  64.0 277.9  1.8       0.0    56    11101   10 38 24

10 39 40  GRB          16 42 35  64.3 278.1  1.8       0.0   -24    11101   No stop 
10 42 10  ---          16 45 05  63.7 277.6  1.9       0.0   126    11120   10 39 44

10 42 10  VLA1         16 45 05  63.5 277.5  1.9       0.0   -24    11120   No stop 
10 43 30  ---          16 46 26  63.2 277.3  1.9       0.0    56    11130   10 42 14

10 43 30  GRB          16 46 26  63.4 277.4  1.9       0.0   -24    11130   No stop 
10 46 00  ---          16 48 56  62.8 277.0  1.9       0.0   126    11150   10 43 34

10 46 40  VLA2         16 49 36  61.9 277.6  2.0       0.0    14    11150   10 46 35
10 47 40  ---          16 50 36  61.7 277.5  2.0       0.0    60    11158   10 46 39

10 47 40  VLA1         16 50 36  62.2 276.6  2.0       0.0   -26    11158   No stop 
10 49 00  ---          16 51 56  61.9 276.4  2.0       0.0    54    11168   10 47 44

10 49 00  GRB          16 51 56  62.2 276.5  2.0       0.0   -24    11168   No stop 
10 51 30  ---          16 54 27  61.6 276.1  2.0       0.0   126    11188   10 49 04

10 51 30  VLA1         16 54 27  61.4 276.0  2.0       0.0   -24    11188   No stop 
10 52 50  ---          16 55 47  61.1 275.8  2.1       0.0    56    11198   10 51 34

10 52 50  GRB          16 55 47  61.3 275.9  2.0       0.0   -24    11198   No stop 
10 55 20  ---          16 58 17  60.7 275.5  2.1       0.0   126    11217   10 52 54

10 55 20  VLA1         16 58 17  60.5 275.4  2.1       0.0   -24    11217   No stop 
10 56 40  ---          16 59 38  60.2 275.2  2.1       0.0    56    11228   10 55 24

10 56 40  GRB          16 59 38  60.4 275.3  2.1       0.0   -24    11228   No stop 
10 59 10  ---          17 02 08  59.9 275.0  2.1       0.0   126    11247   10 56 44
Schedule for HART      (Code Hh )                                   Page  21
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

10 59 10  VLA1         17 02 08  59.6 274.9  2.2       0.0   -24    11247   No stop 
11 00 30  ---          17 03 28  59.3 274.7  2.2       0.0    56    11257   10 59 14

11 00 30  GRB          17 03 28  59.6 274.8  2.2       0.0   -24    11257   No stop 
11 03 00  ---          17 05 59  59.0 274.4  2.2       0.0   126    11277   11 00 34

11 03 40  VLA2         17 06 39  58.1 275.0  2.3       0.0    14    11277   11 03 35
11 04 40  ---          17 07 39  57.9 274.9  2.3       0.0    60    11285   11 03 39

11 04 40  VLA1         17 07 39  58.4 274.1  2.2       0.0   -26    11285   No stop 
11 06 00  ---          17 08 59  58.1 273.9  2.3       0.0    54    11295   11 04 44

11 06 00  GRB          17 08 59  58.4 274.0  2.3       0.0   -24    11295   No stop 
11 08 30  ---          17 11 30  57.8 273.7  2.3       0.0   126    11315   11 06 04

11 08 30  VLA1         17 11 30  57.5 273.6  2.3       0.0   -24    11315   No stop 
11 09 50  ---          17 12 50  57.2 273.4  2.3       0.0    56    11325   11 08 34

11 09 50  GRB          17 12 50  57.5 273.5  2.3       0.0   -24    11325   No stop 
11 12 20  ---          17 15 20  56.9 273.2  2.4       0.0   126    11344   11 09 54

11 12 20  VLA1         17 15 20  56.7 273.1  2.4       0.0   -24    11344   No stop 
11 13 40  ---          17 16 41  56.4 272.9  2.4       0.0    56    11355   11 12 24

11 13 40  GRB          17 16 41  56.6 273.0  2.4       0.0   -24    11355   No stop 
11 16 10  ---          17 19 11  56.1 272.7  2.4       0.0   126    11374   11 13 44

11 16 10  VLA1         17 19 11  55.8 272.6  2.4       0.0   -24    11374   No stop 
11 17 30  ---          17 20 31  55.5 272.4  2.5       0.0    56    11384   11 16 14

11 17 30  GRB          17 20 31  55.8 272.5  2.4       0.0   -24    11384   No stop 
11 20 00  ---          17 23 02  55.2 272.2  2.5       0.0   126    11404   11 17 34

11 20 30  J1459-1810   17 23 32  56.0 275.6  2.4       0.0     1    11404   11 20 25
11 21 30  =1456-179    17 24 32  55.8 275.5  2.4       0.0    60    11412   11 20 29

11 21 30  J1455-1700   17 24 32  54.4 276.8  2.5       0.0   -28    11412   No stop 
11 23 00  =1452-168    17 26 02  54.1 276.6  2.5       0.0    62    11424   11 21 34

11 23 00  J1459-1810   17 26 02  55.5 275.3  2.4       0.0   -28    11424   No stop 
11 24 30  =1456-179    17 27 32  55.1 275.1  2.5       0.0    62    11435   11 23 04

11 24 30  J1455-1700   17 27 32  53.7 276.3  2.5       0.0   -28    11435   No stop 
11 26 00  =1452-168    17 29 03  53.4 276.1  2.6       0.0    62    11447   11 24 34
Schedule for HART      (Code Hh )                                   Page  22
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

11 26 00  J1459-1810   17 29 03  54.8 274.9  2.5       0.0   -28    11447   No stop 
11 27 30  =1456-179    17 30 33  54.4 274.7  2.5       0.0    62    11459   11 26 04

11 28 10  VLA2         17 31 13  52.6 271.9  2.7       0.0     9    11459   11 28 05
11 29 10  ---          17 32 13  52.3 271.8  2.7       0.0    60    11467   11 28 09

11 29 10  VLA1         17 32 13  52.9 271.1  2.7       0.0   -26    11467   No stop 
11 30 30  ---          17 33 33  52.6 270.9  2.7       0.0    54    11477   11 29 14

11 30 30  GRB          17 33 33  52.8 271.0  2.7       0.0   -24    11477   No stop 
11 33 00  ---          17 36 04  52.3 270.7  2.7       0.0   126    11497   11 30 34

11 33 00  VLA1         17 36 04  52.0 270.6  2.7       0.0   -24    11497   No stop 
11 34 20  ---          17 37 24  51.7 270.5  2.7       0.0    56    11507   11 33 04

11 34 20  GRB          17 37 24  52.0 270.6  2.7       0.0   -24    11507   No stop 
11 36 50  ---          17 39 54  51.4 270.3  2.8       0.0   126    11526   11 34 24

11 36 50  VLA1         17 39 54  51.2 270.2  2.8       0.0   -24    11526   No stop 
11 38 10  ---          17 41 15  50.9 270.0  2.8       0.0    56    11537   11 36 54

11 38 10  GRB          17 41 15  51.1 270.1  2.8       0.0   -24    11537   No stop 
11 40 40  ---          17 43 45  50.5 269.9  2.8       0.0   126    11556   11 38 14

11 40 40  VLA1         17 43 45  50.3 269.8  2.9       0.0   -24    11556   No stop 
11 42 00  ---          17 45 05  50.0 269.6  2.9       0.0    56    11566   11 40 44

11 42 00  GRB          17 45 05  50.2 269.7  2.9       0.0   -24    11566   No stop 
11 44 30  ---          17 47 36  49.7 269.4  2.9       0.0   126    11586   11 42 04

11 45 10  VLA2         17 48 16  48.7 269.9  3.0       0.0    14    11586   11 45 05
11 46 10  ---          17 49 16  48.5 269.8  3.0       0.0    60    11594   11 45 09

11 46 10  VLA1         17 49 16  49.1 269.2  2.9       0.0   -26    11594   No stop 
11 47 30  ---          17 50 36  48.8 269.0  3.0       0.0    54    11604   11 46 14

11 47 30  GRB          17 50 36  49.0 269.1  2.9       0.0   -24    11604   No stop 
11 50 00  ---          17 53 06  48.4 268.9  3.0       0.0   126    11624   11 47 34

11 50 00  VLA1         17 53 06  48.2 268.8  3.0       0.0   -24    11624   No stop 
11 51 20  ---          17 54 27  47.9 268.6  3.0       0.0    56    11634   11 50 04

11 51 20  GRB          17 54 27  48.1 268.7  3.0       0.0   -24    11634   No stop 
11 53 50  ---          17 56 57  47.6 268.5  3.1       0.0   126    11653   11 51 24
Schedule for HART      (Code Hh )                                   Page  23
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

11 53 50  VLA1         17 56 57  47.3 268.4  3.1       0.0   -24    11653   No stop 
11 55 10  ---          17 58 17  47.0 268.3  3.1       0.0    56    11664   11 53 54

11 55 10  GRB          17 58 17  47.3 268.3  3.1       0.0   -24    11664   No stop 
11 57 40  ---          18 00 48  46.7 268.1  3.1       0.0   126    11683   11 55 14

11 57 40  VLA1         18 00 48  46.5 268.0  3.1       0.0   -24    11683   No stop 
11 59 00  ---          18 02 08  46.2 267.9  3.2       0.0    56    11693   11 57 44

11 59 00  GRB          18 02 08  46.4 267.9  3.1       0.0   -24    11693   No stop 
12 01 30  ---          18 04 38  45.8 267.7  3.2       0.0   126    11713   11 59 04

12 02 10  VLA2         18 05 18  44.9 268.1  3.2       0.0    14    11713   12 02 05
12 03 10  ---          18 06 19  44.7 268.0  3.3       0.0    60    11721   12 02 09

12 03 10  VLA1         18 06 19  45.2 267.4  3.2       0.0   -26    11721   No stop 
12 04 30  ---          18 07 39  44.9 267.3  3.2       0.0    54    11732   12 03 14

12 04 30  GRB          18 07 39  45.2 267.4  3.2       0.0   -24    11732   No stop 
12 07 00  ---          18 10 09  44.6 267.1  3.3       0.0   126    11751   12 04 34

12 07 00  VLA1         18 10 09  44.4 267.1  3.3       0.0   -24    11751   No stop 
12 08 20  ---          18 11 29  44.1 266.9  3.3       0.0    56    11761   12 07 04

12 08 20  GRB          18 11 29  44.3 267.0  3.3       0.0   -24    11761   No stop 
12 10 50  ---          18 14 00  43.7 266.8  3.3       0.0   126    11781   12 08 24

12 10 50  VLA1         18 14 00  43.5 266.7  3.4       0.0   -24    11781   No stop 
12 12 10  ---          18 15 20  43.2 266.6  3.4       0.0    56    11791   12 10 54

12 12 10  GRB          18 15 20  43.4 266.6  3.4       0.0   -24    11791   No stop 
12 14 40  ---          18 17 51  42.9 266.4  3.4       0.0   126    11810   12 12 14

12 14 40  VLA1         18 17 51  42.6 266.3  3.4       0.0   -24    11810   No stop 
12 16 00  ---          18 19 11  42.3 266.2  3.4       0.0    56    11821   12 14 44

12 16 00  GRB          18 19 11  42.6 266.3  3.4       0.0   -24    11821   No stop 
12 18 30  ---          18 21 41  42.0 266.0  3.5       0.0   126    11840   12 16 04

12 19 10  VLA2         18 22 21  41.1 266.4  3.5       0.0    14    11840   12 19 05
12 20 10  ---          18 23 21  40.9 266.4  3.5       0.0    60    11848   12 19 09

12 20 10  VLA1         18 23 21  41.4 265.8  3.5       0.0   -26    11848   No stop 
12 21 30  ---          18 24 42  41.1 265.7  3.5       0.0    54    11859   12 20 14
Schedule for HART      (Code Hh )                                   Page  24
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

12 21 30  GRB          18 24 42  41.3 265.7  3.5       0.0   -24    11859   No stop 
12 24 00  ---          18 27 12  40.8 265.5  3.6       0.0   126    11878   12 21 34

12 24 00  VLA1         18 27 12  40.5 265.4  3.6       0.0   -24    11878   No stop 
12 25 20  ---          18 28 32  40.2 265.3  3.6       0.0    56    11888   12 24 04

12 25 20  GRB          18 28 32  40.5 265.4  3.6       0.0   -24    11888   No stop 
12 27 50  ---          18 31 03  39.9 265.2  3.6       0.0   126    11908   12 25 24

12 27 50  VLA1         18 31 03  39.7 265.1  3.6       0.0   -24    11908   No stop 
12 29 10  ---          18 32 23  39.4 265.0  3.7       0.0    56    11918   12 27 54

12 29 10  GRB          18 32 23  39.6 265.0  3.6       0.0   -24    11918   No stop 
12 31 40  ---          18 34 53  39.1 264.8  3.7       0.0   126    11937   12 29 14

12 31 40  VLA1         18 34 53  38.8 264.7  3.7       0.0   -24    11937   No stop 
12 33 00  ---          18 36 14  38.5 264.6  3.7       0.0    56    11948   12 31 44

12 33 00  GRB          18 36 14  38.8 264.7  3.7       0.0   -24    11948   No stop 
12 35 30  ---          18 38 44  38.2 264.4  3.7       0.0   126    11967   12 33 04

12 37 30  1510-089     18 40 44  38.2 279.0  3.5       0.0    72    11967   12 37 25
12 47 30  ---          18 50 46  36.0 277.7  3.6       0.0   600    12045   12 37 29

13 01 30  1730-130     19 04 48  65.1 296.6  1.5       0.0   743    12045   13 01 25
13 14 30  ---          19 17 50  62.4 292.7  1.7       0.0   780    12146   13 01 29

13 15 10  1730-130     19 18 30  62.3 292.5  1.7       0.0    19    12146   13 15 05
13 29 30  ---          19 32 53  59.2 288.9  2.0       0.0   860    12258   13 15 09

13 30 10  1730-130     19 33 33  59.1 288.7  2.0       0.0    19    12258   13 30 05
13 44 30  ---          19 47 55  56.0 285.6  2.2       0.0   860    12370   13 30 09

13 45 10  1730-130     19 48 35  55.9 285.5  2.2       0.0    19    12370   13 45 05
13 59 30  ---          20 02 58  52.7 282.8  2.5       0.0   860    12481   13 45 09

14 00 10  1730-130     20 03 38  52.6 282.7  2.5       0.0    19    12481   14 00 05
14 14 30  ---          20 18 00  49.4 280.4  2.7       0.0   860    12593   14 00 09

14 15 10  1730-130     20 18 40  49.3 280.2  2.7       0.0    19    12593   14 15 05
14 29 30  ---          20 33 03  46.1 278.1  3.0       0.0   860    12704   14 15 09

14 30 10  1730-130     20 33 43  45.9 278.0  3.0       0.0    19    12704   14 30 05
14 44 30  ---          20 48 05  42.7 276.1  3.2       0.0   860    12816   14 30 09
Schedule for HART      (Code Hh )                                   Page  25
               e-EVN runs ET017A (Tudose), RP018B (Paragi)
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Thu  24 Nov 2011   Day 328 ---

14 45 10  1730-130     20 48 45  42.6 276.0  3.3       0.0    19    12816   14 45 05
14 59 30  ---          21 03 08  39.4 274.2  3.5       0.0   860    12928   14 45 09

15 01 30  3C454.3      21 05 08  40.2  35.3 -1.8       0.0   -66    12928   15 01 25
15 14 30  ---          21 18 10  41.8  31.7 -1.6       0.0   714    13029   15 01 29

15 15 10  3C454.3      21 18 50  41.9  31.5 -1.6       0.0    19    13029   15 15 05
15 29 30  ---          21 33 13  43.5  27.4 -1.4       0.0   860    13140   15 15 09

15 30 10  3C454.3      21 33 53  43.5  27.2 -1.3       0.0    19    13140   15 30 05
15 44 30  ---          21 48 15  44.9  22.8 -1.1       0.0   860    13252   15 30 09

15 45 10  3C454.3      21 48 55  45.0  22.5 -1.1       0.0    19    13252   15 45 05
15 59 30  ---          22 03 17  46.1  17.9 -0.9       0.0   860    13364   15 45 09

16 00 10  3C454.3      22 03 58  46.1  17.7 -0.8       0.0    19    13364   16 00 05
16 14 30  ---          22 18 20  47.0  12.8 -0.6       0.0   860    13475   16 00 09

16 15 10  3C454.3      22 19 00  47.0  12.6 -0.6       0.0    19    13475   16 15 05
16 29 30  ---          22 33 22  47.6   7.6 -0.4       0.0   860    13587   16 15 09

16 30 10  3C454.3      22 34 02  47.6   7.3 -0.3       0.0    19    13587   16 30 05
16 44 30  ---          22 48 25  47.9   2.2 -0.1       0.0   860    13698   16 30 09

16 45 10  3C454.3      22 49 05  47.9   2.0 -0.1       0.0    19    13698   16 45 05
16 59 30  ---          23 03 27  47.8 356.8  0.1       0.0   860    13810   16 45 09


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 Setup file: 1024Mbps
   Matching groups in /aps3/sched9.4/catalogs/freq.dat:
     hh6cm           Values confirmed by E-mail Jonathan Quick 221105 (CR)

   Setup group:    7         Station: HART              Total bit rate: 1024
   Format: MKIV1:2           Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type:                  Speedup factor:   0.50

   Disk used to record data.

   1st LO=   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00
             4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00   4600.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         2         1         2         1         4         3         4         3
                   6         5         6         5         8         7         8         7
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        2N        1N        2N        1N        2N        1N        2N        1N
                  2N        1N        2N        1N        2N        1N        2N        1N

  The following frequency sets based on this setup were used.

   Frequency Set:   8  Setup file default.
   LO sum=    4942.49   4942.49   4942.49   4942.49   4974.49   4974.49   4974.49   4974.49
              5006.49   5006.49   5006.49   5006.49   5038.49   5038.49   5038.49   5038.49
   BBC fr=     342.49    342.49    342.49    342.49    374.49    374.49    374.49    374.49
               406.49    406.49    406.49    406.49    438.49    438.49    438.49    438.49
   Bandwd=     16.000    16.000    16.000    16.000    16.000    16.000    16.000    16.000
               16.000    16.000    16.000    16.000    16.000    16.000    16.000    16.000

   Track assignments are: 
    track1=   2, 10, 18, 26,  3, 11, 19, 27, 66, 74, 82, 90, 67, 75, 83, 91
    barrel=roll_off 
 SOURCES USED IN RECORDING SCANS --                         e-EVN runs ET017A (Tudose), RP018B (Paragi)
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * GRB               14 50 17.768349   * 14 53 07.780000     14 53 47.989180       0.00
                    -19 31 58.36085    *-19 44 12.20000     -19 47 02.03109        0.00
                     From catalog imbedded in main SCHED input file.
                        2.333 scan and     58.129 baseline hours in setup: 1024Mbps

 * VLA1              14 49 13.666318   * 14 52 03.580000     14 52 43.768034       0.00
                    -19 30 50.98452    *-19 43 08.00000     -19 45 58.59307        0.00
                     From catalog imbedded in main SCHED input file.
                        1.244 scan and     27.399 baseline hours in setup: 1024Mbps

 * VLA2              14 47 35.689885   * 14 50 24.980000     14 51 05.022140       0.00
                    -18 56 53.35178    *-19 09 15.20000     -19 12 07.00666        0.00
                     From catalog imbedded in main SCHED input file.
                        0.233 scan and      6.533 baseline hours in setup: 1024Mbps

 * AQLX-1            19 08 42.826333   * 19 11 16.010000     19 11 52.385865       0.00
                     00 30 05.36497    * 00 35 06.70000      00 36 28.37084        0.00
                     From catalog imbedded in main SCHED input file.
                        4.350 scan and    112.210 baseline hours in setup: 1024Mbps

   J0137+3309        01 34 49.826433   * 01 37 41.299499     01 38 24.592769       0.59
   0134+329          32 54 20.25963    * 33 09 35.13381      33 13 26.75784        0.57
 * 3C48              /aps3/sched9.4/catalogs/sources.vlba
   J0137+33          GSFC 2010a astro solution        99 Observations
                        0.217 scan and      5.609 baseline hours in setup: 1024Mbps

   J0237+2848        02 34 55.589590   * 02 37 52.405677     02 38 37.113404       0.01
 * 0234+285          28 35 11.40778    * 28 48 08.99003      28 51 23.20724        0.01
   J0237+28          /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution     53368 Observations
                        4.755 scan and    133.148 baseline hours in setup: 1024Mbps

   J0319+4130        03 16 29.567258   * 03 19 48.160088     03 20 38.592961       1.66
   0316+413          41 19 51.91695    * 41 30 42.10408      41 33 23.11498        2.78
 * 3C84              /aps3/sched9.4/catalogs/sources.vlba
   J0319+41          GSFC 2010a astro solution     10264 Observations
                        0.456 scan and     12.756 baseline hours in setup: 1024Mbps

   J0555+3948        05 52 01.407170   * 05 55 30.805612     05 56 23.485208       0.01
   0552+398          39 48 21.94583    * 39 48 49.16498      39 48 48.29205        0.01
 * DA193             /aps3/sched9.4/catalogs/sources.vlba
   J0555+39          GSFC 2010a astro solution    355917 Observations
                        2.844 scan and     75.287 baseline hours in setup: 1024Mbps

   J1159+2914        11 56 57.786210   * 11 59 31.833911     12 00 08.549262       0.01
 * 1156+295          29 31 25.73877    * 29 14 43.82687      29 10 33.98548        0.01
   J1159+29          /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution     52025 Observations
                        3.800 scan and    103.655 baseline hours in setup: 1024Mbps

   J1229+0203        12 26 33.245835   * 12 29 06.699731     12 29 43.362336       1.04
   3C273             02 19 43.30577    * 02 03 08.59827      01 59 09.89181        1.33
 * 3C273B            /aps3/sched9.4/catalogs/sources.vlba
   1226+023          GSFC 2010a astro solution     32199 Observations
   J1229+02             0.456 scan and     12.729 baseline hours in setup: 1024Mbps

   J1256-0547        12 53 35.831298   * 12 56 11.166566     12 56 48.199564       0.78
 * 3C279            -05 31 07.99587    *-05 47 21.52473     -05 51 12.41328        0.94
   1253-055          /aps3/sched9.4/catalogs/sources.vlba
   J1256-05          GSFC 2010a astro solution      7575 Observations
                        0.472 scan and     13.222 baseline hours in setup: 1024Mbps

   J1331+3030        13 28 49.657759   * 13 31 08.288051     13 31 40.774557       0.19
 * 3C286             30 45 58.64061    * 30 30 32.95925      30 26 45.44745        0.17
   1328+307          /aps3/sched9.4/catalogs/sources.vlba
   J1331+30          GSFC 2010a astro solution       276 Observations
                        0.167 scan and      3.271 baseline hours in setup: 1024Mbps

 * J1445-1629        14 43 06.684431   * 14 45 53.376282     14 46 32.803919       0.06
   1443-162         -16 16 26.68214    *-16 29 01.61893     -16 31 56.85585        0.05
   J1445-16          /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution       533 Observations
                        0.100 scan and      2.800 baseline hours in setup: 1024Mbps

 * J1448-1620        14 45 28.330580   * 14 48 15.054143     14 48 54.483892       0.06
   1445-161         -16 07 56.44328    *-16 20 24.54884     -16 23 18.15549        0.10
   J1448-16          /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution       444 Observations
                        0.100 scan and      2.800 baseline hours in setup: 1024Mbps

 * J1455-1700        14 52 15.080661   * 14 55 02.810640     14 55 42.467632       0.99
   1452-168         -16 48 05.92052    *-17 00 13.95326     -17 03 02.65740        1.63
                     /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution        38 Observations
                        0.150 scan and      3.180 baseline hours in setup: 1024Mbps

 * J1459-1810        14 56 39.692733   * 14 59 28.763115     15 00 08.733033       0.48
   1456-179         -17 58 50.56915    *-18 10 45.18560     -18 13 30.55478        1.03
                     /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution        40 Observations
                        0.200 scan and      4.578 baseline hours in setup: 1024Mbps

   J1512-0905        15 10 08.900177   * 15 12 50.532925     15 13 28.678139       0.01
 * 1510-089         -08 54 47.61946    *-09 05 59.82961     -09 08 35.75196        0.03
   J1512-09          /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution      5275 Observations
                        0.167 scan and      4.667 baseline hours in setup: 1024Mbps

   J1642+3948        16 41 17.606228   * 16 42 58.809965     16 43 21.693370       0.81
 * 3C345             39 54 10.81494    * 39 48 36.99400      39 47 23.77547        0.54
   1641+399          /aps3/sched9.4/catalogs/sources.vlba
   J1642+39          GSFC 2010a astro solution     52595 Observations
                        1.683 scan and     47.133 baseline hours in setup: 1024Mbps

   J1733-1304        17 30 13.535186   * 17 33 02.705784     17 33 42.666823       0.01
 * 1730-130         -13 02 45.83971    *-13 04 49.54819     -13 05 13.02040        0.02
   J1733-13          /aps3/sched9.4/catalogs/sources.vlba
   NRAO530           GSFC 2010a astro solution     16041 Observations
                        1.889 scan and     52.081 baseline hours in setup: 1024Mbps

   J1751+0939        17 49 10.387930   * 17 51 32.818573     17 52 06.300643       0.00
 * 1749+096          09 39 42.82591    * 09 39 00.72846      09 38 59.93666        0.01
   J1751+09          /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution    121343 Observations
                        0.333 scan and      9.333 baseline hours in setup: 1024Mbps

 * J1907+0127        19 04 39.788505   * 19 07 11.996263     19 07 48.118950       0.73
   1904+013          01 22 24.60117    * 01 27 08.96316      01 28 26.71515        0.91
                     /aps3/sched9.4/catalogs/sources.vlba
                     GSFC 2010a astro solution        38 Observations
                        1.611 scan and     44.045 baseline hours in setup: 1024Mbps

   J2253+1608        22 51 29.519738   * 22 53 57.747937     22 54 34.213611       0.76
 * 3C454.3           15 52 54.34811    * 16 08 53.56094      16 12 58.12289        0.74
   2251+158          /aps3/sched9.4/catalogs/sources.vlba
   J2253+16          GSFC 2010a astro solution     39550 Observations
                        2.106 scan and     57.254 baseline hours in setup: 1024Mbps



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   GRB                 14.9
   VLA1                15.1
   VLA2                15.6
   AQLX-1              52.1
   3C48               146.7
   0234+285           160.3
   3C84               157.5
   DA193              148.0
   1156+295            75.6
   3C273B              55.5
   3C279               46.1
   3C286               61.7
   J1445-1629          17.2
   J1448-1620          16.7
   J1455-1700          14.9
   J1459-1810          13.6
   1510-089            15.4
   3C345               61.2
   1730-130            24.2
   1749+096            41.3
   J1907+0127          51.6
   3C454.3            108.7

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

