  COVER INFORMATION 

 Station:    SHANGHAI  (Code Sh ) 
 Experiment: Arp 299-A at 1 Gb/s
 Exp. Code:  EP087D  


Schedule Version:       2.00
Processed by SCHED version:  10.20  Release of about July 12, 2012

PI:       Miguel A. Perez-Torres

Address:  IAA - CSIC
          Glorieta de la Astronomia s/n
          18008 Granada, Spain
 

Phone:    +34-665252538
EMAIL:    torres@iaa.es
Fax:
Phone during observation: +34-665252538

Observing mode: 1024 Mbps

Notes:    Phase-ref of Arp 299 with the full EVN
          Eleventh epoch obs-ns at 6cm; seventh with the full EVN
 
 

Schedule for SHANGHAI  (Code Sh )                                   Page   2
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

 Next scan frequencies:  4942.49  4942.49  4942.49  4942.49  4974.49  4974.49  4974.49  4974.49
                         5006.49  5006.49  5006.49  5006.49  5038.49  5038.49  5038.49  5038.49
 Next BBC frequencies:    742.49   742.49   742.49   742.49   774.49   774.49   774.49   774.49
                          806.49   806.49   806.49   806.49   838.49   838.49   838.49   838.49
 Next scan bandwidths:     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
                           16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00

03 30 00  4C39.25      13 41 40  38.5 -62.7  4.2      78.1     0        0   03 30 00
03 33 00  ---          13 44 40  37.9 -62.5  4.3      77.8   180       23   03 30 01

03 33 00  4C39.25      13 44 40  37.9 -62.5  4.3      77.8    -2       23   No stop 
03 35 00  ---          13 46 41  37.5 -62.4  4.3      77.5   118       39   03 33 01

03 43 00  J1128+5925   13 54 42  52.7 -30.0  2.4     122.9   443       39   03 43 00
03 43 30  ---          13 55 12  52.7 -30.1  2.4     122.8    30       43   03 43 01

03 43 30  ARP299       13 55 12  53.2 -31.2  2.4     121.9    -5       43   No stop 
03 47 20  ---          13 59 03  52.7 -31.6  2.5     120.7   225       72   03 43 31

03 47 20  J1128+5925   13 59 03  52.2 -30.5  2.5     121.6    -5       72   No stop 
03 48 20  ---          14 00 03  52.1 -30.6  2.5     121.3    55       80   03 47 21

03 48 20  ARP299       14 00 03  52.6 -31.8  2.5     120.4    -5       80   No stop 
03 52 20  ---          14 04 04  52.2 -32.2  2.6     119.3   235      111   03 48 21

03 53 00  J1128+5925   14 04 44  51.6 -31.1  2.6     119.9    35      111   03 53 00
03 53 30  ---          14 05 14  51.6 -31.1  2.6     119.8    30      115   03 53 01

03 53 30  ARP299       14 05 14  52.0 -32.3  2.6     118.9    -5      115   No stop 
03 57 30  ---          14 09 14  51.6 -32.7  2.7     117.7   235      146   03 53 31

03 57 30  J1128+5925   14 09 14  51.1 -31.5  2.7     118.6    -5      146   No stop 
03 58 30  ---          14 10 15  51.0 -31.6  2.7     118.3    55      154   03 57 31

03 58 30  ARP299       14 10 15  51.4 -32.8  2.7     117.4    -5      154   No stop 
04 02 30  ---          14 14 15  51.0 -33.2  2.7     116.3   235      185   03 58 31

04 02 30  J1128+5925   14 14 15  50.6 -32.0  2.8     117.1    -5      185   No stop 
04 03 30  ---          14 15 15  50.4 -32.1  2.8     116.9    55      192   04 02 31

04 03 30  ARP299       14 15 15  50.9 -33.3  2.8     116.0    -5      192   No stop 
04 07 30  ---          14 19 16  50.4 -33.6  2.8     114.9   235      223   04 03 31

04 08 10  J1128+5925   14 19 56  49.9 -32.5  2.8     115.5    35      223   04 08 10
04 08 40  ---          14 20 26  49.8 -32.5  2.9     115.4    30      227   04 08 11
Schedule for SHANGHAI  (Code Sh )                                   Page   3
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

04 08 40  ARP299       14 20 26  50.2 -33.7  2.9     114.6    -5      227   No stop 
04 12 40  ---          14 24 27  49.8 -34.1  2.9     113.4   235      258   04 08 41

04 12 40  J1128+5925   14 24 27  49.4 -32.9  2.9     114.3    -5      258   No stop 
04 13 40  ---          14 25 27  49.3 -33.0  2.9     114.0    55      266   04 12 41

04 13 40  ARP299       14 25 27  49.7 -34.1  2.9     113.2    -5      266   No stop 
04 17 40  ---          14 29 28  49.2 -34.5  3.0     112.1   235      297   04 13 41

04 17 40  J1128+5925   14 29 28  48.8 -33.3  3.0     112.9    -5      297   No stop 
04 18 40  ---          14 30 28  48.7 -33.3  3.0     112.6    55      304   04 17 41

04 18 40  ARP299       14 30 28  49.0 -34.5  3.0     111.8    -5      304   No stop 
04 22 40  ---          14 34 29  48.6 -34.8  3.1     110.7   235      335   04 18 41

04 23 20  J1128+5925   14 35 09  48.1 -33.7  3.1     111.4    35      335   04 23 20
04 23 50  ---          14 35 39  48.1 -33.7  3.1     111.2    30      339   04 23 21

04 23 50  ARP299       14 35 39  48.4 -34.9  3.1     110.4    -5      339   No stop 
04 27 50  ---          14 39 39  47.9 -35.2  3.2     109.4   235      370   04 23 51

04 27 50  J1128+5925   14 39 39  47.6 -34.0  3.2     110.2    -5      370   No stop 
04 28 50  ---          14 40 40  47.5 -34.0  3.2     109.9    55      378   04 27 51

04 28 50  ARP299       14 40 40  47.8 -35.2  3.2     109.1    -5      378   No stop 
04 32 50  ---          14 44 40  47.3 -35.5  3.3     108.1   235      409   04 28 51

04 32 50  J1128+5925   14 44 40  47.0 -34.3  3.3     108.9    -5      409   No stop 
04 33 50  ---          14 45 40  46.9 -34.4  3.3     108.6    55      417   04 32 51

04 33 50  ARP299       14 45 40  47.2 -35.5  3.3     107.8    -5      417   No stop 
04 37 50  ---          14 49 41  46.7 -35.8  3.3     106.8   235      448   04 33 51

04 38 30  J1128+5925   14 50 21  46.3 -34.6  3.4     107.4    35      448   04 38 30
04 39 00  ---          14 50 51  46.2 -34.7  3.4     107.3    30      452   04 38 31

04 39 00  ARP299       14 50 51  46.5 -35.8  3.4     106.5    -5      452   No stop 
04 43 00  ---          14 54 52  46.0 -36.0  3.4     105.5   235      483   04 39 01

04 43 00  J1128+5925   14 54 52  45.7 -34.9  3.4     106.3    -5      483   No stop 
04 44 00  ---          14 55 52  45.6 -34.9  3.4     106.0    55      490   04 43 01

04 44 00  ARP299       14 55 52  45.9 -36.1  3.4     105.2    -5      490   No stop 
04 48 00  ---          14 59 53  45.4 -36.3  3.5     104.3   235      521   04 44 01
Schedule for SHANGHAI  (Code Sh )                                   Page   4
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

04 48 00  J1128+5925   14 59 53  45.1 -35.1  3.5     105.0    -5      521   No stop 
04 49 00  ---          15 00 53  45.0 -35.2  3.5     104.8    55      529   04 48 01

04 49 00  ARP299       15 00 53  45.3 -36.3  3.5     104.0    -5      529   No stop 
04 53 00  ---          15 04 54  44.8 -36.5  3.6     103.0   235      560   04 49 01

04 53 40  J1128+5925   15 05 34  44.4 -35.4  3.6     103.6    35      560   04 53 40
04 54 10  ---          15 06 04  44.4 -35.4  3.6     103.5    30      564   04 53 41

04 54 10  ARP299       15 06 04  44.6 -36.5  3.6     102.7    -5      564   No stop 
04 58 10  ---          15 10 04  44.1 -36.7  3.7     101.8   235      595   04 54 11

04 58 10  J1128+5925   15 10 04  43.9 -35.5  3.7     102.5    -5      595   No stop 
04 59 10  ---          15 11 05  43.7 -35.6  3.7     102.3    55      603   04 58 11

04 59 10  ARP299       15 11 05  44.0 -36.7  3.7     101.5    -5      603   No stop 
05 03 10  ---          15 15 05  43.5 -36.9  3.8     100.6   235      634   04 59 11

05 03 10  J1128+5925   15 15 05  43.2 -35.7  3.8     101.3    -5      634   No stop 
05 04 10  ---          15 16 05  43.1 -35.8  3.8     101.1    55      641   05 03 11

05 04 10  ARP299       15 16 05  43.3 -36.9  3.8     100.4    -5      641   No stop 
05 08 10  ---          15 20 06  42.8 -37.0  3.8      99.4   235      672   05 04 11

05 08 50  J1128+5925   15 20 46  42.5 -35.9  3.9     100.0    35      672   05 08 50
05 09 20  ---          15 21 16  42.5 -35.9  3.9      99.8    30      676   05 08 51

05 09 20  ARP299       15 21 16  42.7 -37.1  3.9      99.1    -5      676   No stop 
05 13 20  ---          15 25 17  42.1 -37.2  3.9      98.2   235      707   05 09 21

05 13 20  J1128+5925   15 25 17  42.0 -36.0  3.9      98.9    -5      707   No stop 
05 14 20  ---          15 26 17  41.8 -36.1  4.0      98.7    55      715   05 13 21

05 14 20  ARP299       15 26 17  42.0 -37.2  3.9      98.0    -5      715   No stop 
05 18 20  ---          15 30 18  41.5 -37.3  4.0      97.1   235      746   05 14 21

05 18 20  J1128+5925   15 30 18  41.3 -36.2  4.0      97.7    -5      746   No stop 
05 19 20  ---          15 31 18  41.2 -36.2  4.0      97.5    55      754   05 18 21

05 19 20  ARP299       15 31 18  41.4 -37.3  4.0      96.8    -5      754   No stop 
05 23 20  ---          15 35 19  40.8 -37.4  4.1      95.9   235      784   05 19 21

05 24 00  J1128+5925   15 35 59  40.6 -36.3  4.1      96.4    35      784   05 24 00
05 24 30  ---          15 36 29  40.6 -36.3  4.1      96.3    30      788   05 24 01
Schedule for SHANGHAI  (Code Sh )                                   Page   5
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

05 24 30  ARP299       15 36 29  40.7 -37.4  4.1      95.7    -5      788   No stop 
05 28 30  ---          15 40 29  40.2 -37.5  4.2      94.8   235      819   05 24 31

05 28 30  J1128+5925   15 40 29  40.0 -36.4  4.2      95.4    -5      819   No stop 
05 29 30  ---          15 41 30  39.9 -36.4  4.2      95.2    55      827   05 28 31

05 29 30  ARP299       15 41 30  40.0 -37.5  4.2      94.6    -5      827   No stop 
05 33 30  ---          15 45 30  39.5 -37.5  4.3      93.7   235      858   05 29 31

05 33 30  J1128+5925   15 45 30  39.4 -36.4  4.3      94.3    -5      858   No stop 
05 34 30  ---          15 46 30  39.3 -36.4  4.3      94.1    55      866   05 33 31

05 34 30  ARP299       15 46 30  39.4 -37.5  4.3      93.5    -5      866   No stop 
05 38 30  ---          15 50 31  38.9 -37.6  4.4      92.6   235      897   05 34 31

05 39 10  J1128+5925   15 51 11  38.7 -36.5  4.4      93.0    35      897   05 39 10
05 39 40  ---          15 51 41  38.6 -36.5  4.4      92.9    30      901   05 39 11

05 39 40  ARP299       15 51 41  38.7 -37.6  4.4      92.3    -5      901   No stop 
05 43 40  ---          15 55 42  38.2 -37.6  4.4      91.5   235      932   05 39 41

05 43 40  J1128+5925   15 55 42  38.1 -36.5  4.4      92.1    -5      932   No stop 
05 44 40  ---          15 56 42  38.0 -36.5  4.5      91.8    55      939   05 43 41

05 44 40  ARP299       15 56 42  38.0 -37.6  4.5      91.2    -5      939   No stop 
05 48 40  ---          16 00 43  37.5 -37.6  4.5      90.4   235      970   05 44 41

05 48 40  J1128+5925   16 00 43  37.5 -36.5  4.5      91.0    -5      970   No stop 
05 49 40  ---          16 01 43  37.3 -36.5  4.5      90.7    55      978   05 48 41

05 49 40  ARP299       16 01 43  37.4 -37.6  4.5      90.2    -5      978   No stop 
05 53 40  ---          16 05 44  36.9 -37.6  4.6      89.3   235     1009   05 49 41

05 54 20  J1128+5925   16 06 24  36.7 -36.5  4.6      89.7    35     1009   05 54 20
05 54 50  ---          16 06 54  36.7 -36.5  4.6      89.6    30     1013   05 54 21

05 54 50  ARP299       16 06 54  36.7 -37.6  4.6      89.1    -5     1013   No stop 
05 58 50  ---          16 10 54  36.2 -37.6  4.7      88.2   235     1044   05 54 51

05 58 50  J1128+5925   16 10 54  36.2 -36.5  4.7      88.8    -5     1044   No stop 
05 59 50  ---          16 11 55  36.0 -36.5  4.7      88.6    55     1052   05 58 51

05 59 50  ARP299       16 11 55  36.1 -37.6  4.7      88.0    -5     1052   No stop 
06 03 50  ---          16 15 55  35.5 -37.6  4.8      87.2   235     1083   05 59 51
Schedule for SHANGHAI  (Code Sh )                                   Page   6
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

06 03 50  J1128+5925   16 15 55  35.5 -36.5  4.8      87.7    -5     1083   No stop 
06 04 50  ---          16 16 55  35.4 -36.5  4.8      87.5    55     1090   06 03 51

06 04 50  ARP299       16 16 55  35.4 -37.6  4.8      87.0    -5     1090   No stop 
06 08 50  ---          16 20 56  34.9 -37.5  4.9      86.1   235     1121   06 04 51

06 09 30  J1128+5925   16 21 36  34.8 -36.5  4.9      86.5    35     1121   06 09 30
06 10 00  ---          16 22 06  34.7 -36.5  4.9      86.4    30     1125   06 09 31

06 10 00  ARP299       16 22 06  34.7 -37.5  4.9      85.9    -5     1125   No stop 
06 14 00  ---          16 26 07  34.2 -37.5  4.9      85.1   235     1156   06 10 01

06 14 00  J1128+5925   16 26 07  34.2 -36.4  5.0      85.6    -5     1156   No stop 
06 15 00  ---          16 27 07  34.1 -36.4  5.0      85.4    55     1164   06 14 01

06 15 00  ARP299       16 27 07  34.1 -37.4  5.0      84.8    -5     1164   No stop 
06 19 00  ---          16 31 08  33.6 -37.4  5.0      84.0   235     1195   06 15 01

06 19 00  J1128+5925   16 31 08  33.6 -36.4  5.0      84.5    -5     1195   No stop 
06 20 00  ---          16 32 08  33.5 -36.3  5.1      84.3    55     1203   06 19 01

06 20 00  ARP299       16 32 08  33.4 -37.4  5.0      83.8    -5     1203   No stop 
06 24 00  ---          16 36 09  32.9 -37.3  5.1      83.0   235     1233   06 20 01

06 24 40  J1128+5925   16 36 49  32.9 -36.3  5.1      83.4    35     1233   06 24 40
06 25 10  ---          16 37 19  32.8 -36.3  5.1      83.3    30     1237   06 24 41

06 25 10  ARP299       16 37 19  32.8 -37.3  5.1      82.8    -5     1237   No stop 
06 29 10  ---          16 41 19  32.2 -37.2  5.2      82.0   235     1268   06 25 11

06 29 10  J1128+5925   16 41 19  32.3 -36.2  5.2      82.4    -5     1268   No stop 
06 30 10  ---          16 42 20  32.2 -36.2  5.2      82.2    55     1276   06 29 11

06 30 10  ARP299       16 42 20  32.1 -37.2  5.2      81.8    -5     1276   No stop 
06 34 10  ---          16 46 20  31.6 -37.1  5.3      81.0   235     1307   06 30 11

06 34 10  J1128+5925   16 46 20  31.7 -36.1  5.3      81.4    -5     1307   No stop 
06 35 10  ---          16 47 20  31.5 -36.1  5.3      81.2    55     1315   06 34 11

06 35 10  ARP299       16 47 20  31.5 -37.1  5.3      80.8    -5     1315   No stop 
06 39 10  ---          16 51 21  30.9 -37.0  5.4      79.9   235     1346   06 35 11

06 39 50  J1128+5925   16 52 01  31.0 -35.9  5.4      80.3    35     1346   06 39 50
06 40 20  ---          16 52 31  30.9 -35.9  5.4      80.2    30     1350   06 39 51
Schedule for SHANGHAI  (Code Sh )                                   Page   7
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

06 40 20  ARP299       16 52 31  30.8 -36.9  5.4      79.7    -5     1350   No stop 
06 44 20  ---          16 56 32  30.3 -36.8  5.5      78.9   235     1381   06 40 21

06 44 20  J1128+5925   16 56 32  30.4 -35.8  5.5      79.3    -5     1381   No stop 
06 45 20  ---          16 57 32  30.3 -35.8  5.5      79.1    55     1388   06 44 21

06 45 20  ARP299       16 57 32  30.1 -36.8  5.5      78.7    -5     1388   No stop 
06 49 20  ---          17 01 33  29.6 -36.7  5.5      77.9   235     1419   06 45 21

06 49 20  J1128+5925   17 01 33  29.8 -35.7  5.5      78.3    -5     1419   No stop 
06 50 20  ---          17 02 33  29.6 -35.6  5.6      78.1    55     1427   06 49 21

06 50 20  ARP299       17 02 33  29.5 -36.6  5.6      77.7    -5     1427   No stop 
06 54 20  ---          17 06 34  29.0 -36.5  5.6      76.9   235     1458   06 50 21

06 55 00  J1128+5925   17 07 14  29.1 -35.5  5.6      77.2    35     1458   06 55 00
06 55 30  ---          17 07 44  29.0 -35.5  5.6      77.1    30     1462   06 55 01

06 55 30  ARP299       17 07 44  28.8 -36.5  5.6      76.7    -5     1462   No stop 
06 59 30  ---          17 11 44  28.3 -36.3  5.7      75.9   235     1493   06 55 31

06 59 30  J1128+5925   17 11 44  28.5 -35.4  5.7      76.3    -5     1493   No stop 
07 00 30  ---          17 12 45  28.4 -35.3  5.7      76.1    55     1501   06 59 31

07 00 30  ARP299       17 12 45  28.2 -36.3  5.7      75.7    -5     1501   No stop 
07 04 30  ---          17 16 45  27.7 -36.1  5.8      74.9   235     1532   07 00 31

07 04 30  J1128+5925   17 16 45  27.9 -35.2  5.8      75.3    -5     1532   No stop 
07 05 30  ---          17 17 45  27.8 -35.1  5.8      75.1    55     1539   07 04 31

07 05 30  ARP299       17 17 45  27.6 -36.1  5.8      74.7    -5     1539   No stop 
07 09 30  ---          17 21 46  27.1 -35.9  5.9      74.0   235     1570   07 05 31

07 10 10  J1128+5925   17 22 26  27.2 -35.0  5.9      74.2    35     1570   07 10 10
07 10 40  ---          17 22 56  27.1 -34.9  5.9      74.1    30     1574   07 10 11

07 10 40  ARP299       17 22 56  26.9 -35.9  5.9      73.7    -5     1574   No stop 
07 14 40  ---          17 26 57  26.4 -35.7  6.0      73.0   235     1605   07 10 41

07 14 40  J1128+5925   17 26 57  26.6 -34.8  6.0      73.3    -5     1605   No stop 
07 15 40  ---          17 27 57  26.5 -34.7  6.0      73.1    55     1613   07 14 41

07 15 40  ARP299       17 27 57  26.3 -35.7  6.0      72.8    -5     1613   No stop 
07 19 40  ---          17 31 58  25.8 -35.5  6.0      72.0   235     1644   07 15 41
Schedule for SHANGHAI  (Code Sh )                                   Page   8
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

07 19 40  J1128+5925   17 31 58  26.0 -34.6  6.0      72.3    -5     1644   No stop 
07 20 40  ---          17 32 58  25.9 -34.5  6.1      72.1    55     1652   07 19 41

07 20 40  ARP299       17 32 58  25.7 -35.4  6.1      71.8    -5     1652   No stop 
07 24 40  ---          17 36 59  25.2 -35.3  6.1      71.0   235     1682   07 20 41

07 25 20  J1128+5925   17 37 39  25.3 -34.3  6.1      71.2    35     1682   07 25 20
07 25 50  ---          17 38 09  25.3 -34.3  6.2      71.1    30     1686   07 25 21

07 25 50  ARP299       17 38 09  25.0 -35.2  6.1      70.8    -5     1686   No stop 
07 29 50  ---          17 42 09  24.5 -35.0  6.2      70.0   235     1717   07 25 51

07 29 50  J1128+5925   17 42 09  24.8 -34.1  6.2      70.3    -5     1717   No stop 
07 30 50  ---          17 43 10  24.7 -34.1  6.2      70.1    55     1725   07 29 51

07 30 50  ARP299       17 43 10  24.4 -35.0  6.2      69.8    -5     1725   No stop 
07 34 50  ---          17 47 10  23.9 -34.8  6.3      69.0   235     1756   07 30 51

07 34 50  J1128+5925   17 47 10  24.2 -33.9  6.3      69.3    -5     1756   No stop 
07 35 50  ---          17 48 10  24.1 -33.8  6.3      69.1    55     1764   07 34 51

07 35 50  ARP299       17 48 10  23.8 -34.7  6.3      68.9    -5     1764   No stop 
07 39 50  ---          17 52 11  23.3 -34.5  6.4      68.1   235     1795   07 35 51

07 40 30  J1128+5925   17 52 51  23.5 -33.6  6.4      68.2    35     1795   07 40 30
07 41 00  ---          17 53 21  23.4 -33.6  6.4      68.1    30     1799   07 40 31

07 41 00  ARP299       17 53 21  23.2 -34.4  6.4      67.9    -5     1799   No stop 
07 45 00  ---          17 57 22  22.7 -34.2  6.5      67.1   235     1830   07 41 01

07 45 00  J1128+5925   17 57 22  23.0 -33.3  6.5      67.4    -5     1830   No stop 
07 46 00  ---          17 58 22  22.9 -33.3  6.5      67.2    55     1837   07 45 01

07 46 00  ARP299       17 58 22  22.6 -34.2  6.5      66.9    -5     1837   No stop 
07 50 00  ---          18 02 23  22.1 -33.9  6.6      66.1   235     1868   07 46 01

07 50 00  J1128+5925   18 02 23  22.4 -33.1  6.6      66.4    -5     1868   No stop 
07 51 00  ---          18 03 23  22.3 -33.0  6.6      66.2    55     1876   07 50 01

07 51 00  ARP299       18 03 23  22.0 -33.9  6.6      65.9    -5     1876   No stop 
07 55 00  ---          18 07 23  21.5 -33.6  6.6      65.2   235     1907   07 51 01

07 55 40  J1128+5925   18 08 04  21.7 -32.7  6.7      65.3    35     1907   07 55 40
07 56 10  ---          18 08 34  21.7 -32.7  6.7      65.2    30     1911   07 55 41
Schedule for SHANGHAI  (Code Sh )                                   Page   9
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

07 56 10  ARP299       18 08 34  21.3 -33.6  6.7      64.9    -5     1911   No stop 
08 00 10  ---          18 12 34  20.9 -33.3  6.7      64.2   235     1942   07 56 11

08 00 10  J1128+5925   18 12 34  21.2 -32.5  6.7      64.4    -5     1942   No stop 
08 01 10  ---          18 13 35  21.1 -32.4  6.7      64.2    55     1950   08 00 11

08 01 10  ARP299       18 13 35  20.8 -33.3  6.7      64.0    -5     1950   No stop 
08 05 10  ---          18 17 35  20.3 -33.0  6.8      63.2   235     1981   08 01 11

08 05 10  J1128+5925   18 17 35  20.6 -32.2  6.8      63.4    -5     1981   No stop 
08 06 10  ---          18 18 35  20.5 -32.1  6.8      63.2    55     1988   08 05 11

08 06 10  ARP299       18 18 35  20.2 -33.0  6.8      63.0    -5     1988   No stop 
08 10 10  ---          18 22 36  19.7 -32.7  6.9      62.3   235     2019   08 06 11

08 10 50  J1128+5925   18 23 16  20.0 -31.8  6.9      62.3    35     2019   08 10 50
08 11 20  ---          18 23 46  19.9 -31.8  6.9      62.2    30     2023   08 10 51

08 11 20  ARP299       18 23 46  19.6 -32.6  6.9      62.0    -5     2023   No stop 
08 15 20  ---          18 27 47  19.1 -32.4  7.0      61.3   235     2054   08 11 21

08 15 20  J1128+5925   18 27 47  19.5 -31.5  7.0      61.5    -5     2054   No stop 
08 16 20  ---          18 28 47  19.4 -31.5  7.0      61.3    55     2062   08 15 21

08 16 20  ARP299       18 28 47  19.0 -32.3  7.0      61.1    -5     2062   No stop 
08 20 20  ---          18 32 48  18.5 -32.0  7.1      60.3   235     2093   08 16 21

08 20 20  J1128+5925   18 32 48  18.9 -31.2  7.1      60.5    -5     2093   No stop 
08 21 20  ---          18 33 48  18.8 -31.2  7.1      60.3    55     2101   08 20 21

08 21 20  ARP299       18 33 48  18.4 -32.0  7.1      60.1    -5     2101   No stop 
08 25 20  ---          18 37 48  18.0 -31.7  7.1      59.3   235     2131   08 21 21

08 26 00  J1128+5925   18 38 29  18.3 -30.8  7.2      59.4    35     2131   08 26 00
08 26 30  ---          18 38 59  18.2 -30.8  7.2      59.3    30     2135   08 26 01

08 26 30  ARP299       18 38 59  17.8 -31.6  7.2      59.1    -5     2135   No stop 
08 30 30  ---          18 42 59  17.4 -31.3  7.2      58.4   235     2166   08 26 31

08 30 30  J1128+5925   18 42 59  17.8 -30.5  7.2      58.5    -5     2166   No stop 
08 31 30  ---          18 43 59  17.7 -30.5  7.3      58.3    55     2174   08 30 31

08 31 30  ARP299       18 43 59  17.3 -31.2  7.2      58.2    -5     2174   No stop 
08 35 30  ---          18 48 00  16.8 -30.9  7.3      57.4   235     2205   08 31 31
Schedule for SHANGHAI  (Code Sh )                                   Page  10
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

08 35 30  J1128+5925   18 48 00  17.3 -30.2  7.3      57.6    -5     2205   No stop 
08 36 30  ---          18 49 00  17.2 -30.1  7.3      57.4    55     2213   08 35 31

08 36 30  ARP299       18 49 00  16.7 -30.9  7.3      57.2    -4     2213   No stop 
08 40 30  ---          18 53 01  16.3 -30.6  7.4      56.4   236     2244   08 36 31

08 41 10  J1128+5925   18 53 41  16.7 -29.8  7.4      56.4    36     2244   08 41 10
08 41 40  ---          18 54 11  16.6 -29.7  7.4      56.4    30     2248   08 41 11

08 41 40  ARP299       18 54 11  16.2 -30.5  7.4      56.2    -5     2248   No stop 
08 45 40  ---          18 58 12  15.7 -30.2  7.5      55.4   235     2279   08 41 41

08 45 40  J1128+5925   18 58 12  16.2 -29.4  7.5      55.6    -5     2279   No stop 
08 46 40  ---          18 59 12  16.1 -29.3  7.5      55.4    55     2286   08 45 41

08 46 40  ARP299       18 59 12  15.6 -30.1  7.5      55.2    -5     2286   No stop 
08 50 40  ---          19 03 13  15.2 -29.8  7.6      54.5   235     2317   08 46 41

08 50 40  J1128+5925   19 03 13  15.7 -29.0  7.6      54.6    -5     2317   No stop 
08 51 40  ---          19 04 13  15.5 -29.0  7.6      54.4    55     2325   08 50 41

08 51 40  ARP299       19 04 13  15.1 -29.7  7.6      54.3    -5     2325   No stop 
08 55 40  ---          19 08 13  14.7 -29.4  7.6      53.5   235     2356   08 51 41

08 56 20  J1128+5925   19 08 54  15.1 -28.6  7.7      53.5    35     2356   08 56 20
08 56 50  ---          19 09 24  15.0 -28.6  7.7      53.4    30     2360   08 56 21

08 56 50  ARP299       19 09 24  14.5 -29.3  7.7      53.3    -5     2360   No stop 
09 00 50  ---          19 13 24  14.1 -29.0  7.7      52.5   235     2391   08 56 51

09 00 50  J1128+5925   19 13 24  14.6 -28.2  7.7      52.6    -5     2391   No stop 
09 01 50  ---          19 14 24  14.5 -28.2  7.8      52.4    55     2399   09 00 51

09 01 50  ARP299       19 14 24  14.0 -28.9  7.8      52.3    -5     2399   No stop 
09 05 50  ---          19 18 25  13.6 -28.6  7.8      51.5   235     2430   09 01 51

09 05 50  J1128+5925   19 18 25  14.1 -27.8  7.8      51.6    -5     2430   No stop 
09 06 50  ---          19 19 25  14.0 -27.8  7.8      51.4    55     2437   09 05 51

09 06 50  ARP299       19 19 25  13.5 -28.5  7.8      51.3    -5     2437   No stop 
09 10 50  ---          19 23 26  13.1 -28.1  7.9      50.6   235     2468   09 06 51

09 11 30  J1128+5925   19 24 06  13.5 -27.4  7.9      50.5    35     2468   09 11 30
09 12 00  ---          19 24 36  13.5 -27.3  7.9      50.4    30     2472   09 11 31
Schedule for SHANGHAI  (Code Sh )                                   Page  11
               Arp 299-A at 1 Gb/s
  UP:  D => Below limits;  H => Below horizon mask;  W => still slewing at end;  blank => Up.
  Early: Seconds between end of slew and start.   Dwell: On source seconds. 
  Disk: GBytes recorded to this point.
  TPStart:  Recording start time.  Frequencies are LO sum (band edge).
  SYNC: Time correlator is expected to sync up.
----------------------------------------------------------------------------------------
Start UT  Source               Start / Stop                 Early    Disk   TPStart
Stop UT                  LST      EL    AZ   HA  UP   ParA  Dwell   GBytes    SYNC
----------------------------------------------------------------------------------------

 --- Wed  23 Oct 2013   Day 296 ---

09 12 00  ARP299       19 24 36  13.0 -28.0  7.9      50.3    -5     2472   No stop 
09 16 00  ---          19 28 37  12.6 -27.7  8.0      49.6   235     2503   09 12 01

09 16 00  J1128+5925   19 28 37  13.1 -27.0  8.0      49.6    -5     2503   No stop 
09 17 00  ---          19 29 37  13.0 -26.9  8.0      49.4    55     2511   09 16 01

09 17 00  ARP299       19 29 37  12.5 -27.6  8.0      49.4    -5     2511   No stop 
09 21 00  ---          19 33 38  12.1 -27.2  8.1      48.6   235     2542   09 17 01

09 21 40  J1128+5925   19 34 18  12.5 -26.5  8.1      48.5    35     2542   09 21 40
09 22 10  ---          19 34 48  12.5 -26.5  8.1      48.4    30     2546   09 21 41

09 22 10  ARP299       19 34 48  12.0 -27.1  8.1      48.4    -5     2546   No stop 
09 25 00  ---          19 37 38  11.7 -26.9  8.1      47.8   165     2568   09 22 11

09 25 00  J1128+5925   19 37 38  12.2 -26.2  8.1      47.9    -5     2568   No stop 
09 26 00  ---          19 38 38  12.1 -26.1  8.2      47.7    55     2575   09 25 01

09 26 00  ARP299       19 38 38  11.6 -26.8  8.2      47.6    -5     2575   No stop 
09 29 00  ---          19 41 39  11.3 -26.5  8.2      47.0   175     2599   09 26 01

09 29 00  J1128+5925   19 41 39  11.9 -25.9  8.2      47.1    -5     2599   No stop 
09 30 00  ---          19 42 39  11.8 -25.8  8.2      46.9    55     2606   09 29 01


SETUP FILE INFORMATION:
   NOTE: If DOPPLER, FREQ, or BW were used, see the individual scans for the final BBC settings.


 ======== Setup file: sess313.C1024
   Matching groups in /Users/torres/sched102/catalogs/freq.dat:
     sh6cm           Update freq. range AnTao 22Mar08

   Setup group:    9         Station: SHANGHAI          Total bit rate: 1024
   Format: MARK5B            Bits per sample: 2         Sample rate: 32.000
   Number of channels: 16    DBE type:                  Speedup factor:   1.00

   Disk used to record data.

   1st LO=   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00
             4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00   4200.00
   Net SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   Pol.  =      RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
                RCP       LCP       RCP       LCP       RCP       LCP       RCP       LCP 
   BBC   =         1         2         1         2         3         4         3         4
                   5         6         5         6         7         8         7         8
   BBC SB=         L         L         U         U         L         L         U         U
                   L         L         U         U         L         L         U         U
   IF    =        C         A         C         A         C         A         C         A 
                  C         A         C         A         C         A         C         A 

  The following frequency sets based on these setups were used.

   Frequency Set:  13  Setup file default.  Used pcal sets:   1
   LO sum=   4942.49  4942.49  4942.49  4942.49  4974.49  4974.49  4974.49  4974.49
             5006.49  5006.49  5006.49  5006.49  5038.49  5038.49  5038.49  5038.49
   BBC fr=    742.49   742.49   742.49   742.49   774.49   774.49   774.49   774.49
              806.49   806.49   806.49   806.49   838.49   838.49   838.49   838.49
   Bandwd=     16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
               16.00    16.00    16.00    16.00    16.00    16.00    16.00    16.00
    Matching frequency sets:  13

  The following pulse cal sets were used with this setup:

   Pulse cal detection set:   1  PCAL = OFF 
    PCALXB1=   S1    S2    S3    S4    S5    S6    S7    S8 
    PCALXB2=   M1    M2    M3    M4    M5    M6    M7    M8 
    PCALFR1=     0     0     0     0     0     0     0     0
    PCALFR2=     0     0     0     0     0     0     0     0

   Track assignments are: 
    track1=   2,  4,  6,  8, 10, 12, 14, 16, 18, 20, 22, 24, 26, 28, 30, 32
    barrel=roll_off 
 SOURCES USED IN RECORDING SCANS --                         Arp 299-A at 1 Gb/s
     Catalog positions marked with *. 
     Precession of date coordinates is based on stop time of first scan.
     Names used in schedule marked with *. 
     Short names used in VLA and SNAP files marked with +. 
     Observation date used in B1950/J2000 coordinate conversion (PRECDATE):  1979.900
     No adjustments are made for rates (DRA, DDEC).
     Scan hours are for recording scans only. 
     Baseline hours are only counted for scans above horizon at both ends.

   Source                         Source position (RA/Dec)                        Error
                        (B1950)             (J2000)             (Date)            (mas)

 * ARP299            11 25 44.174219   * 11 28 33.622010     11 29 18.155063       0.00
                     58 50 18.17319    * 58 33 46.61000      58 29 00.65253        0.00
                     From catalog imbedded in main SCHED input file.
                        4.561 scan and    304.929 baseline hours in setup: sess313.C1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7  8  9 10 13

 * J1128+5925        11 25 23.181652   * 11 28 13.340676     11 28 57.991164       0.00
                     59 41 46.14397    * 59 25 14.79866      59 20 28.68068        0.00
                     From catalog imbedded in main SCHED input file.
                        0.967 scan and     48.365 baseline hours in setup: sess313.C1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7  8  9 10 13

   J0927+3902        09 23 55.319217   * 09 27 03.013938     09 27 54.567709       0.13
   0923+392          39 15 23.56637    * 39 02 20.85177      38 58 29.79946        0.10
 * 4C39.25           /Users/torres/sched102/catalogs/sources.vlba
   J0927+39          rfc_2012b Petrov, 2012, unpublished 239566 observations
                        0.083 scan and      6.334 baseline hours in setup: sess313.C1024
                     Frequency sets (dups not shown):   1  2  3  4  5  6  7  8  9 10 13



  The solar corona can cause unstable phases for sources too close to the Sun.
  SCHED provides warnings at individual scans for distances less than 10 degrees.
  The distance from the Sun to each source in this schedule is:
    Source         Sun distance (deg) 
   ARP299              75.7
   J1128+5925          76.4
   4C39.25             79.3

  Barry Clark estimates from predictions by Ketan Desai of IPM scattering sizes 
  that the Sun will cause amplitude reductions on the  longest VLBA baselines 
  at a solar distance of 60deg F^(-0.6) where F is in GHz. 
  For common VLBI bands, this is: 
       327 MHz        117. deg 
       610 MHz         81. deg 
       1.6 GHz         45. deg 
       2.3 GHz         36. deg 
       5.0 GHz         23. deg 
       8.4 GHz         17. deg 
      15.0 GHz         12. deg 
      22.0 GHz          9. deg 
      43.0 GHz          6. deg 

